Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Update on Precious Metals in Deep Geothermal Waters of the Taupo Volcanic Zone (TVZ)

    By K L. Brown

    Sampling and analyses of deep waters from Wairakei and Rotokawa geothermal systems indicate a wide range of precious metal concentrations (<0.1 to 23 ppb Au; 6 to 2400 ppb Ag), suggesting that east

    Jan 1, 2006

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    Alignment and Differences between the Australian Water Accounting Standard and the Water Accounting Framework for the Minerals Industry

    By A Woodley, A N. Danoucaras

    In 2012 the Bureau of Meteorology, under the banner of the Water Accounting Standards Board, released the Australian Water Accounting Standard 1 (AWAS 1). This standard has been in development since 2

    Nov 26, 2013

  • AUSIMM
    Queensland Nickel - Value-Added Products from Technological Advances (c558ef59-3d56-447f-a7ad-fc4833bf589d)

    The Yabulu refinery of Queensland Nickel Pty Lld near Townsville now imports more than three million wet tonnes per year of nickel laterite ore from New Caledonia and Indonesia, making it the largest

    Jan 1, 1995

  • AUSIMM
    The Rise of the On-Site Geotechnical Engineer

    The current boom in the mining sector has required mining operations to ramp up production to meet the international demand for minerals. This increase in production is putting enormous pressure on on

    Jan 1, 2006

  • AUSIMM
    Site Investigation and Design for Melbourne’s New Metro

    By H Asche

    The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper

    Mar 8, 2011

  • AUSIMM
    Reclamation - The Use of Computer Aided Design to Integrate Reclamation and Mine Planning

    Mine planning typically involves designing an operation to uncover coal with the minimum initial costs with reclamation planning and earthworks being done as an "add on" task. The landform is too st

    Jan 1, 1991

  • AUSIMM
    Designing and Operating Backfill Systems on a South African Gold Mine

    For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,

    Jan 1, 1998

  • AUSIMM
    Cannington Mine Development Project 1993 - 1998

    The Cannington silver lead zinc deposit is located near Mt Isa in North West Queensland. This world class orebody is owned by BHP World Minerals (BHP) and is estimated to contain 45 million tonnes of

    Jan 1, 1998

  • AUSIMM
    Achieving an Environmentally Sustainable Stream Diversion Design in an Opencast Mining Area

    Solid Energy New Zealand Limited owns and operates the Ohai coal field (Wairaki Coal Mining Licence, CML) in western Southland. The Morley Stream passes directly through the middle of the CML and has

    Jan 1, 2005

  • AUSIMM
    Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) Mine

    By K Rozlapa, P Waters, H Middlemis

    A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s

    Jan 1, 2006

  • AUSIMM
    Using Life Cycle Assessments and Multi-Criteria Decision Analysis Models for Ex Ante Sustainability Assessment

    By G A. Blengini, S V. èolar

    The minerals industry is faced with choices beginning in the exploration phase and extending over the life cycle of the mine. Firms examine the technical feasibility of alternative actions and typical

    Jan 1, 2009

  • AUSIMM
    Integration of Oil Sands Mine Planning and Waste Management Using Goal Programmin

    By E Ben-Awuah

    Mine planning is the backbone of all mining enterprises and determines the profitability or otherwise of any mining investment. Providing high quality ore and tailings containment at the right time ar

    Sep 26, 2011

  • AUSIMM
    A National Code for Reporting Coal Resources and Reserves

    In November 1986 the Australian Minerals and Energy Council (AMEC) endorsed an "Australian Code for Reporting Identified Coal Resources and Reserves" for use by the Federal and all State Governments

    Jan 1, 1987

  • AUSIMM
    Solute Transport Studies for a Tailings Disposal Site

    By P H. Warton

    It is proposed to construct a gold extraction plant at Matatoki, near Thanes. Ore to be processed at the mill will come from reopened and enlarged underground mines north of Thanes. The project has be

    Jan 1, 1987

  • AUSIMM
    Union Reefs: A Project Assessment and Development Case History

    By Giles D, Wegmann D

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    The McArthur Lead-Zinc-Silver Deposit (6bbc0ffa-ed17-44c3-ba3c-758c85cd106f)

    By Jephcott S

    The McArthur lead-zinc-silver deposit is of the stratiform type. It consists of a mineralized bituminous shale sequence containing some tuffites, numerous graded beds and isolated slump breccia horizo

    Jan 1, 1980

  • AUSIMM
    A Review of the Influence of Gas Pressure on Block Stability during Rock Blasting

    Blasting is an essential component of most mining operations, and is used to reduce the rock mass to a workable size distribution, as well as to create stable openings and pit walls. Frequently, there

    Jan 1, 1999

  • AUSIMM
    Application of Technology for Final Wall Damage Control at Cerro Vanguardia, Argentina

    By W R. Adamson

    Cerro Vanguardia SA (CVSA), property of AngloGold Ashanti, mines gold and silver from a system of vetiforme orebodies located in the south of the Argentine Patagonia, in the Province of Santa Cruz.Sur

    Nov 8, 2011

  • AUSIMM
    Stability of Hydraulic Backfill Barricades (eefd356e-6d40-4b19-af58-7f0537046a1f)

    Hydraulic backfill is generally retained in slopes using permeable barricades. Mitchell et a! (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades e

    Jan 1, 1998