Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Use of Paste for Tailings DisposalBy J Shillabeer
Paste backfill has been adopted by many underground mines in North America and a growing number elsewhere. Paste offers a number of advantages. This paper suggests wider applications of paste technolo
Jan 1, 1998
-
Dust Management - Thinking Outside the SquareDust emissions from mining, material processing and ship loading operations (fugitive dust sources) are an environmental issue of increasing concern to both government regulators and the community. Th
Jan 1, 2009
-
A Historical Perspective of the Application and Success of Geometallurgical MethodologiesBy S R. Williams
There is a sense of geometallurgy being new; a new methodology for mining project development and improved operational strategy. One of the main challenges that any ænewÆ technology faces is a validat
Sep 29, 2013
-
What category cyclone is devastating your plant?By T G. Vizcarra, B Wong
Optimisation projects are regularly undertaken without knowing the root cause of an issue. It is all well and good to trial a multitude of flotation reagents, change the operating characteristics of y
Aug 29, 2018
-
Carrapateena Crusher Station One – Optimisation and excavationBy A Mooney, G Balog, P Burns, R Brooks
This paper outlines the rationale for the location of the crusher, geotechnical analysis and basis of ground support design, design and scheduling of the chamber and supporting excavations as well as
Mar 15, 2021
-
Characterisation and Carbothermal Reduction of a Murray Basin Ilmenite ConcentrateBy Y Li
An ilmenite ore from the Murray Basin was initially characterised using combined X-ray Fluorescence Spectroscopy (XRF), X-Ray Diffraction (XRD), Scanning Electron Microscope (SEM) and Electron Probe M
Oct 5, 2011
-
Impacts of thrust faulting at Goonyella Riverside MineBy H S. Pescini
A material aim when feeding ore blends into a processing facility is to reduce the variability of the properties of the feed material and to maximise the output, or throughput. At the Mining Geology c
Mar 22, 2022
-
Staffing Mines in the Future – Learning from a Gender Study for an Ore Establishment in Northern SwedenBy L Abrahamsson
This paper describes results from a gender study for a new mine in Pajala, a small community in northern Sweden. Using a gender perspective, the study examines migration, education, local culture, the
Nov 22, 2011
-
The Brukunga Pyrite Mine ù A Field Laboratory for Acid Rock Drainage StudiesBy R C. Cox
The Brukunga pyrite mine was operated from 1955 to 1972 to supply feedstock for sulfuric acid production in the South Australian fertilizer industry. Iron sulfide ore, mined by Nairne Pyrite Ltd, was
Jan 1, 2003
-
Post-mining Land Use Options in the Appalachian Coal Mining Region of the USABy J Skousen, C E. Zipper
"Prior to the 1950s in the USA, surface coalmines were generally left without any reclamation. As government regulations advanced, mine operators were required to backfill the area and plant grasses o
Jul 16, 2014
-
A thermodynamic and sustainability assessment of PCB recycling through the secondary Cu smelting processBy A Kamaraj, M Mohanasundaram, R Kumar, P Tikare
This study presents a comprehensive thermodynamic optimisation and sustainability analysis of the secondary copper smelting process for Waste Printed Circuit Board (WPCB) recycling. The study investig
Aug 21, 2024
-
Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow TestsTraditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel
Jul 1, 2013
-
Critical control management – our journey so far and the road aheadBy A Deakin
It has been almost a decade since the release of the International Council of Mining and Metals (ICMM) Health and Safety Critical Control Management: Good Practice Guide (2015a). During this time the
Apr 16, 2024
-
Improved Cleaner Circuit Design for Better Performance Using the Jameson CellBy R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro
In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily
Sep 1, 2014
-
Upgrading Sishen Iron Ore Slimes by Reverse Cationic FlotationBy A Giyose, V Malysiak, K Davey
Batch flotation tests were conducted on a haematite-bearing Sishen iron ore slimes sample from South Africa using reverse cationic flotation. The effect of grinding on flotation performance, the flota
Jan 1, 2009
-
Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automationBy A Mooney, J Marsden, H Grosser, G Dunstan
Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho
Mar 15, 2021
-
Case Studies Demonstrating Value from Geometallurgy InitiativesBy A R. Bye
The mining industry is facing some key challenges that provide a compelling case for geometallurgy initiatives. Over the last 30 years, the average grade of Australian orebodies being mined has halved
Sep 5, 2011
-
Musselwhite Mine - The History of a Giant Gold DepositBy A Cheatle
GoldcorpÆs Musselwhite mine in north-western Ontario, Canada has in recent years become a world-class deposit. Initially discovered in the early 1960s by Alan and Harold Musselwhite, the then marginal
Jan 1, 2009
-
Solomon Iron Deposits – Continued Growth and DevelopmentBy C Simpson
In 2011 the forecasted world demand for iron ore continues to grow, and during this time Australia is looked upon as a reliable supplier of high quality ore. The expansion of the current Australian mi
Jul 11, 2011
-
Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)By Hoskings R
Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equ
Jan 1, 1980