Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
JKMRC Mineral Liberation Analyser ù A Modern Tool for Ore Characterisation and Plant OptimisationBy Y Gu
The Mineral Liberation Analyser (MLA) employs the technologies of scanning electron microscopy (SEM) and energy dispersive X-ray analysis (EDX). The use of backscattered electron images to define phas
Jan 1, 2006
-
Exploding the Myths ù A Case Study on Land Use Planning and Quarry BuffersBy M Freeman
In a visionary move, the Planning Commission and the Ministry for Planning in Western Australia decided to invite three extractive industry quarry operators, local government councils and State Govern
Jan 1, 2001
-
Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical TechniquesBy D J. Bradshaw, B Lottermoser, A Parbhakar-Fox
"Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency
Sep 29, 2013
-
A Statistical Approach to Estimating the Number of Grains of Particulate Material in Geological Samples.By Beck RW, Booth GW
Differences in the gold contents of sub-sample duplicates, derived from a single bulk sample are a function of analytical and random error, inhomogeneity within the bulk and natural variations in t
Jan 1, 1989
-
High-Si Rhyolites and Shoshonitic VolcanicsThe transgressive sedimentary sequence of the Notnnea Basin contains rhyolitic lavas and less voluminous mafic and intermediate volcanims of shoshonitic affinities which erupted simultaneously during
Jan 1, 1995
-
Utilising Mineralised Mining Waste – Contributions to the Circular EconomyBy É Lèbre, G Corder
The circular economy concept, as defined by the Ellen MacArthur Foundation (2015) and quoted by the recent International Council on Mining and Metals (ICMM) Guide to Responsible Sourcing, calls for sh
Jun 28, 2016
-
Implementing condition-based wear surface managementBy P Velletri, N Gaylard
The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi
Nov 8, 2021
-
Evolution of In-Seam Drilling for Gas DrainageBy F Hungerford
"In-seam drilling has been undertaken for the past 30 years for gas drainage to reduce the risk ofoutburst and lower the concentrations of seam gas in the underground ventilation. The drillingpractice
Jun 1, 2012
-
Efficiency improvement of Jalal Abad beneficiation plant by concentrate quality enhancement and tailings recoveryBy M Lak, R Amiri, A Haratian, M Asghari, S Haji
In recent years, due to advances in designing of various magnet assemblies, a wide range of magnetic materials with different properties can be concentrated. Jalal Abad iron ore beneficiation plant, w
Nov 8, 2021
-
Mineralogical and Chemical Profile of a Gold RoasterBy Aylmore M. G
Samples have been taken from a two-stage industrial gold roaster treating a pyrite/pyrthotite/arsenopyrite concentrate, in order to describe the mineral- ogy, composition and surface area of the calc
Jan 1, 1991
-
Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut OperationsAnglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines
Nov 25, 2010
-
Application of Mineral Processing in Waste Treatment and Scrap RecyclingProceeding from statistical data on the development of waste volume, an endeavour was made to characterise waste materials with regard to the applicability of treatments based on mineral processing.
Jan 1, 1993
-
Anglo Coal Australia ù Graduates and the FutureAnglo Coal Australia (ACA) takes a proactive position with regards to attracting and retaining employees at a graduate level. Currently, ACA has graduates in its program across all disciplines: Mining
Jan 1, 2005
-
Underwater Blasting in Landslide Blocked RiverBy Dhawan AK
On 8 July 1993, a landslide of about one million cubic metres of rock blocked the river Satluj near Sanjay Vidyut Pariyojana - Bhaba project and caused flooding into the Bhaba Power House (120 MW) r
Jan 1, 1995
-
Mine Water Management in Environmentally Sensitive LocationsThe Coal Corporation of New Zealand Ltd (CoalCorp) is the largest coal producer in New Zealand, with extensive properties in both the North and South Islands. CoalCorp's North Island operations
Jan 1, 1988
-
Inadequate Water Management Planning Resulting in Long-term Closure LiabilitiesBy H J. J Boshoff
Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM
Jul 16, 2014
-
Staying in the Game – the Importance of Engineering-based DecisionsBy P J. Fairfield
This paper reflects on the author’s experience working in site-based technical and management roles over a 29 year period, and the past 12 years in internal and external consulting roles. It discusses
Jun 22, 2016
-
The Removal of Cobalt from Zinc Sulphate Electrolytes Using the Copper-Antimony Process: Kinetics, Mechanisms and Morphological CharacterisationBy Gonzalez-Dominguez J. A, Dreisinger D. B
At Cominco's Zinc Refinery at Trail, British Columbia impurities are removed from zinc sulphate electrolyte by a two-stage purification process using zinc dust. Copper, cadmium and thallium are
Jan 1, 1993
-
Deformation Mechanisms of the South West Rail Link Underpass beneath the Hume HighwayBy S J. Clarke, C S. Walker
The South West Rail Link (SWRL) project involved construction of a rail line to service new residential areas in south-west Sydney. The 11 km rail line is conveyed through a short tunnel at shallow de
Sep 17, 2014
-
Longwall face floor failure assessment using a semi quantitative risk rating methodologyBy S Grimsey, E Janetzki, J Emery
Floor failure on the longwall face is a complex problem due to the dynamic interaction between the surrounding strata and powered roof supports involving multiple variables. It can also be highly prob
Nov 29, 2022