Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Fine Coal Cleaning Using A Centrifugal Fluidized Bed Separator

    By Mutombo Nombe, Avimanyu Das, Rick Honaker

    Enhanced gravity separators (EGS) provide a more efficient separation than froth flotation when cleaning coal in the 150 x 25 µm particle size range. To improve the performance of an EGS unit, air bub

    Jan 1, 2005

  • SME
    Moon Creek Reclamation Project Creative Solutions For An Historic Mine Site

    By B. A. Ridolfi, S. M. Alvarez

    The Moon Creek Reclamation Project provides a case study in the development of creative cleanup solutions for an abandoned lead and zinc mine and mill site located in northern Idaho. Innovative design

    Jan 1, 1999

  • SME
    Design of the Brightwater Conveyance Tunnels

    By Leon Maday, Dan L. Pecha, Jeremy Johnson, Daniel N. Adams

    The Brightwater conveyance system includes 26 km of tunnels, a 130 mgd pump station, 2 km of micro tunnels, and a 2.4 km outfall. The tunnels extend from Woodinville to Puget Sound through varying soi

    Jan 1, 2005

  • SME
    Geochemical Profiling Of A Sulfide Leaching Operation: A Case Study

    By S. M. Flaherty, R. E. Scheffel, A. Guzman

    Geochemical conditions within a leaching operation are heterogeneous. This variability arises mainly from hydrological controls imparted by physical characteristics of the ore and by heterogeneous me

    Jan 1, 2006

  • SME
    Gold Mineralization In The Coffee Creek Area; White Gold District (Dawson Range), West-Central Yukon ? Introduction

    By A. J. Wainwright

    The Coffee Creek lode gold discoveries are located in the White Gold district (Dawson Range), west-central Yukon, 130 km south of Dawson City and 30 km south of the Golden Saddle gold deposit (Figure

    Jan 1, 2012

  • SME
    Support Of The Leipzig City—Tunnel Extension Using A Tie-Back Supported Freeze Wall

    By Helmut Hass, Michael B. Gilbert

    The extension of the commuter railway system (S-Bahn) in Leipzig, Germany willrequire the construction of an underground line crossing the downtown area of thecity to tie the Bavarian Station in the S

    Jan 1, 2007

  • SME
    The Effect Of Bit Geometry And Size On Cutting Parameters In Linear Cutting

    By A. W. Khair

    This paper deals with the design characteristics of cutting tools and the operating parameters these tools are usually subjected to. Eight types of cutting tools/bits with different geometrical shapes

    Jan 1, 2001

  • SME
    The Dissolution Of Copper Sulfides Under Reducing Conditions

    By C. A. Young, R. G. Robins, E. J. Dahlgren

    The formation of copper thio-complexes in sulfide solutions has been recognized for many years and the measured solubilities of certain copper sulfide minerals attributed to these complexes. Attempts

    Jan 1, 2001

  • SME
    Stillwater Mining Company Nye Concentrator Operation

    By D. J. Turk

    Stillwater Mining Company’s, Nye Operation has been producing PGM concentrate since 1987.Several expansions have allowed for increasing capacity from the initial rate of 500 tons per day, to its prese

    Jan 1, 2000

  • SME
    The Development Of Kalengwa Mine In Zambia

    By Peter B. Knuckey

    1, Introduction Location Kalengwa mine is located in the North Western Province of Zambia, 402 kilometre by unpaved road to the west of Kitwe, which is roughly in the centre of the Zambian Copperbel

    Jan 1, 1971

  • SME
    Ground Control Design For Highwall Mining (237c3f7a-5149-4dad-a860-b8b9ad20fedb)

    By R. Karl Zipf

    Highwall mining is an important surface coal mining method, and it may account for approximately 4% of total U.S. coal production. Highwall stability is the major ground control related safety concer

    Jan 1, 2005

  • SME
    Coal Mine Ventilation Returns to Centrifugal Fans

    By Les Gutzwiller

    Fan applications in the mining industry have changed during the last 70 years. In 1922, J.R. Robinson authored a technical volume entitled Practical Mine Ventilation. At that time, atmospheric contr

    Jan 1, 1999

  • SME
    Prediction Versus Actual Response of Rocks in an Excavation of Underground Cavern at the Lam Ta Khong Pumped Storage Project

    By Pratoomkhuan N. Lertsgoon

    A large underground cavern with dimensions of 25m × 175m × 49m (W×L×H) was excavated in sandstone and siltstone to house 4 units of hydropower generator and was completed in 2000. In feasibility study

    Jan 1, 2003

  • SME
    Liner System Protects Oils Sands’ Tailings Area

    Syncrude Canada produces a large part of Canada’s crude oil supply. The company processes about 225,000 bbl/day. The oil produced is used for jet and automobile fuel, home heating oil, plastics and

    Jan 1, 2000

  • SME
    Implementation Of Advance Control On Rougher Flotation At Teck Pogo Mine - Preprint 09-119

    The Pogo Mine, near Delta Junction, Alaska is a 2500 TPD gold operation employing processes including grinding, gravity, rougher flotation, leach, CIP, and E/W. An OCS(Optimizing Control System) exper

    Jan 1, 2009

  • SME
    Nitrogen Inertization At San Juan Coal Company’s Longwall Operation

    By Jacques F. Abrahamse, Kevin A. Bahe, T. Arthur Palm, Gregory E. McCluskey, Stephen L. Bessinger

    Introduction Basis For System San Juan Coal Company (SJCC) is a subsidiary of BHP Billiton. Until recently, BHP Billiton operated three surface mines in northwestern New Mexico: Navajo, San Juan,

    Jan 1, 2005

  • SME
    Movements Due to Freezing, Thawing and Tunneling Beneath Two Buildings

    By K. E. Wood, K. J. DiRocco, L. A. Becker

    The Russia Wharf segment of the Silver Line Phase II Project for the MBTA incorporated ground freezing and underpinning during New Austrian Tunneling Method(NATM) tunneling through timber pile foundat

    Jan 1, 2005

  • SME
    Cresson Mine: Case History of a Rapidly Evolving Mining Project

    By Jeffrey A. Pontius

    The Cresson gold deposit is in the southcentral portion of the Cripple Creek mining district in central Colorado (Fig. 1). The deposit is hosted by a series of 32 Ma (Kelley, 1995) felsic to mafic, a

    Jan 1, 1996

  • SME
    The As-Built Geotechnical Report: Its Use For Design Of Support For Three Rock Stations Washington, D.C. Metro

    By Carl G. Bock

    INTRODUCTION The Washington Metropolitan Area Transit Authority (WMATA) has let a contract for the excavation of three rock stations, spaced about 3550' (1082m) apart, beneath Connecticut Aven

    Jan 1, 1976

  • SME
    Real Time Integration Of Mining And Metallurgical Information For Efficient Use Of Energy And Water - Preprint 09-133

    By O. A. Bascur

    The lack of integration of mining and metallurgical information with sufficient detail for analysis causes inefficient operation and hence sub-optimal energy and water use. It is difficult to analyze

    Jan 1, 2009