Response of Pile and Pile Groups against Excavation Induced Ground MovementBy K Ilamparuthi, R. K. Madhumathi
"This paper presents the results of 1g model tests conducted on model piles both single and two pile groups embedded in sand by physically inducing lateral soil movement. From the test results it was
Jan 1, 2015
-
Northeast Boundary Tunnel – Mount Olivet Road Drop ShaftBy Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022
-
Experimental Studies on Behaviour of Single Pile under Combined Uplift and Lateral Loads (5ae0a39a-734f-4c2b-bd6b-06fe19e6d6ea)By K. Madhusudan Reddy
"Pile response under combined uplift and lateral load is very important and it is imperative to evaluate the effect of combined loading and only few studies were reported on pile behavior under combin
Jan 1, 2017
-
Behavior Of Pile Groups Arrangement Adjacent To A Sand Slope Under Lateral LoadBy Mohamed A. Sakr
An experimental study on the behavior of pile group's arrangement under lateral load was carried out in the level ground and at crest of sand slope 3H: 2V. Tests were conducted on single pile and
Jan 1, 2010
-
PMF Remediation of Oxford DamBy Scott Dodds
"The Oxford Hydroelectric Station was a unique project that incorporated a variety of dam strengthening methods to stabilize the facility in order to meet the standards required by Federal Energy Regu
Jan 1, 2005
-
On Driven Piles In The Arabian Gulf: Imperfections, Potential Challenges, And Lessons LearnedBy Waddah Akili
The demand on pile installation in the offshore of the Arabian Gulf has, over the last two decades, experienced unprecedented boom, triggered by the construction of platforms, to help facilitate the p
-
Drawdown of Ground Water Control System in Deep Excavation Surrounded by Cutoff Walls: Numerical InvestigationBy Dalia. R. Mohamed, Hisham H. Hafez, Marawan M. Shahien
"Construction activities in major projects that involve deep excavations necessitate the use of vertical walls surrounding the construction site to play an important role as earth retention system. Th
Jan 1, 2016
-
Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity ProfilingBy Garland Likins, Gray Mullins, George Piscsalko
"Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or
Jan 1, 2016
-
Innovative Crosshole Sonic Logging Testing Drilled ShaftsBy Joshua C. Adams, Les Chernauskas, Edward L. Hajduk
"Drilled shafts are increasingly being used to support bridge and building foundations. Because these foundations usually carry very high design loads and often serve as non-redundant, single load car
Jan 1, 2009
-
Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test ResultsBy John C. Niedzielski
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)
-
Design And Performance Evaluation Of A Grouting Program In Weak Rock MassesBy George Moses K, Mahendran K
Grouting is performed in rock masses in order to increase its strength properties and also to reduce the seepage. In the design of underground structures such as tunnels or caverns located in weak roc
Nov 1, 2022
-
Ideas To Improve Driven Pile Foundation Design And Installation ProceduresBy Armin W. Stuedlein, Steven R. Saye
The differences between calculated axial pile capacity and the capacity realized during and following installation has long presented a significant concern for foundation engineers and contractors. Su
-
Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring SystemBy Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim
"In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality
Jan 1, 2005
-
Session 31 "Grout Mixtures and Materials 2"By Lois G. Schwarz
I did not make studies about this parameter but I can say that some researchers recommend using low C3A cements to repair masonry mortar in order to reduce a possible combination with sulphate that ca
Feb 10, 2003
-
Load Tests on Drilled Shafts at Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft
Jan 1, 2016
-
Recent Advantages of CDM-LODIC Method (Low Displacement and Control Method)By Yuji Yamashita, Kazuyoshi Kamimura, Tsuyoshi Takahashi, Naoya Matayoshi
"The CDM-LODIC method (cement deep mixing - low displacement and control) method enables ground displacement to be reduced by removing an amount of soil equivalent to that of injected cement slurry an
Jan 1, 2015
-
Determining Length Of Pile Foundation By Analyzing Response To Lateral Hammer ImpactBy Vivek Samu, Murthy Guddati
A new method called Effective Dispersion Analysis of Reflections (EDAR) was recently developed to effectively analyze the dispersive waves generated from lateral impact to piles. This paper presents t
-
Overview of Construction and Design of Auger Cast-in-Place and Drilled Displacement PilesBy Monica Prezzi
"Auger cast-in-place (ACIP} piles and drilled displacement piles are being increasingly used as foundation elements for structures, particularly in projects requiring accelerated construction or invol
Jan 1, 2005
-
Full-Scale O-Cell Load Test for a Rotator Drilled Rock Socket at the Main Span of the New Benicia-Martinez BridgeBy Ronnie X. Gu, Xing Zheng, Gem-Yeu Ma
Due to implementation of the rotator construction method from which a smooth shaft was anticipated, a full-scale pile load test (Osterberg Method) was performed at Pier 14 Pile 9 of the main span of t
Jan 1, 2005
-
Lateral Capacity of Drilled Shafts Considering Push-Pull ResistanceBy Ke Yang
"Drilled shafts are typically used to support structures subjected to large moments at the shaft head. The large moment can produce push and pull forces on the two sides of a drilled shaft. Consequent
Jan 1, 2005