Search Documents

  • AUSIMM
    Copper Waste Dump Leaching

    Copper waste dump leaching is growing in importance because of the.large tonnages (up to 250,000 ton/day) of low grade waste rock available from open cut mining of copper deposits and proof that contr

    Jan 1, 1967

  • AUSIMM
    Post-Mine Leaching of Galena and Marmatite at Broken Hill (ea61d7ab-2e88-4fdc-9bea-cd90f66cb557)

    By Blanchard R

    The discussion submitted by Drs. Stillwell and Edwards is at once helpful and gratifying to the authors. Their contribution deals with two phases of the problem-(I) an additional suggestion for the re

    Jan 1, 1943

  • SAIMM
    Information As An Alternative To Mineral Rights Taxation

    A new system for granting access to mineral rights is proposed in the recently released White Paper, ?A Minerals and Mining Policy for South Africa?. Official policy states that ?Government?s long-ter

    Jan 1, 1999

  • SME
    Dynamic Simulation Of Grinding Circuits As An Aid For The Diagnosis Of Hydrocyclone Malfunction - Preprint 09-100

    By C. Bazin

    Grinding circuits are operated in the presence of disturbances due to ore changes and equipment malfunctions. One of the challenges faced by the operators is the detection of a disturbance, the identi

    Jan 1, 2009

  • TMS
    Hoboken Converter Performance Improvements At The Phelps Dodge Miami Smelter

    By Ovidiu Pasca

    The Phelps Dodge Miami Smelter utilizes four Hoboken converters to process molten matte from the Isasmelt vessel. This paper presents past and present improvements in operation, maintenance and proce

    Jan 1, 2005

  • CIM
    Environmental and Financial Savings for Belt Conveyors by Using Paramid as Reinforcing Material.

    By Heidi Beers

    Teijin Limited ? Global technology-driven group operating in six main fields Advanced fibers and composites business group Healthcare business group Trading and retail business group IT business

    Aug 1, 2013

  • NIOSH
    OFR-153(4)-82 Bureau Of Mines Oil Shale Data Bank - Part III - Recent Research Projects - Introduction

    By Richard E. Thill

    The Bureau of Mines' Oil Shale Data- Bank (OSDB) was created in 1976 to serve as a centralized source for the storage, retrieval, and dissemination of technical literature, patents, and informati

    Jan 1, 1982

  • IOM3
    Behaviour of magnesia-bearing fluxes during iron ore sintering

    By B. M. England, L. C. Mackey

    Magnesia minerals are included in most iron ore sinter mixes to provide the MgO requirements of blast furnace slag. The properties of these minerals have an influence on the eventual sintering propert

    Jun 18, 1905

  • AUSIMM
    Shaft Plumbing at Mount Isa

    In the plumbing of vertical shafts the methods employed and equipment used, are generally made to best suit existing conditions. Undoubtedly, there is no method that can be called standard or that can

    Jan 1, 1940

  • AUSIMM
    Calibrated Geotechnical Measurement to Provide a Quantitative Understanding of Rock Mass Conditions at the Tasmania Gold Mine, Beaconsfield, Tasmania

    Judicious placement of a range of geotechnical instruments was employed at the Tasmania gold mine, Beaconsfield, Tasmania, as a key strategy in the monitoring of rock mass conditions over the past fou

    Nov 25, 2010

  • NIOSH
    OFR-26-86 Development Of The Claw Hammer Scaling Tool

    By James D. Eklund

    Towards the goal of improving safety, economy and efficiency of scaling in underground metal/nonmetal mines, Battelle developed a combination prying/hammering scaling tool. A prototype was subject

    Jan 1, 1983

  • AUSIMM
    Field Trial of a Bulk Mineral for the Assay of Nickel in Lateritic Ores

    By Garnsey R. G T, Wenk G. J, Toop A, Sowerby B. D

    A bulk mineral analyser (BMA) suitable for the determination of Cu or Ni in bulk ore samples has been developed at the Lucas Heights Research Laboratories. This analyser, which uses the nuclear resona

    Jan 1, 1983

  • AUSIMM
    Drilling and Blasting Cost Estimation

    Drilling and blasting are an essential part of most mining operations, and are commonly major operating cost centres. The effectiveness of blasting can have a significant influence on all subsequent

    Jan 1, 1990

  • CIM
    Accurassay Laboratories: State-of-the-Art Automation of the TSMC Iron Ore Lab

    By Brad McBain

    Agenda ? Accurassay Laboratories and Automation ? History and experience ? Features and benefits of automation in the lab ? Tata Steel Minerals Canada (TSMC) Iron Ore Laboratory ? State-of-the a

    Aug 1, 2013

  • AIME
    The Outlook for Silver

    By Robert Linton

    THE PURCHASE of silver by the United States Government under the provisions of the Pittman Act is practically completed. Producers of silver in this country will now have to market their silver in com

    Jan 6, 1923

  • CIM
    The Link between Pulp Zone Hydrodynamic Characteristics and Froth Stability in a 125 m3 Flotation Column

    By D. Knuutila, G. Goyette, James A. Finch, G. Bartolacci, A. Fortin, Chi Ho Lau, A. Lockhart

    "In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collect

    Jan 1, 2008

  • AIME
    Production and Preparation of Blast-furnace Flux

    By P. C. Hodges

    WHILE there is very little romance connected with the operation of a stone quarry, yet to those who have participated in the growth and development of a business that has been a pioneer in its field a

    Jan 1, 1936

  • SME
    Risk Management In Action—Controlling Difficult Ground By Innovation

    By A. Moergeli

    The Swiss are building the world’s longest tunnel, the 57-Kilometer (35-mile) long Gotthard Base Tunnel. Lot 252, Tunnel Amsteg: Two Hard Rock Tunnel Boring Machines (TBM) crossed hydro-thermally deco

    Jan 1, 2007

  • IOM3
    Recycling of spent Denox catalysts

    By M. Foguenne, A. van Lierde, P. Henry

    Leaching experiments were carried out on a spent catalyst sample with a honeycomb structure, containing 47.5% Ti, 5.8% Mo, 2.7% Si, 2 035 ppm As, 52 ppm Pb and 8.8 ppm Hg. More than 93% of the Mo and

    Jun 19, 1905

  • NIOSH
    IC 6973 Annual Report Of The Mining Division For The Fiscal Year 1937 ? Introduction

    By Chas. F. Jackson

    The work of the Mining Division is divided among seven sections, each in charge of a supervising engineer, as follows: 1. Metal-mining methods section, the supervising engineer of which is also su

    Jan 1, 1937