Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Will Your Mine Require Cooling?

    By A S. Derrington

    In some parts of Australia, mine air cooling may not be needed until a depth of 1300 m below surface is reached. In other locations, it may be essential at a depth of only 300 m below surface. The rea

    Mar 24, 2014

  • AUSIMM
    Copper-Molybdenum Concentrator Surveys Using Mineralogy and Process Benchmarking Tools to Improve Overall Plant Performance

    By P Thompson, D Rose, S Yu, W Baum, R Zahn, D Meadows, G Hall

    Opportunities to improve mill operations are often cited by mining companies and recognised in many concentrators spread throughout the world but are not always followed through. Copper-molybdenum con

    Sep 1, 2014

  • AUSIMM
    Impact testing of raise bore protection mesh

    By M Doran

    The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3

    Mar 29, 2023

  • AUSIMM
    An assessment of the rate of construction of an upstream raised tailings dam

    By J J. Moreno, J Willis, P Garvey

    Many of the tailings storage facilities (TSFs) in Australia are upstream raised facilities for which the consolidation of the hydraulically deposited tailings is essential to the stability of the TSF.

    Jul 1, 2021

  • AUSIMM
    Carrapateena Vent Rise Performance – Geotechnical Design and Calibration

    By G Balog, T Ormerod, D Sidea

    Carrapateena is a copper-gold sub level caving operation located in the Gawler Craton, South Australia. One of Australia’s largest undeveloped copper deposits, the project will be a 4.25 Mtpa undergro

    Mar 15, 2021

  • AUSIMM
    Geostatistical analyses of cone penetration testing data of a tailings storage facility in a semi‐arid setting

    By P Chapman, B Moosapoor

    The objective of this paper is to present the potential applications of geostatistical analyses in planning CPTu investigations, as well as interpolation of CPTu data. The paper presents a case study

    Jul 1, 2021

  • AUSIMM
    Myuna Multi Seam Colliery Ventilation

    Myuna Colliery long term ventilation requirements were included as part of the overall planning of colliery construction and underground development. Ventilation, during the simultaneous sinking of

    Jan 1, 1983

  • AUSIMM
    Waste batteries – are you prepared for the coming avalanche?

    By D Bush, F Goddard

    The electrification of Australian mine sites will see a boom in the use of batteries of all chemistries. Lead acid batteries, a traditional mainstay of the mining industry, are expected to nearly doub

    Apr 16, 2024

  • AUSIMM
    Optimising Mining Selectivity with Particular Emphasis on Bench Height : A Case Study at the Telfer Gold Mine, Western Australia

    By Whitham M

    Prior to exploitation, the feasibility of mining and recovering ore can usually be determined to a satisfactory level of uncertainty by the consideration of conceptual scenarios, using a range of r

    Jan 1, 1991

  • AUSIMM
    Application of High-resolution Seismic Reflection Surveys to Exploration for Blind Vein Systems at the Cracow Low-sulfidation Epithermal Field

    By J Cook, S Pike, D Pridmore

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The application of high-resolution seismic reflection to map structure and/or mineralisatio

    Mar 18, 2015

  • AUSIMM
    Reassessing Rehabilitation Objectives and Targets for Mature Mining Operations in Queensland

    By T R. Anderson, A R. Butler

    Haymont (2012) notes that in parts of Australia significant areas of mining disturbance cannot be relinquished. In Queensland it has been estimated that by 2010, just 0.3 per cent 507 ha of mining dis

    Jun 28, 2016

  • AUSIMM
    Traceability of native seed for mine rehabilitation

    By A Grant, H Thomas, C Clarke, B Fuller

    Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali

    Aug 2, 2023

  • AUSIMM
    Resource Company Investments in Health – A Life-of-Mine / Life-of-Community Perspective across America

    By A Calderon, J Harris, M Shi, D Viswanathan, C Ribeiro Duthie, P A. Kirsch

    Mineral resource development activities impact the health and well-being of many people, from workers, to families and surrounding communities. In the current environment of corporate social responsib

    Jul 16, 2014

  • AUSIMM
    Effects of Subsidence on Steeptopography and Cliff Lines

    By Carter J. P

    A two year study into the effects of coal mining induced subsidence on cliff lines was undertaken by the Department of Mineral Resources with the support of a grant under the National Energy Resear

    Jan 1, 1992

  • AUSIMM
    Construction and Commissioning of the Lebong Tandai Gold Mine and Treatment Plant

    By West RF, Pooley RH

    An underground mine, a treatment plant and supporting facilities have been constructed at Lebong Tandai in Sumatra, Indonesia by PT Lusang Mining. Throughput is initially 50,000 tonnes per annum

    Jan 1, 1986

  • AUSIMM
    Particle Density Meter

    By R Nicholson, N D. Cox, N W. A Lambert

    "This paper reports on the long-term operation of a particle density meter (PDM) at the Bloomfield coal handling and preparation plant (CHPP). This unit has been operating continuously for over three

    Oct 10, 2016

  • AUSIMM
    Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper Operations

    By D Kent, J Bullock, M Wilkinson

    Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su

    Oct 16, 2017

  • AUSIMM
    Bauxite Mining Environmental Management and Rehabilitation Practices in Western Australia

    By Ward S. C, Gardner J. H

    In 1990, Alcoa of Australia Limited was elected to the Global 500 Roll of Honour of the United Nations Environment Program for the environmental management and rehabilitation of the bauxite mines i

    Jan 1, 1995

  • AUSIMM
    Bulk carrier vessel tracking automation – the Dalrymple Bay use case

    By W Russell, P Wighton, J Franke

    Recent advances in ruggedised industrial control system technology and architecture in combination with latest technologies in the fast-evolving 3D LiDAR sensor sector becoming available have enabled

    Nov 8, 2021

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023