The Waterloo Barrier - A Sealable Joint Steel Sheet Piling For Groundwater Control And Remediation - Presented At The Deep Foundations Institute Annual Meeting & Conference Toronto, Ontario, October 15-17, 1997 - SummaryBy Murray Gamble
A new type of groundwater cutoff wall has been developed at the University of Waterloo. The Waterloo Barrier? is a steel sheet piling system that incorporates a sealable cavity at each interlocking jo
Jan 1, 1997
-
Application Of High-Strength Concrete To Drilled Shafts - 1. SummaryBy A. E. Fiorato
A test program was conducted to evaluate use of high-strength concrete in drilled shafts (caissons). The objective of the program was to determine if internal temperatures developed during cement hydr
Jan 1, 1991
-
Prediction of Axial Geotechnical Resistance of Base Grouted Drilled ShaftsBy Emad Farouz, Ehab S. Shatnawi
"The increasing demand for small deformations and high-capacity drilled shafts without enlarging drilledshaft diameters has motivated the development and increasing use of a base grouting (BG) techniq
Jan 1, 2016
-
Design, Construction, And Testing Of A Precast UHPC PileBy Thomas L. Vande Voort
The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in br
Jan 1, 2008
-
CFA Secant Piling In CaliforniaBy Philip Derbyshire, Dale J. Scheffler
"Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form
Jan 1, 2005
-
Use Of Anchors In Floors Of Large Drydocks And Wagon Tipper Sheds ? SynopsisBy W. H. Liu
The stability of floors of large drydocks and wagon tipper sheds at coal terminals is an important matter but quite difficult to solve. Anchors can be used to join floors to foundations thus ensuring
Jan 1, 2010
-
Analysis Of Driving Stress Measured In The RC Long PileBy Yu Zhenquan
At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa
Jan 1, 1991
-
Laterally Loaded Caissons for Ontario College of Art & DesignBy William F. Starke
"The Ontario College of Art & Design (OCAD) located in Toronto, Ontario, found itself in dire need of space due to increased enrollment, leading them to embark on a major expansion and redevelopment o
Jan 1, 2004
-
Behavior Of Large Bored Piles With Grouted EndBy Zhang Yaonian
This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati
Jan 1, 2004
-
Innovative Use of an Active Soil Nail Wall in Lieu of Pit Underpinning for a Historic BuildingBy Tai Luu, Maxim C. Schisler, Yaser Taheri
The Stevens Gateway Project is an expansion of the Stevens Institute campus overlooking the Hudson River in Hoboken, NJ. The plans call for 90,000 ft2 (8360 m2) of new classroom, research, and student
Jan 1, 2019
-
Residual Load Development Case Study In Driven Cast-In-Situ PilesBy Packer M. L
Residual load development in driven precast piles has been widely researched in recent decades, however, cast-in-situ piles are often falsely assumed to be unaffected by this mechanism. In contrast to
May 1, 2022
-
Drilled Shaft Design For Noise Wall Barriers Along I-20 In Columbia, SCBy Anil Bhandari
Using subsurface data collected at each drilled shaft location is an ideal approach for conducting drilled shaft design. However, conducting subsurface tests at each drilled shaft location and subseq
Jan 1, 2011
-
Specialty Geo-Engineering in a Caisson TownBy William H. Walton, Joel Dellaria, Jeffrey R. Hill
The City of Chicago has a world-renowned skyline and is known for its provocative architecture. The subsurface conditions in the city have allowed for construction of these significant structures. The
Jan 1, 2019
-
Jet Grouting For Deep Excavation Support For Re-Entrant CornersBy Chu E. Ho
This paper reviews the design of jet grouting at re-entrant corners of excavations where the diaphragm wall and secant pile wall installation were interrupted by existing utilities in the streel sidew
May 1, 2022
-
Life Extension of 132 kV Lattice Tower FoundationsBy Allan Herse
"The years following World War II were nation building years in Australia. Soldiers returned from the European and Asian theatres of war sparking a major infrastructure construction boom. Dams and hig
Jan 1, 2017
-
ISM MICROPILE WORLD CUP 2017 WINNER - Life Extension of 132 kV Lattice Tower FoundationsBy Allan Herse
"The years following World War II were nation building years in Australia. Soldiers returned from the European and Asian theatres of war sparking a major infrastructure construction boom. Dams and hig
Jan 1, 2017
-
Determination of Coefficient of Modulus of Sub-Grade Reaction for Free Head Short PileBy Sumit Kumar Biswas, Moyukh De, Sibapriya Mukherjee
"The piles often are also subjected to lateral (horizontal) forces and moments. In fact, there are some structures where the primary function of piles is to transfer lateral loads to the ground. Prope
Jan 1, 2015
-
Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle EastBy Brian Metcalfe, Kord Wissmann, Gianni Martinez
The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large
May 1, 2022
-
Analytically Modelling Dst Arrival Time Databases With High Order Polynomials For Optimal High Resolution ImagingBy Gerald Verbeek, Erick Baziw
Downhole Seismic Testing (DST) is an extensively utilized geotechnical tool for site characterization. DST provides low strain (<10-5) in-situ interval shear and compression wave velocity estimates. T
Oct 1, 2022
-
Drilled Shaft Design Optimization by Means of Static Load TestingBy Riad Diab
In 2018 the Caisse de Dépôt et Placement du Québec (CDPQ) awarded a $6.3 billion (U.S. dollars) design-build contract to the Joint Venture (JV) team NouvLR for the design and construction of one of th
May 1, 2022