Evaluation of Emergent Electronic Detonators and Modern Non-Electric Shocktube Detonators AccuracyBy J Silva Castro, W C. Wedding, B T. Lusk, J Calnan, E G. Morris
The emergence of electronic detonators for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to timing. In many ways,
Jan 1, 2012
-
A full-field solution to predict vibrations in the presence of a free surfaceBy J. A. Sanchidrián, P. Segarra, S. Gómez
Blasting is a common activity in mining that can cause significant damage in the remaining rock mass. The most commonly used method for predicting vibrations is the Swedish or Holmberg-Persson approac
Jan 1, 2024
-
Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock MinesBy Reinhold Daykin, Piers Wendlandt, Nathan Rouse
Drilling and blasting are key components of every hard-rock (i.e., metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the ove
Feb 1, 2020
-
Electromagnetic Characterization of an Explosives Mixing Site at Blackie, AlbertaBy David G. Paton
"Electromagnetic surveys were conducted at the BXL Bulk Explosives Limited Mixing Plant andsurrounding area to characterize runoff from the site and possible impacts of salinity. The BXL Plant is loca
Jan 1, 1999
-
Blasting Improvements by Using Most Active Rock Variations on BlastBy Alain Blanchier, Anne Charline Sauvage
Rock mass variations have a huge influence on explosives efficiency and on blasting results. Numerous blasting improvements could be gained by taking into account rock mass and its variations. However
Jan 1, 2004
-
Journal: Blast Vibration and Seismograph Section / A History of the Development of Instruments for Measuring Vibrations of the Earth / Part 4By Robert Hopler
Although electrical instruments were being widely introduced into the study of seismic tremors, attempts to understand and quantify shocks from blasting continued to use rather primitive methods well
Jan 1, 2007
-
Kanalku Falls Blasting for Fish Habitat Improvement in AlaskaBy Catherine T. Aimone-Martin, Kristen Kolden
In August of 2013 the USDA Forest Service (USFS) blasted bedrock at the base of a waterfall in Kanalku Creek within the Kootznoowoo Wilderness Area on Admiralty Island in the Tongass National Forest l
Jan 1, 2015
-
Implementation of Track & Trace Solutions in Existing Production EnvironmentsBy Frank Hirthammer
The paper explains the procedure of implementing Track & Trace solutions for manufacturers of explosives based on customer experiences. By using concrete examples, the process from project start to im
Feb 1, 2020
-
Advanced Blasting Optimization for Enhanced Productivity: The X-2Mill SolutionBy Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Martínez, Juan Navarro
This study introduces the X-2Mill solution, a refined two-step methodology aimed at optimizing blast designs by aligning explosive energy with rock properties. The approach employs the X-4Traits Model
Jan 21, 2025
-
Advance Blasting using Drone Mapping and AI for Comprehensive Blast Performance AnalysisBy Dr. Anurag Agrawal, Fathur Rozaq, Nella Lubis, Relinda Sanistya, Herry Saputra, Rudolf Sitorus
In mining operations, basic drone applications such as pre- and post-blast photo comparisons, blast video recordings, and sample-based fragmentation analysis are often used to assess blast performance
Jan 21, 2025
-
Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel CavingBy Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro
This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit
Feb 1, 2020
-
Underground Longhole Blasting near Large-diameter Booster FansBy Norm Disley, Kingsley Hortin, Gertjan Bekkers
As part of the expansion of the Kidd Creek Mine to 2,682 meters (8800 feet) below surface, two largediameter 3000kW (4000HP) booster fans were installed at the 6000 level. Shortly after commissioning
Jan 1, 2008
-
Burden Profiling: Do You Measure What You Think You Do?By Greg Shapiro, Paul Dr. Worsey
Mining, quarry, and construction blasts are becoming more and more dependent on bench profiling. The use of accurate profiling gives the blaster better data for the most efficient blast results. So,
Jan 1, 2019
-
Shaking the Bugs at the Center for Disease Control [CDC]By Mick Fritz, Ryan Gilmore
The Center for Disease Control [CDC] is in the midst of a twenty year project, part of which includes demolishing existing buildings and erecting taller, more modern structures within the same foundat
Jan 1, 2008
-
Tunneling in Thinly Foliated Rockmass ConditionsBy H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
Feb 1, 2020
-
A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development ProjectsBy Robert Lee, Pertti Paavola
Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in
Jan 1, 2004
-
Understanding Spontaneous Detonation of Ammonium NitrateBy Alastair Torrance, Gary Cavanough
Approximately 1.5 million tonnes of ammonium nitrate are transported annually across Queensland, Australia—equivalent to nearly 100 truckloads per day. This is in the form of both AN prill and ammoniu
Jan 26, 2026
-
Potential Impact of Blast Layout, Sequence and Detonator Timings on Air Overpressure from BlastingBy Shazad Hosein, Bill Birch, Catherine Johnson, Toby White, Liam Bermingham
Air overpressure (AOP) from blasting can give rise to a significant number of blasting complaints from residents living adjacent to blasting operations from mines, quarries or civil engineering projec
Jan 1, 2018
-
Electronic Detonator Timing Approaches for Surface Quarries and Metals MinesBy Tristan Worsey, Nathan Rouse, Evan Thibaud
Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl
Jan 21, 2025
-
Blasting Access Holes in Thick Sea-Ice, Mcmurdo Sound, AntarcticaBy Martin Reed, John Wright
Blasters with the United States Antarctic Program (USAP) have developed techniques for opening access holes in floating sea-ice where the use of conventional drilling equipment is impractical. The bla
Jan 1, 2001