Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    Truck Haulage Improvements at the Phu Kham Mine – the Journey to 97 per cent Utilisation of Availability

    By S P. Young, K R. Monro

    Reducing metal prices have forced mining operations to become more efficient and innovate in order to do more with the existing base. Much of this effort has focused on improving the efficiency of loa

    Jun 22, 2016

  • AUSIMM
    A Method to Separate Phases of Sulfur in Mine-Waste Piles and Natural Alteration Zones, and to Use Sulfur Isotopic Compositions to Investigate Release of Metals and Acidity to the Environment

    By C J. Berry, P H. Briggs

    Assessment of metal mobility, acid rock drainage production, and toxic effects from weathering of mineralised materials (ie mine-waste piles and outcropping alteration/ore zones) is key in evaluating

    Jan 1, 2003

  • AUSIMM
    Conventional and real-time sampler comparison study for inhalable and respirable dust

    By B Walsh, M Cattani, S Verpaele

    With the increasing sophistication of real-time sampling devices for occupational hygiene exposure assessment, research to objectively assess their performance is a priority. Using real-time monitorin

    Apr 16, 2024

  • AUSIMM
    The Development of the Aircore Sampling System

    By J M. Wallis

    Heavy mineral sand exploration drilling prior to the 1970s generally utilised open hole auger and air-blast type drilling. However, mining reconciliations were poor and limitations on accuracy and pre

    Oct 5, 2011

  • AUSIMM
    Design and operation of large drum scrubbers

    By G S. Beros, K M. Edwards

    Over the past 20 years drum scrubbers have become a widely adopted technology within iron ore beneficiation plants. Generally, the drum scrubbers in use are considered high-capacity machines capable o

    Sep 18, 2023

  • AUSIMM
    Coal Drift Construction by Tunnel Boring Machine

    By D Sibthorpe

    The employment of a tunnel boring machine (TBM) is the default delivery method for the realisation of traffic, utility and primary resource underground space worldwide, with hundreds of kilometres com

    Sep 17, 2014

  • AUSIMM
    Managing major mining risks using bow-tie analysis

    By B Beale

    Bow-tie analysis is a commonly used tool in the Major Hazard Facility sector to identify, display and control risks that have the potential to pose serious harm to personnel. It is a simple but powerf

    May 5, 2022

  • AUSIMM
    Predicting, Assessing and Managing Sediment Plumes Generated by Sea Floor Mining

    By R Grogan

    Nautilus Minerals (Nautilus) is a sea floor resource exploration and development company focused on developing the Solwara 1 Project, a copper-gold sea floor massive sulfide deposit in the territorial

    Jun 28, 2016

  • AUSIMM
    Evaluation of Precision being Obtained by a Three-Stage Sampling System for Coal

    By C D. Rose

    "The primary objective of this paper is to demonstrate a different approach to predicting and verifying mechanical sampling system precision. Early in the year 2011 an experiment was conducted to eval

    Aug 21, 2012

  • AUSIMM
    Higher Energy Bulk Explosives – Matching Products to Rock Types Using an Energy Map Concept

    By S Thomson, G Rigby, J Norgard, D Wilkinson

    Bulk explosives provide the energy to move a rock mass and reduce it to an optimal size (fragmentation). The intensity of energy needed depends on several factors including a customer’s geology and en

    Aug 24, 2015

  • AUSIMM
    Analysis of the Creep Behaviour of Tunnels in Sandstone/Shale

    By J C. Small

    Time-dependent deformation occurs when geo-materials are under an applied load; this may lead to additional deflection of a tunnel structure and the stress redistribution in the surrounding rock, shot

    Jan 1, 2008

  • AUSIMM
    Mining 4.0 initiatives – a pathway to a smarter mining fleet

    By K Rau

    The overall success of a mining operation is directly impacted by the reliability and availability of mining equipment. Heavy-duty vehicles such as excavators and haul trucks are used for conveying of

    Sep 1, 2024

  • AUSIMM
    Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium Mineralisation

    By M Zengerer

    The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp

    Aug 18, 2014

  • AUSIMM
    Trends in real‐time instrumentation and monitoring techniques for tailings dams

    By L Clarkson, D Williams, P Redcliffe, F van der Wal

    This research presents a snapshot and insight into the trends, patterns, and common considerations identified in the current standing of real-time tailings dam monitoring practice. Based primarily on

    Jul 1, 2021

  • AUSIMM
    World Copper Demand in 2050

    For the mineral industry, sustainability seems to mean socially positive and ecologically neutral mineral extraction. Mines are financed and developed in response to demand for their products. The pur

    Jan 1, 2002

  • AUSIMM
    Mining automation human-systems integration – CMOC-Northparkes case study

    By J Cronin, R Burgess-Limerick, T Horberry, L Steiner

    "Automation offers the mining industry great potential for improvements in productivity and safety. However, the experience of introducing automation in other industries has been that the full potenti

    Oct 16, 2017

  • AUSIMM
    Challenging the Norm – Alternative Excavation Method in Mining

    By R Burke, G Ramage, C Donnelly

    Over the decades, Redpath has undertaken a multitude of tunnelling and underground excavation projects for civil and mining clients both domestically and internationally. These projects have been unde

    Mar 24, 2014

  • AUSIMM
    Non-Destructive Analysis of Diamond Core for Light Elements using Niton Field Portable X-ray Fluorescence

    By P Martin, A Somarin, S Bailey

    Field-based research was conducted to investigate the performance of field portable X-ray fluorescence (FPXRF) in the analysis of reverse circulation (RC) drill chips in iron ore exploration. For year

    Aug 12, 2013

  • AUSIMM
    Improving tungsten recovery through the reuse of mine wastewater

    By Z Gao, D Liao, W Sun, S G. Pooley, J Wang, Z Shi, G Jing, S Ren, Q Chen

    Yuanjing processing plant is a scheelite and wolframite plant in southern China. Water shortages and recent environmental regulations mean that the plant must reuse the wastewater that comes from the

    Aug 24, 2022