Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    When Does Further Processing at the Mine Site Make Sense?

    By G Lane, S La Brooy

    A century ago, new mines were often accompanied by smelters. In Australia, smelters were built at the Daydream mine near Broken Hill, at Kuridala and Mount Elliott near Mount Isa, Broken Hill, Mount L

    Jan 1, 2008

  • AUSIMM
    Rock Deformation and Mineralization at Mount Isa

    By Hall G

    The Mount Isa silver-lead-,zinc deposit possesses a number of features which sets it apart from usual occurrences of ores containing those metals. The deposit has been described in vario:us papers, bu

    Jan 1, 1942

  • AUSIMM
    Rio Tinto’s strategic assurance response to the Brumadinho tailings dam failure

    By J Lapwood, S Pal, M Pascoe

    The devastating failure of Dam I at the Corrego do Feijao iron ore mine near Brumadinho in Brazil on 25th January 2019 left at least 270 people dead or missing. In the immediate aftermath of this even

    Jul 1, 2021

  • AUSIMM
    21st century relining – the path to greater mine site profitability

    By P Rubie, J Russell

    This paper looks at the past, present and not too distant future of grinding mill relining.Since the adoption of autogenous grinding (AG) mills and semi-autogenous grinding (SAG) mills as the primary

    Aug 29, 2018

  • AUSIMM
    Mining Truck Operations in Association with Truch-Jig Apparatus

    This paper describes a mine truck hauling process called "Truck Jigging" which is currently the subject of a process patent application.The investigation explores the production and cost adv

    Jan 1, 1989

  • AUSIMM
    Developing Resilient Water Monitoring Programs in Changing Climate Conditions

    By A D. Price, W J. Germs, O Patterson, T R. Weaver

    "Understanding controls on groundwater and surface water flow and quality at mine sites throughout all mine stages is critical to effectively manage environmental impacts over the entire mine life. Mo

    Nov 26, 2013

  • AUSIMM
    Research Into the Revegetation of Concentrator Tailings Dams at Mount ISA

    By Whiteman P. C, Stacey G. S, Hunter G. D

    Processing of lead-zinc and copper ores by Mount Isa Mines Limited produces large quantit- ies of concentrator tailings waste which is pumped as a slurry to special dams where the solids are allowed

    Jan 1, 1974

  • AUSIMM
    A Method for Establishing Site Specific Coal Pillar Design Guidelines

    By Mills KW

    Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factor

    Jan 1, 1992

  • AUSIMM
    Formulating and Solving Complex Minerals Industry Optimisation Problems û A Systems Approach to Complex Systems Problems

    The paper provides an overview of the development and content of APCOM symposia since their inception in 1961. This development is set within the context of the academic environment in which much of t

    Sep 26, 2011

  • AUSIMM
    Environmental Leaching - Predicting Real Long-Term Site-Specific Leaching Performance

    Environmental leaching methods such as the toxicity characteristic leaching procedure (TCLP) test or the ASLP test are used to assess wastes including mining and mineral processing by-products. These

    Jun 1, 2010

  • AUSIMM
    Safety Culture and Resilience Engineering - Exploring Theory and Application in Improving Gold Mining Safety

    Contemporary approaches to safety management appear to be failing short of meeting its mark in improving mine safety. This is evidenced by the high workers compensation, high incidence rates and fatal

    Aug 1, 2010

  • AUSIMM
    Design Investigations for a Steel Lined Pressure Tunnel in the King River Power Development, Tasmania

    The King River Power Development on the West Coast of Tasmania has involved the storage of the waters of the King River in the new Lake Burbury and their diversion through a 7 km tunnel to a 144 MW po

    Jan 1, 1993

  • AUSIMM
    Geotechnical monitoring at the Porgera Mine

    By Yambu J, Titus K

    Geotechnical investictations and monitoring have been integral to development of the Porgera Gold Mine. The steep, unstable terrain has required a program for monitoring of slopes and foundations whic

    Jan 1, 1994

  • AUSIMM
    Dartbrook Mine- Greenfield Opportunities in the Upper Hunter Valley

    Dartbrook mine is a new greenfields thermal coal longwall mine located n the Upper Hunter Valley ten kilometres north of Muswellbrook Figure 1). Construction began in April 1993 with coal extraction

    Jan 1, 1995

  • AUSIMM
    Guidelines for the Design of Rope Guides

    Rope guides, consisting of ropes spanning between anchor points at the top and bottom of shafts, have frequently been considered as a viable alternative to fixed guides, comprising buntons and guides.

    Jan 1, 2005

  • AUSIMM
    Ore Selection Optimisation for an Iron Ore Deposit Using Linear Programming

    By M Aros, L Reilly

    Iron ore is normally sold in bulk at certain specifications. These include iron grade and specific contaminant grades, typically silica, alumina, phosphorous and sulfur. These target grades are normal

    Nov 24, 2014

  • AUSIMM
    Soil Air Carbon Dioxide and Oxygen Measurements as an Aid to Exploration for Concealed Sulphide Mineralisation in South Australia - a Practical Assessment

    By Morris B. J

    Soil air samples taken from the top one metre of the soil profile, were measured for C02 and 02 using portable field analysers at a number of sites of known sulphide mineralisation in South Australia.

    Jan 1, 1993

  • AUSIMM
    Manual Control, Process Automation or Operational Performance Excellence – What is the Difference?

    By P Thwaites

    The mining industry uses many types of mineral and metallurgical plants to produce saleable product from ore mined. Plant design history has left current operations with a mixture of manual operation

    Sep 1, 2014

  • AUSIMM
    Monitoring Equipment Productivity Improvements in Coal Mines

    By Sengstock G. W, Spathis A. T

    Benchmarks of mine equipment involved in the excavation process of coal mines would suggest that such equipment is not always operating at an optimum level. Dragline operations and truck/shovel oper

    Jan 1, 1995

  • AUSIMM
    A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental Assessment

    By M Ind, B Usher

    Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture

    Jul 16, 2014