Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mine Pit Slope Geotechnical DesignMine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri
Jan 1, 2006
-
Technology change in underground mining – things to considerBy A G. L Pratt
Change and its relationship with the introduction of new technology is a constant of human history. The mining industry has many examples of this relationship. This record contrasts with its present d
Oct 16, 2017
-
Blasting Near Mine Surface InfrastructureBy A J. Moore
Blasting operations in open cut mines results in airblast, ground vibration and rock movement with the potential for wild flyrock. In some mines there is a trend towards blasting closer to established
Nov 8, 2011
-
A Practical and Rigorous Approach for Integrating Sustainability Principles into Decision-Making Processes at Minerals Processing OperationsBy D Tuazon, M Powell, M Ziemski, G D. Corder
Although mining companies have made broad corporate-level commitments to adopt sustainability, there continue to be problems when attempts are made to adopt higher-level sustainability aspirations and
Jul 10, 2012
-
Mitigation of Post-blast Fume in Soft Ground and Wet ConditionsBy S S. Kanchibotla, E J. Sellers, L Julian, A Musunuri
Fume events in coalmines are typically associated with wet conditions, soft ground and deep holes. An ACARP research project used laboratory and field testing combined with literature reviews, numeric
Aug 24, 2015
-
Geologists and the Value Chain – How Material Characterisation by Modern Mineralogy can Optimise Design and Operation of Processing FacilitiesBy K Ehrig, C Lower, V Liebezeit, M Smith, E Macmillan
"Minerals, minerals, minerals. Elements occur in the earth as minerals. If local physical, chemical and structural conditions are conducive to concentrating these minerals to sufficiently high abundan
Aug 18, 2014
-
Improved hydration management on Australian mine sites with the MX3 hydration testing systemBy T Kilpatrick
Managing heat stress on Australian mine sites is a complex and enduring challenge due to the combined and variable contribution of environmental conditions, physical activities, and protective equipme
May 5, 2022
-
Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground ConditionsBy M Norbert, D O’Connor
The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set
Sep 17, 2014
-
Advancing Near-Mine Exploration with an Updated Geological Model for the Mount Wright Gold Deposit, QueenslandBy K Johnson, G Morrison, N Lisowiec
The Mount Wright gold deposit is located near the town of Ravenswood, ~90 km south of Townsville, in north Queensland. The deposit has been mined by underground methods since 2006. It produced approxi
Sep 26, 2013
-
Present Practices And Future Trends In World Dry Bulk Handling OperationsOver a century ago the first ship designed solely for carrying a bulk cargo was launched. This vessel, the "John Bowes", with a deadweight of 660 tonnes was a single decked ship with machinery and
Jan 1, 1973
-
Northparkes Mines – Flotation and Planning for the FutureBy G Harbort, D Clarke, D Morgan, C Sola
Northparkes Mines commenced production in 1994 and the mine has significant reserves to allow operation into the future. There are a number of potential future concentrator feed sources with variable
Sep 1, 2014
-
Telfer Project Process Plant DesignBy R Dunne, G Lane, S Ha, D Dreisinger
The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine
Jan 1, 2003
-
Resources versus Reserves – Towards a Systems-based Understanding of Exploration and Mine Project Development and the Role of the Mining GeologistBy J P. Sykes, A Trench
"World-class mine projects are increasingly failing to become world-class mines. Non-technical, socio-political and environmental problems seem, in part, to be the cause. However, the intangible and q
Aug 18, 2014
-
Mining Grade Control ù Past, Present and FutureThe objectives of mining grade control are presented and examples of the techniques used in various open pit and underground mines are used to define the attributes of good grade control. Reasons are
Jan 1, 2000
-
Changing Restoration Priorities in the 21st Century – Opportunities for Novel Ecosystem Design in Mine ClosureBy P Audet, D Doley
The mining industry often embraces mine closure criteria that require the reinstatement of predisturbance or even presettlement (ie historic) ecosystems. However, the extent and severity of disturbanc
Jul 16, 2014
-
The coalmine roof rating – an update in its calculation and mechanistically why it worksBy M Colwell
The Coal Mine Roof Rating (CMRR) is a rock (roof) mass classification (RMC) system/index that was originally developed by the United States Bureau of Mines (USBM) for aspects of underground coalmine g
Nov 29, 2022
-
The Application of Ausmelt's AM28 Alkyl Hydroxamate Flotation Reagent to Fox ResourcesÆ West Whundo Copper Ore at Radio Hill, Western AustraliaBy K Lee, L Mann, J Bygrave, G Sheldon
Ausmelt is supplying commercial quantities of an alkyl hydroxamate flotation collector AM28 for flotation of oxide and supergene base metal ores and tailings. AM28 is a non-hazardous product used as a
Jan 1, 2007
-
Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam DepositBy M K. Kapo, S C. Nzama
The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte
Aug 18, 2014
-
Practical measures of process efficiency and opportunityBy G R. Ballantyne, A N. Mainza, M S. Powell, M Evertsson
Quantifying the performance of a comminution circuit relative to the potential that can be achieved is a standard requirement in justifying operating practice (the stick) and seeking operational upsid
Aug 24, 2022
-
Acid Rock Drainage Prevention Using Inert Gas Mixture TechnologyBy H Barrie, L Ameglio
"Current methods for acid rock drainage (ARD) mitigation revolve around insulation of the waste from oxygen in the atmosphere with water and dry (soils and liners) covers. Both are of limited effectiv
Jul 27, 2015