Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    æThere is an Emptiness for Maori Here in WaihiÆ - Understanding Indigenous Perspectives on Post-Mine Land Uses in Closure Planning

    By T Hill, J Everingham, P Clark

    Currently, social impact assessment (SIA) is used to determine social impacts across the life-of-mine (LOM) to closure. This paper draws on recently completed SIA reports from the Martha gold mine in

    Jul 10, 2012

  • AUSIMM
    Geometallurgical Modelling of the Dumont Deposit

    By M Sciortino, J Korczak, J Muinonen, A St-Jean

    The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir

    Sep 29, 2013

  • AUSIMM
    Geotechnical Engineering at Ok Tedi - A Multidisciplinary Approach

    By A P MACONOCHIE

    The methods used and some of the results obtained from a major geotechnical study of the Ok Tedi mine area, Papua New Guinea, are described. The study was carried out at both regional and local scal

    Jan 1, 1992

  • AUSIMM
    Investigation on Collector Optimisation in the Reverse – Iron Ore Flotation

    By M S. Cassola

    It’s expected that the world economy will face a stable and continuous growth in the demand of iron ore, reaching more than two billion tonnes per year within the next year. After decades exploiting r

    Jul 11, 2011

  • AUSIMM
    The Re-opening of CSA Mine, Cobar NSW

    By M Scamardella

    The CSA Mine is located at Cobar, New South Wales, where it was in continuous operation from 1966 to the time it went into receivership on 29 January 1998. When it closed it was under the ownership of

    Jan 1, 2000

  • AUSIMM
    Network Analysis of Pre Development Regulatory Procedures

    By Hughes DC

    Coal development in New South Wales can involve a complex series of government approvals, a requirement that results from the coincidence of many development sites with environmentally sensitive ar

    Jan 1, 1983

  • AUSIMM
    Calibration of an Airblast Prediction Model

    By A J. Moore

    To control the airblast from blasting to regulatory limits at environmentally sensitive sites near the Collinsville Coal Mining Operations, it has been necessary for Thiess Mining to incorporate a wav

    Jan 1, 2004

  • AUSIMM
    The Concentrating Practice of the Broken Hill South Limited

    The concentrating plant of the Broken Hill South Limited was described in Proceedings No. 44, Australasian Institute Mining and Metallurgy, December, 1921, by Wainwright and Read. It was erected on th

    Jan 1, 1932

  • AUSIMM
    Comparison of Heap Leach Facility Designs

    By Carlson BL, Overton DD

    This paper compares the designs of heap leach facilities for four precious metal mining projects in the southwestern United States. These four proposed projects are of small-to medium-size relative to

    Jan 1, 1997

  • AUSIMM
    Technical Data Management at Porgera

    By A G. Shellsh, R J. Henham, J R. Foley

    The Porgera Gold Mine, west of Mt Hagen in PNG is a large open pit and underground operation currently producing gold at the rate of almost one million ounces per year. This deposit has produced some

    Jan 1, 2000

  • AUSIMM
    Land Reclamation Trials and Practices at Martha Hill Gold Mine, Waihi, New Zealand (81918f20-43ae-4806-8567-9e3a20ae8542)

    By Gregg PEH, Stewart RB

    Reclamation field trials commenced in 1985, two years before the granting of the Mining Licence. The level of pasture production on varying soil depths (0 cm, 5 cm, 15 cm and 25 cm) overlying both ta

    Jan 1, 1995

  • AUSIMM
    Infrastructure Development for the Ulan Project

    Extensive infrastructure construction works were required for the development of the underground and open-cut coal mine at Ulan to a production capacity of 5 million tonnes of steaming coal per an

    Jan 1, 1983

  • AUSIMM
    The Precipitation of Arsenic from Aqueous Solution in Relation to Disposal from Hydrometallurgical Processes

    By Glastras M. V

    The presence of arsenic in solutions which result from the processing of many sulphide minerals leads to a need to understand its speciation in aqueous systems and the reactions of those various s

    Jan 1, 1987

  • AUSIMM
    Development of Trials for Rehabilitation of a Bucket Wheel Excavator Spoil Dump

    By Walton S, Wheeler D. J, Sargent D. M, Ting L. Y

    Goonyella-Riverside mine is an open cut coal mine in Central Queensland. One component of the mining operations at this site is an uncompacted spoil dump some 50 m above the natural ground surface and

    Jan 1, 1992

  • AUSIMM
    Improving stope extraction in the Hidden Secret orebody at Mt Charlotte Gold Mine

    By B Lance, D O’Brien

    The Hidden Secret ore body is located within the Mt Charlotte underground mining system in Kalgoorlie, Western Australia. Mineralisation of the Hidden Secret ore body is lode style and therefore diffe

    Mar 15, 2021

  • AUSIMM
    Beyond the Mine Gate - The Issues

    By Collins L

    The commercial success of a mining project can be strongly influenced by the business activity which takes place away from the mine site. The project revenue is determined by marketing success whic

    Jan 1, 1997

  • AUSIMM
    Cannington Mine - Back to the Cradle for BHP

    The Broken Hill Proprietary Company Limited (BHP) started as a silver-lead-zinc mining company in Broken Hill, New South Wales, Australia in the 1880s. Since then it has diversified into the resource

    Jan 1, 1998

  • AUSIMM
    Long-Term Performance and Cost Benefit Analysis of Passive Acid Mine Drainage Treatment Systems Installed in the Appalachian Coal Region of the Eastern United States

    By J S. Simmons, J G. Skousen

    This project evaluated the performance of nine passive treatment methods by studying 137 treatment units in eight eastern states. Performance was normalised according to construction cost, projected s

    Jan 1, 2003

  • AUSIMM
    The Exploration Signature of the Coronation Hill Gold, Palladium and Platinum Deposit

    By C A Heinrich, Morse M. P, Cruickshank B. I, Pyke J. G, Whitaker A

    Very little public domain information is available on the exploration signature of the Coronation Hill Au+Pd+Pt deposit. From 1987 to 1990 the BMR (now AGSO) carried out geological, geophysical and

    Jan 1, 1994

  • AUSIMM
    Maximising regional opportunities for in-pit tailings disposal for Queensland coalmines

    By K Baker, J Purtill

    One of the key challenges for the mining industry globally is the rehabilitation of mine waste, and Queensland is no exception. Out of pit waste structures including waste rock dumps and tailings stor

    Aug 2, 2023