Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Quantitative airblast risk assessments for block and sublevel caves

    By C Vejrazka1

    The occurrence of airblasts is one of the principal mining hazards in caving operations between the time of cave establishment and breakthrough of the cave to surface. As such, it needs to be managed

    Oct 12, 2022

  • AUSIMM
    Pairing Magnetic and E-field through-the-Earth Communication Systems Based on Mine Site Conditions

    By S J. Schafrik, E S. Gilliland, E C. Jong, J Waynert, C W. Weiss

    Two commercially available through-the-Earth (TTE) communications systems were evaluated at an active underground longwall mine in West Virginia. One system utilises magnetic field (H-field) antennae

    Nov 4, 2015

  • AUSIMM
    Developing and maintaining mine site ventilation capability and new trends in mine ventilation career paths

    By D J. Brake

    The importance of mine ventilation to health and safety in both coal and metalliferous mines has been long recognised. The primary and secondary ventilation systems in most metalliferous mines incur 5

    Oct 12, 2022

  • AUSIMM
    Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in Brisbane

    By A Purwodihardjo

    Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t

    Mar 8, 2011

  • AUSIMM
    Blasting Logistics at Rio Tinto Coal Australia's Hail Creek Mine

    In March 2003, Rio Tinto Coal AustraliaÆs (RTCA) new Hail Creek open cut coal mine commenced operations in the Bowen Basin. Hail Creek is a two-seam strip mining operation utilising two 90 m3 dragline

    Jan 1, 2007

  • AUSIMM
    Integrated Drill and Shovel Performance Monitoring Towards Blast Optimization

    By Scoble M, Peck J

    This paper reviews the instrumentation and monitoring of blasthole drills and electric mining shovels at a surface coal mine in western Canada. The drill monitoring component involved the developmen

    Jan 1, 1990

  • AUSIMM
    A Non-destructive Testing Method for Measuring Bolt Condition

    By B Jones, M Chappell

    Installing ground support correctly is not an easy task, whether lack of operator training, poor ground conditions or underperforming equipment. Confirming the quality of installation can help with pl

    Nov 5, 2014

  • AUSIMM
    Commissioning of Production Blasting with the EXEX 1000 Electronic Delay Detonator Sytem

    By Jones M

    The concept of precise, accurate timing with Electronic Delay Detonators (EDDs) was first seriously addressed in the mid-1980s and much was made of the cheapness and profusion of digital watches in

    Jan 1, 1995

  • AUSIMM
    Assaying Cyanide-Extractable Gold Within an Hour, and Addressing Effects of Preg-and Assay-Robbing

    Cyanide-extractable gold is far more meaningful in the definition of ore, and control of extraction, than fire- assayable or aqua regia digestible gold. The use of cyanide- extractable gold addresse

    Jan 1, 1992

  • AUSIMM
    The Casposo Gold-Silver Project – Process Selection and Design

    By D Connelly

    Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi

    Aug 8, 2011

  • AUSIMM
    Steaming Coal Evaluation by Pilot Combustion Testing

    The Australian Coal Combustion Testing and Research Facility has been operating commercially for one year and during that period coal product evaluations have been conducted on behalf of four coal

    Jan 1, 1987

  • AUSIMM
    Northparkes Mines - New Performance Benchmarks for Underground Mining

    For more than 15 years after the Northparkes orebodies were first discovered in 1976, the project was delayed by the need to find an economic way of mining the low-grade E26 deposit. The decision to

    Jan 1, 1997

  • AUSIMM
    Chromite and Other Ultramafic Detrital Minerals from the Morobe Coast, New Guinea

    Beach sands on the Morobe coast of New Guinea contain significant amounts of chromite. This chromite, together with the more abundant associated minerals such as olivine, enstatite, tremolite, anti

    Jan 1, 1973

  • AUSIMM
    The Simple Facts about Sampling Gold Ores

    By T Day, I G. Robertson, G J. Lyman

    "Various approaches are used in the industry for establishing procedures (sample mass estimation and method of subsampling) for sampling and analysis of gold ores. The key factors that determine the a

    Oct 10, 2016

  • AUSIMM
    Consideration of asymmetric drive geometry and conditions on the loading capacity of pastefill barricades

    By M Revell, B Sainsbury, D Sainsbury

    This paper extends the existing knowledge associated with the design and placement of prefabricated pastefill barricades through a consideration of asymmetric drive geometry and conditions. The load c

    Nov 29, 2022

  • AUSIMM
    Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New Zealand

    By W Newns

    This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.

    Mar 8, 2011

  • AUSIMM
    VertiMill® Performance Updates in Secondary and Regrind Duties at Cannington Mine, BHP Billiton

    By J Allen, B Oats, S Palaniandy, M Lollback

    The Julius Kruttschnitt Mineral Research Centre has conducted an intensive VertiMill® (VTM) survey program at the Cannington mine concentrator as part of the ‘collaborative research in stirred milling

    Sep 1, 2014

  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011

  • AUSIMM
    Application of Simulation Technology to the Design of Coal Clearance Systems

    Longwall mining operations have been in place in Australia since the early 1960s. This mining method is currently used to extract the bulk of coal obtained from underground mines in Australia (CSIRO,

    Sep 26, 2011

  • AUSIMM
    Issues in Capital Raisings and Disclosure

    By B Dodd

    This paper details how the Australian Securities and Investments Commission (ASIC), as a disclosure and conduct regulator, approaches regulation of continuous disclosure, capital raising and control t

    Nov 20, 2012