Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Case Study Assessing Alternative Data Collection Techniques and Analysis Methods to Assist with Geotechnical Slope Design

    By C Bellia, A Maldonado, S Strong, H Baxter

    This paper discusses the technical and cost benefits of alternative data collection techniques used to collect lithological information, obtain laboratory testing samples and perform in situ testing.

    Jul 13, 2015

  • AUSIMM
    On Structural Analyses of Oriented Bore Cores from the West Wallsend No.2 Colliery Holding

    Structural analyses of oriented bore core sections from the West Wallsend No.2 Colliery Holding together with investigations in adjac- ent collieries and on the surface delineated structural phenome

    Jan 1, 1972

  • AUSIMM
    Determination of Bulk Density in Anglo American plc, Methods and Impacts, with a Case Study from Los Bronces Mine

    By R M. Arellano, D M. W Harney, M Makhuvha

    Mineral resource and ore reserve estimates are founded on two sources of data: tonnage and grade. The tonnage is a product of volume and density; both of which are estimates. Density impacts numerous

    Aug 18, 2014

  • AUSIMM
    Post Closure Management of the Mt Leyshon Gold Mine - Water the Integrator

    By T Baumgartl, D Mulligan, R Haymont

    Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the

    Jan 1, 2006

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • AUSIMM
    Minimising Blast Damage to the Extraction Level of Northparkes Mine's E26 Block Cave

    Optimal drill and blast design is a process often neglected by many underground hard rock mines. This is even more important to the new mine where ring designs need to be implemented and refined in

    Jan 1, 1995

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Innovation in an Uncertain World

    As Pliny commented two millennia ago, The only certainty is that nothing is certain. Despite the many breakthroughs, advances and promises, the way we each live and work remains awash with technologic

    May 1, 2010

  • AUSIMM
    Importance of the simple shear loading direction to the stability of tailings storage facilities

    By D Reid

    The engineering properties of soils and tailings often exhibit significant anisotropy. One area where this has been well documents is undrained shear strength. Materials sheared in directions close

    Jul 23, 2018

  • AUSIMM
    The Use and Abuse of Feasibility Studies – Has Anything Changed?

    By N Cusworth, W R. Mackenzie

    "In 2007, the authors presented a framework for the conduct of resource project feasibility studies and provided guidance on minimum standards and best practice (Mackenzie and Cusworth, 2007).This pap

    Mar 8, 2016

  • AUSIMM
    Treatment Plant Innovation at Garden Well

    By W T. C Kendall, H D. Ngo

    Garden Well is a shear-hosted Archaean orogenic gold deposit located 100 km north of Laverton, Western Australia. The Garden Well processing plant is designed for a nominal 491 t/h milling rate and an

    Sep 26, 2013

  • AUSIMM
    Effects of Initiation Delay Time on Narrow Reef Stope Blasting

    By Brinkmann J. R

    In the narrow stopes of South African gold mines, rockbreaking is carried out by drilling and blasting with safety fuse and igniter cord being used as the initiation system. The fuse/gniter cord sys

    Jan 1, 1990

  • AUSIMM
    A review of risk management for tailings dams; learnings from other high hazard industries

    By M Erskine, R Mills

    This paper approaches tailings dam risk management from the perspective of how other high hazard industries approach the management of their catastrophic event risks, with the aim to provide recommend

    Jul 1, 2021

  • AUSIMM
    Gold Room Procedure at Lake View and Star, Ltd.

    Recovery of gold by smelting zinc dust concentrate has been carried on at Lake View and Star, Ltd., since July, 1930, when the Merrill-Crowe precipitation plant was first put into operation.Part I des

    Jan 1, 1948

  • AUSIMM
    Challenging Perceptions? Sustainability Reporting, the Media and Mining

    By P Clark, P A. Kirsch, R Tapia Rivera

    Community members’ sources of information about companies’ social investments are often influenced by the messages in a variety of communication channels, such as newspapers, television and social med

    Jul 16, 2014

  • AUSIMM
    Advanced mine to mill application at the Barrick Cortez mine

    By J Young, S Yu, P Moyo, M Powell, A Musunuri, B Bonfils, S Kanchibotla, P Yaroshak, V Jokovic

    The appropriate design of liners continues to be an issue on many mills worldwide. Loss of milling capacity especially at liner change, uneven wear lives along the mill, substantial scrap on worn line

    Aug 29, 2018

  • AUSIMM
    Minimum sample mass from reverse circulation grade control drilling at Rocklands copper project

    By M G. Hawtin

    The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida

    Sep 20, 2017

  • AUSIMM
    Blasting Vibration Assessment and Innovative Blasting Methods in High-density Urban Environments

    By J W. Muir, N Bedford

    Hong Kong is one of the most rapidly developing cities in the world. With constant population growth and limited opportunities for space, the development of a fast and effective underground public tra

    Sep 17, 2014

  • AUSIMM
    Hydroseparation Concentrates and Automated Precious Metal Searches Used to Characterise Process Products from Selected Mines

    By R Lastra, Y Choi, C Hamilton, P Kondos

    Hydroseparation (http://www.cnt-mc.com) was used to concentrate sized fractions (from <38 ¦m to 150 ¦m) of various ore products ahead of carbon-in-pulp (CIP)-treatment. The resulting size-by-size c

    Jan 1, 2008

  • AUSIMM
    Development of Effective Rehabilitation Protocols for Mineral Sands Mining in Virginia, USA

    By W L. Daniels, C Stilson, C Zimmerman

    Mineral sands mining for ilmenite, rutile and zircon has disturbed over 1000 ha of prime farmland in Virginia (USA) since 1997 and additional areas are likely to be disturbed in Virginia and North Car

    Jul 10, 2012