Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Linking safety factor to probability of failure

    By S M. Gover

    Estimating the probability of failure for embankments is not intuitive. It requires not only an appreciation of the strength of the embankment, but an understanding of the variability and uncertainty

    Jul 23, 2018

  • AUSIMM
    Low Density Explosives - A Product that Requires Some Rule Changes

    The basic make-up of the majority of currently produced bulk explosives has changed little in the last 20 years. These explosives would be described as mature in a life cycle analysis. Therefore these

    Jan 1, 2007

  • AUSIMM
    Effect of Flotation Feed Density on the Operation of a Flotation Cell

    By R Crosbie, K C. Runge, E Tabosa, J K. McMaster

    Flotation feed density is an operating parameter which is currently not well understood. Most models of flotation only incorporate its effect on particle residence time, but it is likely to have addit

    Oct 29, 2012

  • AUSIMM
    Dynamic drop testing of Sandvik’s D47 and D39 MDX bolts at the Swerim’s testing facility

    By B Darlington, L Sandberg, O Vallati

    The D47 and D39 Mechanical Dynamic Extra bolts (D47 MDX and D39 MDX) have been developed in response to the ever-increasing demand from the mining industry for rock bolts with high dynamic capacity. T

    Nov 29, 2022

  • AUSIMM
    Post-Mortem Findings on the Performance of Engineered SRB Field-Bioreactors for Acid Mine Drainage Control

    By M A. Harrington-Baker, J M. Trudnowski

    Sulfate-reducing bacteria (SRB) have the ability to immobilise dissolved metals by precipitating them as sulfides, provided that a favourable biochemical environment is created. Such an environment in

    Jan 1, 2003

  • AUSIMM
    Managing steep seam dips and floor shears related dragline bench and lowwall instabilities

    By J Li, J Regan, D Payne

    The Caval Ridge Mine is an open cut coalmine and located within the Bowen Basin region in Central Queensland, and commenced mining and processing operations in 2014. A number of geotechnical challenge

    Nov 29, 2022

  • AUSIMM
    Understanding the Susceptibility of the ZA-27 Zinc Base Alloy to mAcrosegregation and Inverted Pipe Formation

    By Nava-Vasquez E, Torres-Torres J, Mendez-Nonell J

    The ZA-27 zinc base alloy was poured into cylindrical moulds and solidified under different conditions ie normal freezing and unidirectional freezing. In addition a cylindrical ingot with rheocast m

    Jan 1, 1993

  • AUSIMM
    Topsoil Management for Long-term Mine Operation and Closure – A Case Study from Alcoa's Bauxite Mining Operations in South-west Australia

    By A Grigg, L Hackett

    Alcoa operates two bauxite mines at Huntly and Willowdale, located within the jarrah forest south-east of Perth in Western Australia. Ore reserves are shallow but extensive, and mining pits averaging

    Jul 16, 2014

  • AUSIMM
    Improvements on Estimation Tools and the Effect on Mineralisation Base Definition on the Zulti North Heavy Mineral Sand Deposit, Richards Bay, Kwa-Zulu Natal, South Africa

    By J M. Nel

    Richards Bay Minerals (RBM) has recently undertaken an exercise to improve orebody basal definition. Older mineralisation bases (pre-2005) were highly erratic using old protocol reverse circulation (R

    Oct 5, 2011

  • AUSIMM
    Geomechanical Modelling of the Mount Isa Copper Deposit – Predicting Mineralisation

    By R O’Sullivan, D Taylor, J G. McLellan, B Miller

    The Mount Isa copper deposit is located adjacent to the city of Mount Isa, Queensland, and lies within a series of Palaeoproterozoic to Mesoproterozoic Superbasins. The deposit is hosted almost entire

    Aug 18, 2014

  • AUSIMM
    The Introduction of Axis at Black Star Open Cut

    By M Gabbitus, B Young, T Lukins, M Slater

    This paper details the implementation of a new type of grade control system at the Black Star open cut mine in Mount Isa, Queensland. It explores the site requirements for grade control, what as previ

    Sep 18, 2012

  • AUSIMM
    Secondary Ventilation as a Value Proposition – A Case Study

    By A Golsby

    Both primary and secondary ventilation is important in underground mining. Secondary ventilation refers to the provision of ventilation to development ends, stopes and services facilities, which const

    Aug 31, 2015

  • AUSIMM
    Full PSD rejects shear strength testing for co‐disposal and assisted tailings dewatering technique selection

    By G Burton, S Fityus, J Li, S Vaughan, D Payne

    Daunia and Caval Ridge coal mines, owned and operated by BHP, have been co-disposing rejects and dewatered tailings within spoil dumps from the beginning of their operations in 2013 and 2014, with the

    Jul 1, 2021

  • AUSIMM
    Bacterial Oxidation - An Economic Alternative for the Treatment of Refractory Gold Concentrates

    By Budden J. R, Rhodes M. K

    Bacterial oxidation technology was successfully applied in a mine site pilot plant for the treatment of refractory gold concentrates. The bacterial culture was proven capable of selectively breaking

    Jan 1, 1991

  • AUSIMM
    Resources and Reserve Assurance Processes – a Framework for Improved Governance

    By L J. de Lange

    As a material asset for mining entities, the resources and reserves (RR) estimation processes are surprisingly underrepresented in the assurance landscape. When press reports expose them being inaccur

    Jun 22, 2016

  • AUSIMM
    HRC™ HPGR as an energy efficient alternative to horizontal mills in the iron ore processing circuit

    By E Nunes, R Mendes, D Jacobson, G Cota, T Machado, E Santos, J Almeida, E Pereira9, B Raso

    Grinding circuits are known to be the highest consumer of energy used in the ore comminution process, with high operational costs and sensitivity to ore conditions. The mining industry is being encour

    Sep 18, 2023

  • AUSIMM
    Corrosion behaviour of ferrite and aluminate refractories in cryolitealuminium melts

    By M A. Rhamdhani, R Z. Mukhlis

    Removing the ledge formation in the Hall-Heroult cell during the electrolysis process may significantly reduce the energy requirement of the aluminium production process. In the absence of the ledge,

    Aug 21, 2024

  • AUSIMM
    The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel Project

    By C Czerny, T Elkington, L Lorenzen

    The Dutwa Nickel Project is a nickel laterite atmospheric leach project located in Tanzania that has been under development by African Eagle Resources plc (2012). A bankable feasibility study (BFS) ha

    Sep 29, 2013

  • AUSIMM
    An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations

    By S Q. Liu, E Kozan

    This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is

    Nov 24, 2014

  • AUSIMM
    Introducing deep learning and interpreting the patterns – a mineral deposit perspective

    By I Sucholutsky, D M. First, D Mogilny, F Yusufali

    Machine learning is creating value in all facets of the mining industry, from exploration to production. The authors provide an accessible, high-level introduction to artificial intelligence (AI), mac

    May 24, 2023