Search Documents

  • CIM
    Water Recovery via Natural Freeze-Thaw

    By E. Shum, V. G. Papangelakis

    "Attempts to reduce the energy requirements of water recovery in the process industries have resulted in the development of techniques to freeze and purify aqueous solutions that take advantage of loc

    Jan 1, 2017

  • NIOSH
    OFR-15-74 Standardization Of Controls For Underground Electric Face Equipment - Section 1. Introduction - Background

    By William G. Hedling

    The operation of electric face equipment in underground coal mines has proven to be extremely hazardous to mining personnel, including equipment operators and others working in the vicinity of active

    Jan 1, 1974

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their Analyses

    By Eiji Kojima

    In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn

    Jan 1, 2006

  • CIM
    Condition Monitoring and Basic Maintenance?. One Without the Other?

    ? Founded In 1953 ? Mining growth of 83% since 2007 ? We produced over 1 million ounces of Au in 2012 ? We Forecast of 20% Au production in 2013-2015 ? We have paid a dividend 31 years consecuti

    Aug 1, 2013

  • TMS
    Production of Structural Products from Copper Mining Tailings

    By Thomas Weyand, Thomas Claridge, Dale Nickels

    "This paper addresses the initial results of a project to evaluate the suitability of copper mining tailings as raw material for the production of structural products using PMET’s patented technology.

    Jan 1, 2008

  • NIOSH
    IC 7436 Safety Catches on Mine Cages and Methods of Testing Them

    By J. H. East, D. Harrington

    "INTRODUCTION Shaft mines, coal and noncoal alike, have a common hoisting problem that remains largely unsolved - how to obtain a mechanical device that will suspend a cage or skip in a mine shaft if

    Feb 1, 1948

  • DFI
    Skirt Suction Foundation - Application To Strait Crossings -

    By Takashi Saito

    Since early 1970?s skirt suction foundations (skirted foundation / bucket foundation) have been used as support for large fixed substructures or anchors for floating structures in offshore hydrocarbon

    Jan 1, 2013

  • NIOSH
    Mineral Highlights - General (e83082ae-4423-42b4-9d0c-2714fd984824)

    The Anaconda Copper Company reportedly reached an exclusive agreement with Cook Inlet Region, Inc., to explore 24 million acres in south-central Alaska and to share equally with Cook the proceeds of a

    Jan 1, 1981

  • CIM
    Concentrate Dewatering Modernization at the INCO Thompson Smelter

    By Mika Muinonen

    "Dewatering of nickel concentrate at the INCO Thompson integrated mine-metallurgical site takes place within the smelter plant. The eight original 60 foot diameter cable torque thickeners of which fou

    Jan 1, 2006

  • AUSIMM
    Automation for efficient separation with the Outotec SLon® vertically pulsating high gradient magnetic separator

    By I Sherrell, R Jain, P Jansson

    With the depleting iron reserves and difficult market conditions, precision in separation efficiency is of utmost importance. Classical local control options are predominant in the industry, but their

    Jul 24, 2017

  • SME
    Pillar Design and Coal Burst Experience in Utah Book Cliffs Longwall Operations

    Longwall mining has existed in Utah for more than half a century. Much of this mining occurred at depths of cover that significantly exceed those encountered by most other U.S. longwall operations. De

    Jan 7, 2020

  • ISEE
    The Assessment of Environmental Impacts of Blasting During The Construction of A Metro Tunnel

    By Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Mehmet Aksoy, Kagan Ozdemir, Adiguzel Deniz

    This paper presents the results of ground vibration measurements induced by blasting during the construction of the Istanbul Kadiköy-Kartal metro tunnel which has been driven at a depth of approximate

    Jan 1, 2007

  • SME
    Prospectors and Developers Meeting – Some Reflections

    By Bruce Gellar

    In March, the Prospectors and Developers Association of Canada (PDAC) held its annual conference in Toronto, Ontario. This is the third PDAC meeting the author has attended. The following are some

    Jan 1, 1999

  • AIME
    May 26, 1930; 2 P.M ; R. F. McElvenny Presiding

    R. F. MCELVENNY.- Over 20 years ago I went back East on a little tour of copper companies to see how copper was handled and fabricated, and I met a Mr. Bassett who took me through the Waterbury branch

    Jan 1, 1930

  • NIOSH
    RI 3473 Annual Report Of The Nonmetals Division - Fiscal Year 1939

    By Oliver C. Ralston, and others

    "INTRODUCTION Investigations of the Nonmetals Division are now conducted at College Park, Md.; Tuscaloosa. Ala.; Seattle, Wash.; and. Norris, Tenn. The last of these was acquired, this year by arrange

    Oct 1, 1939

  • ISEE
    A Case Study Applying the Multiple Blasthole Fragmentation Model (MBF) at an Open Pit Mine

    By C. McAllister, D. Preece, J. Berendzen

    The Multiple Blasthole Fragmentation (MBF) model was developed recently and has been reported in previous papers. The MBF model accepts inputs from the blast design, such as: location and orientation

    Jan 1, 2016

  • SME
    Design And Preliminary Testing Of Low-Energy Planetary Excavator - Preprint 09-134

    Development of a permanent human base on the Moon for exploration requires a self sustaining system. This entails production and processing of limited amounts of raw material on the Moon. Any mining a

    Jan 1, 2009

  • SME
    Ecosystem Restoration Within The Anchor Hill Pit Lake, Gilt Edge Mine Superfund Site, South Dakota

    By J. Jonas, J. M. Harrington, K. Wangerud, S. D. Fundingsland, J. G. Harrington

    EPA NRMRL Mine Waste Technology Program and Region VIII Superfund office are jointly conducting an in-situ technology demonstration at the Anchor Hill Pit Lake, Gilt Edge Mine Superfund site. The goal

    Jan 1, 2004

  • SME
    Reclamation of Canmore Creek; Example of a Successful Walk Away Pit Lake Closure

    By H. Gerry Stephenson, Devin Castendyk

    "One of the most important environmental issues associated with contemporary openpit mining is the closure of mine pit lakes, and the perpetual legacy these lakes can potentially generate. Ideally, su

    Aug 1, 2019