Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geostatical Production Grade Estimation in Mount Isa's Copper Orebodies

    This paper describes a detailed geostatistical study of producing copper orebodies at Mount Isa Mines Limited in Queensland, Australia. As a result of this work, kriging has been adopted for grade est

    Jan 1, 1982

  • AUSIMM
    Australian Participation in the Ocean Drilling Program: an Economic Geology Perspective (Australian ODP Secretariat, Department ofEarth Sciences)

    By Rowena C. Duckworth

    The Ocean Drilling Program (ODP) is the largest international geoscience project in the world, and the state-of-the-art drill ship, the JOIDES Resolution, is permanently at sea. Each year there are s

    Jan 1, 1995

  • AUSIMM
    Development of mine operation value chain flowsheets fine-tuned and constraint based on the process information (PI) data to evaluate proposed operation strategies and ore pre-treatment technologies

    By E Amini, N Beaton

    Application of ore pre-treatment technologies such as Grade Engineering and in-pit ore treatment require comprehensive analysis to show proven value is being generated by switching away from the curre

    Nov 10, 2020

  • AUSIMM
    New Zealand Gold Potential - Using Mineral Prospectivity Modelling to Evaluate Gold-Bearing Mineral Systems in an Underexplored Country

    By K Peters, C McKenzie

    New Zealand has an established history of gold production beginning with the gold rushes of the 19th century in the Coromandel, Nelson/Marlborough, West Coast and Otago regions. Despite this, the numb

    Sep 26, 2013

  • AUSIMM
    Wireless System for Monitoring Cave-back Propagation

    By S Steffen, S Talu, J Poulsen, G Watt, A van As, J S. Ooi

    The economic success of cave mining projects is significantly influenced by the secondary fragmentation size distribution of the caved orebody and making the fragmented ore available for extraction. I

    May 9, 2016

  • AUSIMM
    A New Approach to Metallurgical Accounting

    By S Brochot, M-V Durance

    In many cases, current metallurgical accounting practice does not consider the errors associated with the measurements used in obtaining the metal balance. Considering all measurement errors, includin

    Oct 29, 2012

  • AUSIMM
    The Contribution of Air-Deck Blasting to Open Pit Mining Economics

    By T Laing, M A. Abdalla, P Hagan

    Open pit operators are facing a number of challenges in the area of blasting and blasting processes, such as wall control, quality of fragmentation, explosives consumption and vibration. Remaining fin

    Sep 18, 2012

  • AUSIMM
    The Expanding Role of Mine Geophysics

    Just as geophysics, in the form of 3D seismic and wireline logging, plays a key role in petroleum reservoir management, so too will geophysics play an important role in mining of coal, metals, and min

    Jan 1, 2000

  • AUSIMM
    Computer Simulation of Vibrating Screen in a Dry Classification Circuit Case Study - Gol-e-Gohar Iron Ore Processing Plant

    By A Mehrani, F Zamani, A Dehghani

    Vibrating screens play an important role in the dry classification circuit of Gol-e-Gohar iron ore processing plant. This circuit was designed to classify the autogenous mill discharge and produce a s

    Jan 1, 2007

  • AUSIMM
    Liquefaction behaviour of tailings under cyclic simple shear testing

    By A Li, H Jinto, M Laxman

    The behaviour of tailings under cyclic loading has an impact on the stability and deformation of tailings dams and a good understanding of the cyclic behaviour of the tailings under earthquakes is imp

    Jul 23, 2018

  • AUSIMM
    Reassessment of Controls on the Gold Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania

    By M J. Nugus

    The Geita gold mines in north-western Tanzania have produced 5 Moz of gold from an estimated endowment of 15 Moz. They are generally classified as typical Archaean orogenic banded iron formations (BIF

    Aug 22, 2011

  • AUSIMM
    Benefits Related to Applications of a Mass Blast in Open Cut Mining

    By C Muñoz, N Ortega, J Vergara, D Avilés

    Mass blasts have been the subject of extensive studies because of their potential benefits in mining operations. However, it has not been possible to advance due to the paradigm that states that the b

    Aug 24, 2015

  • AUSIMM
    The practicalities of effective stress measurement in rock

    By I Gray

    This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass

    Nov 30, 2018

  • AUSIMM
    An Inversion Method for the Prediction of Peak Particle Velocity in Blasting

    By A T. Spathis, M L. Lawlor-O’Neill

    A methodology for the inversion of a scaled charge weight superposition model to predict peak particle velocity (PPV) has been examined. The inversion involves two steps: first simulated annealing is

    Aug 24, 2015

  • AUSIMM
    Towards Achieving Sustainable Water Management for an Acidic Open Cut Pit at Mount Morgan, Queensland

    By T Laurencont, C Unger

    The Mount Morgan minesite, located approximately 40 km SW of Rockhampton in Central Queensland, comprises 270 ha of unrehabilitated land which is the currently the major source of acid mine drainage r

    Jan 1, 2003

  • AUSIMM
    Mining Network and the Security Question

    By A Huebner, A Noack

    Companies all over the world are very sensitive concerning their IT and network security. In most network connected technical installations and machines however, network security is not taken into acc

    Sep 26, 2011

  • AUSIMM
    Evolution of SAG Milling Performance ù A Comparison of Alumbrera and Ernest Henry

    By J Mar·n, R Anderson, S Strohma, R Harvey

    Xstrata is the operator of both Minera Alumbrera Ltd (50 per cent Xstrata, 50 per cent Wheaton River) and Ernest Henry Mining Pty Ltd, (99.99 per cent Xstrata), both copper-gold deposits, using conven

    Jan 1, 2003

  • AUSIMM
    Key Operating Parameter Comparison Ciurug Mine Design at Pongkor Gold Mine -- Java-Indonesia

    Pongkor Gold Mines is one of seven units of production owned by PT Aneka Tambang (State owned mining company). The mine is located in the western part of Java Island, Indonesia. It is in the Bogor Dis

    Jan 1, 1997

  • AUSIMM
    Methane-INFO - Graphical, Three-Dimensional Planning and Information System for the Simulation and Prediction of the Methane Emission of Mine Design

    By Ruschitzka C

    The productivity and economic success of a German hard coal mine is attributed to the high productivity of a small number of operation points; however high rates of production are associated with in

    Jan 1, 1995

  • AUSIMM
    Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

    In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days

    Jan 1, 1988