Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ramp-up and long-term performance of the Albion Process™ plant at GeoProMining Gold Armenia

    By D Walker, A Tsvetkov, P Voigt, O Kloiber-Deane

    The GPM Gold Operation has been employing an Albion Process™ plant at its Sotk (Zod) gold mine in Armenia since 2014. Long term data from the operation is now being published for the first time. The

    Aug 29, 2018

  • AUSIMM
    Winning the Safety Battle

    By S Hanrahan, S McLaughlin

    A case study is presented that details the safety journey at a North American project involving two major contracts: a 1000 m shaft recovery and rehabilitation, and the development of a drainage galle

    Jun 22, 2016

  • AUSIMM
    Computers in Metalliferous Underground Mine Planning Where Are We? Where Are We Going?

    Computerisation of mine planning activities, specifically in the areas of geology, design and surveying, has been in progress for a number of years in underground metalliferous mines. The combined c

    Jan 1, 1995

  • AUSIMM
    Productive Partnership – Controlling Vibration and Maintaining Critical Electricity Supply

    By M Nagarajan

    Orica Mining Services (Orica) in partnership with Coal and Allied’s Hunter Valley Operations (HVO) has developed a risk management process to maximise mining efficiency whilst controlling vibration an

    Nov 8, 2011

  • AUSIMM
    Applied Coal Geology with Particular Reference to Coking Coals

    Coal geology plays an essential role in the investigation of in situ coal seam quality. Coal geology can also play an important part in laboratory studies such as coal washing and coking, and in op

    Jan 1, 1976

  • AUSIMM
    Impact of Blast Fragmentation on Hydraulic Excavator Dig Time

    By D Thornton, R Hodson, D Sprott

    Blast fragmentation size distribution and thus blast design have been found to have a direct impact on the load and haul cycle through excavator dig time and bucket payload. Previous studies have demo

    Jan 1, 2003

  • AUSIMM
    The Obuasi Mine - Longitudinal Retreat Mining Method Application and Challenges

    By F Owusu-Mensah, F Nsarko

    The Obuasi Mine has been in operation for the past 100 years. Within this period a host of mining methods have been employed during its various changing phases. The causes for the changes are multiple

    Mar 26, 2012

  • AUSIMM
    Reducing Social Risk and Impact by Engaging Local Communities

    In todayÆs evolving and globalised world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to æengage

    Jan 1, 2007

  • AUSIMM
    Accurately defining failure geometries and their variability

    By E J. Hancock, K H. B Chu

    Failures within hard rock underground excavations have historically been defined by a depth of failure, estimated in the field or through individual measurements, with a simplified failure geometry; s

    Nov 29, 2022

  • AUSIMM
    Bulk sensing for effective ore sorting – learnings over 35 years

    By H Kurth, L Balzan

    The potential for bulk diversion was identified and quickly implemented following the development of bulk sensing technologies applied to conveyed flows. In the early 1980s real time analysis of ash i

    Nov 10, 2020

  • AUSIMM
    The Spent Pot Lining Treatment and Fluoride Recycling Project

    By G Swayn, J Harpley

    Spent Pot Lining (SPL) is an unavoidable waste product of the electrolytic process in the smelting of aluminium. SPL is considered to be a hazardous waste in various countries because it contains sign

    Jan 1, 2002

  • AUSIMM
    Tube bundle analyser flow rate, why it is important

    By M Tsai

    Tube bundle gas monitoring systems have been used in the mining industry for over 50 years. The initial design was based on four individual gas analysers along with a series of solenoid valves, gas sa

    Oct 12, 2022

  • AUSIMM
    Faulting in Heavy Mineral Deposits – Friend or Foe?

    By C Buchanan

    For a long time there has been a known relationship between the northern Heavy Mineral (HM) deposits of the Murray Basin to the extensive north east trending ridges in the area. These ridges have been

    Aug 22, 2011

  • AUSIMM
    Supervisors and Teams at Work

    By T G. Neville, G Terrey, J Burns

    This paper explores recent industry training programs and lessons for supervisors. The Belbin Team Role model was used to increase participants’ awareness of behaviour and its application. The applica

    Jun 22, 2016

  • AUSIMM
    Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation Drilling

    By M Goers, M Almond

    "The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w

    Aug 21, 2012

  • AUSIMM
    An innovative application of gravity separation technology to beneficiate ultrafine iron ore

    By J Lyons, M Hasan, D Pepper, C Vadeikis

    Processing of large volumes of ultrafine ores has long challenged mineral processing operators because of lower recoveries and increased tailings. This has led to many deposits, or parts of existing d

    Nov 8, 2021

  • AUSIMM
    Blasting Harmonics and Controlling Peak Particle Velocity

    By T J. Laing, A B. Richards, A J. Moore

    Blastholes fired in a pattern with a constant initiation delay create a frequency in the ground vibration similar to that from a percussion instrument, such as a drum, in the air. A constant firing de

    Aug 24, 2015

  • AUSIMM
    Trigger Action Response Plans for Diesel Exhaust Exposures

    By J Jeffery, P G. Knott, F Velge, C Evans

    A trigger action response plan (TARP) provides a structured response to escalating levels of risk. In mining, TARPs are typically applied to primary hazards such as inrush, strata failure or heating.

    Aug 31, 2015

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013

  • AUSIMM
    The Re-Opening of the Morning Star Gold Mine: A Case Study of the Ongoing Environmental Monitoring and Planning

    By E Hogan, M Goodz, R Wright

    The planning, permitting and monitoring procedures of the re-opening and rehabilitation of mine sites is an ongoing process which must continue throughout and beyond the life of the project. Both indu

    Jan 1, 1992