Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower ProjectsBy A G. Noble
Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of
Mar 8, 2011
-
Multiphysics modelling and virtual motion simulation to optimise mining systems in extreme conditions – insights from Mars Science Laboratory (MSL) Curiosity RoverBy S Padekar, C Tapia, D Likhachev, S Harlikar, D Sapkale
In the quest to access valuable critical minerals, humankind is expanding the frontier into extreme environments like space and deep-sea mining. These ambitious enterprises involve considerable costs
Sep 1, 2024
-
Scaled depth of burial application to increase blast efficiency in PT. Indo Muro KencanaBy A Suwandhi, H Utama
PT. Indo Muro Kencana (PT.IMK) is a gold mine that is located in Central Kalimantan, Indonesia. Drilling and blasting activity is applied in order to support mining production. Drilling and Blasting (
Jun 22, 2022
-
Northern Australia - Leads in World-Class Mineral Deposits: Land Access, Infrastructure and Government Policy Support are Vital Keys to the FutureBy W J Fisher
Northern Australia leads in world-class mineral deposits' is a bold statement. First there must be a starting point. Land north of the Tropic of Capricorn (23¦ 26' 5") will be regarded as
Jan 1, 1994
-
Vibration energy harvesting for self-powered sensors at mine sitesBy H Zhang, M Karimi, M Hassan, S Saydam, B Li
With the prevalence of Mine Internet of Things (MIoT), different types of sensors have been widely deployed in mine sites for environmental monitoring and operational management. Currently, sensors in
Sep 1, 2024
-
Cardox Blasting Trials at Waihi Gold MiningBy A Van Kersen, J Hodson
Waihi Gold Mining Co Ltd [WGM], operated by Normandy Mining, has been internationally recognised for its achievements in environmental management at the Martha Mine at Waihi. In a proactive approach t
Jan 1, 2001
-
Re-Invigorating Unloved ProjectsBy D Price
Mining at the Tuckabianna Mining Centre in the Murchison district of Western Australia ceased in 1997, after the production of 550 000 ounces of gold at an average grade of 2.5 g/t from 22 separate op
Aug 22, 2011
-
AGL Energy, Loy Yang and GHD – a Further Case Study in Alliancing: Ten Years onBy J Missen, P Currie, J Bohan, D Clark
AGL is one of Australia’s leading integrated energy companies and the largest ASX listed owner, operator and developer of renewable energy and thermal generation in the country. AGL owns and operates
Jun 22, 2016
-
Sulfidisation-Acidification-Recycling-Thickening (SART) for Complex Gold OresBy A Hall, D Kratochvil, P Littlejohn
Economic recovery of gold from complex gold ores, including poly-metallic deposits, is impacted by the presence of cyanide-soluble base metals. These base metals can create both a metallurgical challe
Sep 26, 2013
-
Evaluating the Effects of Non-coaxial Charges for Contour BlastingBy J Seccatore, F Golin, E Munaretti, M Cardu, J C. Koppe, J Bettencourt
Contour blasting is commonly performed by employing linear charges decoupled from the boreholes. This method is common in surface and underground excavations, either for civil or mining purposes. To a
Aug 24, 2015
-
Isasmelt and IsaMills ù Models of Successful R&DMIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen
Jan 1, 2002
-
Laboratory Investigations Leading to the Design of the King Island Scheelite Company's New ConcentratorCONTENTSThe significance of values givenINTRODUCTIONTHE ORE1. DATA SECURED FROM THE MILLING PLANT AS OPERATING BETWEEN 1938 AND 1942(a) Mill Recoveries(b) Mill Flow Sheet(c) Scheelite-Garnet Associati
Jan 1, 1944
-
In-Pit Crushing and ConveyingBy I Lourel
In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t
Jan 1, 2009
-
Eliminating Unidentified Misfires at Xstrata ZincÆs Open Pits Through the Application of Electronic DetonatorsBy R Small, S Combrinck, R Lindsay
Maintaining your competitive edge in the growing Australian mining sector today is an arduous task. With an ever increasing demand to extract more ore, safely, complete visibility throughout the blast
Sep 18, 2012
-
On the Influence of Fundamental Detonics on Blasting PracticeBy A Minchinton
With blasting, all far-field phenomena including, but not limited to, stress wave propagation, fracture, vibration and muck pile formation are intrinsically and irrevocably dependent upon near-field p
Aug 24, 2015
-
In data, we trust – navigating through the age of AI in the mining industryBy M Pyle, R Ch, G Lane, ramhan
Data is the most valuable commodity in the information age. The use of data enables productivity, opportunity, and safety in various sectors and industries. In the late 1950s, Alan Turing coined the t
Sep 1, 2024
-
An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western AustraliaBy C F. Stokes
The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)
Aug 22, 2011
-
Petrochemical Variations of Island Arc's Andesites (Kurile Island Arc)The problem of comparison of island arc's andesites in terms of petrochemical data is exa- mined. It is definitely established that only two main factors exist controlling the petroche- mical v
Jan 1, 1987
-
The Use of Geotechnical Instrumentation to Optimise an Engineered Mine Design at Beaconsfield Gold Mine, TasmaniaBy P B. Hills, R J. Walton
Geotechnical instrumentation has been implemented as a key step for monitoring and optimising an engineered mine design for managing seismicity at the Beaconsfield Gold Mine. Measurements of displacem
Jan 1, 2008
-
The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction ConsiderationsBy S Goff
The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the
Mar 8, 2011