Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Run of Mine Fragmentation Optimization Utilizing Blasting

    By Tristan Worsey, John Rathbun, Andres Malone

    A run of mine, low grade gold heap leaching operation is currently looking to increase ounce recovery by decreasing run of mine fragmentation size. Current blasting practices have resulted in an avera

    Jan 1, 2015

  • ISEE
    Controlling Backbreak with Proper Borehole Timing

    By Calvin J. Konya

    Backbreak behind the last row of boreholes can be a significant problem for blasting operations. Backbreak will interfere with the proper drilling and execution of the subsequent shot and can produce

    Jan 1, 1987

  • ISEE
    The Hercudet System of Initiation

    By Robert B. Hopler

    Hercules Incorporated has designed, developed, and begun introducing a new non-electric delay blasting cap system which is radically different from anything presently available. This system, called He

    Jan 1, 1975

  • ISEE
    Using Artificial Intelligence and 3D Imaging to Provide Real-time Particle Size Analysis on Haul Trucks

    By Saeed Karimifard, Saman Nouranian, Shahram Tafazoli, Bahram Sameti, Frank Chu, Caitlin McKinnon, Tetiana Konstantynivska, Glen Turner

    We propose a particle size analysis solution for haul trucks that does not impact current operational workflows. Using artificial intelligence (AI) and 3D imaging technology, our solution reliably loc

    Feb 1, 2020

  • ISEE
    Bingham Canyon Mine-Blasting Through and Next to Active Underground

    By Robert Jacob Cefalo

    In 2019, the Bingham Canyon Mine, owned by Rio Tinto Kennecott Utah Copper Company, mined through the active underground that dewaters the pit. The active underground required the limitation of vibrat

    Feb 1, 2020

  • ISEE
    Drill and Blast Improvement Project Using Photogrammetry, GPS and Drill Navigation Systems

    By Tamara Wiseman, David Stewart

    "A Quarry located in Georgia is a green-field site established in 2011. The quarry lies in the eastern part of the Georgia Piedmont area. It is within a distinctive, northeast-trending belt of relativ

    Jan 1, 2017

  • ISEE
    Dynamic Mud Flow Effects on Emulsion Explosives in Indonesia

    By Garfiansyah Rayes

    In 2023, an Indonesian coal mine experienced significant contamination of an emulsion blend explosive by dynamic mud and water flow, triggered by flooding due to exceptionally high rainfall. This intr

    Jan 21, 2025

  • ISEE
    Optimization of Blast Fragmentation Curves and Determination of Rock-Blast Domains at Coimolache Mine, Based on Rock Factor Criterion and Kuz-Ram Model

    By Luis Huaroc, Augusto Sotomayor, Erick Rodriguez, Paulo Fernández, José Ricaldi, Luis Alejandro

    The application of the Kuz-Ram model for the prediction of fragmentation is used worldwide, in Coimolache Mine it was used to determine blast domains and optimize the process by obtaining drilling pat

    Feb 1, 2020

  • ISEE
    The Waiting Time Recovery Test

    By John T. Aler

    The U.S. Bureau of Mines has been studying the problem of why explosives detonate weakly or misfire during blasting in underground coal mines. Cross-borehole shock wave interaction has been identified

    Jan 1, 1991

  • ISEE
    Blasting: Strict Tort Liability or Negligence

    By Timothy Stark

    At present blasters are strictly liable under tort law for personal injury and property damage caused by ground vibrations and/or air overpressures. The application of strict tort liability to vibrati

    Jan 1, 2002

  • ISEE
    A Holistic Approach to the Drill and Blast Process

    By Tom BoBo, Seth Gering, Jeff Loeb

    Presenting a D&B feedback loop built on a well-designed blast, proven fragmentation analysis and blast monitoring solutions, underpinned by technology that not only increases profit from every blast,

    Feb 1, 2020

  • ISEE
    Airdek: an Update

    By Michael D. McGill, John L. Turner, Don Sieger, Doyle Newhouse

    Since its introduction by Atlas Powder Company in late 1986 as a means of highwall stabilization in surface coal mines (1), applications of the basic AirDek (2) blasting technique have multiplied rapi

    Jan 1, 1991

  • ISEE
    Journal: 100 Years / DRIVING HEADINGS IN ROCK TUNNELS Transactions of the American Institute of Mining Engineers New York 1910

    By W. L. Saunders

    RBH Note: In the early days of drill & blast tunneling the jobs utilized large crews of drillers and muckers. Advance per round was limited (typically around four feet) but two rounds per 8-hour shift

    Jan 1, 2011

  • ISEE
    Arlanda Link - A New Railway Beneath Arlanda Airport in Stockholm, Sweden, - A Technical Blasting Challenge

    By Donald Jonson

    The Arlanda Link project is for the time being the most interesting project in Sweden, concerning rock and blasting technology. The total amount of rock excavated beneath Arlanda airport comprises 800

    Jan 1, 1997

  • ISEE
    Summer Internship Project at an Underground Gold Mine

    By Tristan Worsey

    This work was performed during the summer of 2008 during the junior year of a BS in Mining Engineering. It was observed that the mine was having a problem with back break during the blasting of develo

    Jan 1, 2010

  • ISEE
    A New Integrated Workflow to Increase Drilling Accuracy using Post Process Kinematics(PPK) Drones and Smart Drills

    By Ravi Sahu, Kris Jeremiah

    This paper aims to study the benefits of using Post Processed Kinematics(PPK) surveying methodology combined with Drone photogrammetry to achieve highly precise positioning (X, Y, Z) of drill holes b

    Feb 1, 2020

  • ISEE
    Danger Tree Blasting In BC

    By Dave Weymer

    Falling timber in BC has always been a hazardous job. Huge, often rotting trees and steep, rugged terrain combine to create difficult and dangerous conditions. Death and injury rates are among the hig

    Jan 1, 2013

  • ISEE
    Physical Security On-Siite Magazines, Keys, Trucks & Periimeters

    By John Brulia

    "Definition of On-Site Security: All mandatory and non-mandatory, deterrent and loss control measures undertaken by an authorized explosives business tokeep its stocks of explosive materials and precu

    Jan 1, 2006

  • ISEE
    Underground Pillar Blasting with Bulk Emulsion explosives

    By H Russell

    An account of an experimental blast at the Sullivan Mine involving a small pillar drilled with 4 1/2" diameter up-holes, and loaded with emulsion explosives from a truck-mounted tank/pump unit.

    Jan 1, 1984

  • ISEE
    Electronic Initiation System in Fosterville Gold Mine Development

    By C. Zuniga, S. Combrinck, C. Peters

    Agnico Eagle Gold have partnered with Enaex Australia at their Fosterville gold mine to leverage a combination of drill and blast technologies to optimise underground development mining. The mine is t

    Feb 6, 2023