Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Detection of Abandoned Mines and Air Passages/Burning Centers of Mine Fires by Combined Electromagnetic Method

    By Shu Yan

    The high resolution resistivity method (HRRM) is developed specifically for detecting underground cavities and tunnels. HRRM has a special feature in that it can recognize and cancel static shift, whi

    Jan 1, 2005

  • SME-ICGCM
    Rapid Assessment Of Gateroad Roof Stability By Simple Monitoring Techniques

    By Peter Cain

    In response to the appearance of excessive convergence of bolted gateroads in the front abutment zone of retreating coal faces at Phalen Colliery, staff from the CANMET Cape Breton Coal Research Labor

    Jan 1, 1996

  • SME-ICGCM
    A Hydrogeomechanical Study Of Overburden Aquifer Response To Longwall Mining

    By G. J. Hasenfus

    This paper presents the results of an extensive hydrological and geomechanical monitoring program which Gas conducted at a longwall coal mine in W. Va. The field program included monitoring of groundw

    Jan 1, 1988

  • SME-ICGCM
    Nonlinear Approach For Determining Design Criteria For Yield Pillar Performance

    By W. Smith

    The U.S. Bureau of Mines (USBM) is using laboratory and computer-based techniques to investigate the post- failure behavior of yielding pillars and pillar reinforcement techniques to control entry def

    Jan 1, 1995

  • SME-ICGCM
    Analysis of Small-Scale Thrust Faults and Their Effect on Coal Mining in Southern West Virginia

    By Thomas Z. Jones

    Deep mining within the Sewell Coal member of the New River Formation in southern West Virginia has exposed several small-scale thrust faults and related features. The faults were en- countered in West

    Jan 1, 1986

  • SME-ICGCM
    Effect of the Interchamber Pi Yield on the Surface Strains in the Movement Trough Edges

    By Mikhail P. Nesterov

    The paper presents the results of the research that can forecast the development of subsidences and deformations of the earth surface with time in the permanent marginal areas of the movement troughs

    Jan 1, 1997

  • SME-ICGCM
    Effects of In-seam and Near-seam Conditions and Asymmetric Pillar Loading on Coal Pillar Strength

    By Daniel W. H. Su

    The importance of incorporating fundamental principles of rock material response and failure mechanics into a pillar strength design model has been demonstrated. To accurately assess pillar strength,

    Jan 1, 1997

  • SME-ICGCM
    Rock Mechanics Property Data Bank For Coal Measure Strata

    By G. C. Sun

    Rock mechanics properties, i.e. uniaxial and triaxial compressive strength, indirect tensile strength shear strength, Young's modulus, and poisson's ratio were collected for coal and related

    Jan 1, 1993

  • SME-ICGCM
    Application of the Coal Mine Roof Rating, Derived from Drill Core, in the Roof Support Design of a Coal Belt Conveyor Tunnel

    By John Rusnak

    The Coal Mine Roof Rating (CMRR) is a practical rock mass classification system for use in design of mine openings. Data can be obtained for this purpose from exploration drill cores if simple geotech

    Jan 1, 1998

  • SME-ICGCM
    Interaction Subsidence In The Sydney Coalfield, Nova Scotia

    By Peter Cain

    The paper presents previously unpublished results derived from an unique interaction moitoring program conducted in the Sydney Coalfield of Nova Scotia. An abandoned, sealed longwall gateroad was r

    Jan 1, 1996

  • SME-ICGCM
    Design Of Longwall Extractions Under Flooded Abandoned Workings In The Sydney Coalfield

    By Peter Cain

    Longwall extraction in the Phalen Scam in the Sydney Coalfield of Nova Scotia is carried out under flooded abandoned workings in the Harbour Seam 140 m above, and at depth of up to 700 m beneath the A

    Jan 1, 1996

  • SME-ICGCM
    Ultra-Close Multiple-Seam Mining ? Analysis and Verification

    By Daniel W. Su

    This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int

    Jan 1, 2012

  • SME-ICGCM
    Mining Through In-panel Entries and Full-face Recovery Room Without

    By John Smyth

    Mining through in panel entries and the full face recovery method has been successfully practiced at U.S. Stwl, Mine 50. Suppat of the cut-through entries and recovery room is critical. Traditionally,

    Jan 1, 1998

  • SME-ICGCM
    Probabilistic Analysis of Blasting Impact on Open Pit Stability (95ce6127-68ed-453f-9268-476a1af1dd45)

    By Dae S. Young

    A new probabilistic approach is introduced for slope stability analysis including adverse impact of blasting vibrations. The material strength within a slope area is randomized in this bi-variate join

    Jan 1, 1984

  • SME-ICGCM
    Development of in-situ stress measurement technique using ultrasonic wave attenuation method - A progress report

    By Y. L. Sun

    The feasibility of using the ultrasonic wave attenuation method for measuring in-situ stress is examined theoretically and experimentally. The theoretical analyses show that for a given rock type the

    Jan 1, 1989

  • SME-ICGCM
    Development of Timedependent Surface Subsidence Over the Total Extractions Areas of the Potash Beds Stoped with Interchamber Yield Pillars

    By M. P. Nesterov

    The method of predicting the time-dependent surface subsidence for gently-inclined potash deposits where total extraction using various sizes of yielding bamier pillars was discussed.

    Jan 1, 1998

  • SME-ICGCM
    Five Stress Factors Conducive To Bumps In Utah, USA, Coal Mines

    By Joe F. T. Agapito

    High stresses and adverse geology in deep coal mines in the state of Utah, USA, have caused numerous bumps. The larger bumps have been associated with seismic events with Richter magnitudes of 3.6 and

    Jan 1, 2000

  • SME-ICGCM
    Sizing Of Final Stumps For Safer Pillar Extraction

    By Christopher Mark

    Pillar recovery continues to be one of the more hazardous activities in underground coal mining. Safety requires that the roof above the intersection remain stable until after the pillar has been extr

    Jan 1, 2001

  • SME-ICGCM
    Optimizing Pillar Design In A Multi-Seam Environment

    By R. Kanniganti

    The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec

    Jan 1, 1995

  • SME-ICGCM
    25 Years of Progressive in Numerical Modeling for Ground Control ? What Have We Accomplished and Where Do We Go Next?

    By Keith A. Heasley

    Exactly 25 years ago this month (August 12, 1981), IBM introduced the ?Personnel Computer? with a 16 bit operating system called MS-DOS 1.0. Since then, Moore?s Law, which essentially states that

    Jan 1, 2006