Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Treatment of Soft Clays by Combined Encased Stone Columns and Vacuum ConsolidationBy Ganesh Kumar S.
"Soil reinforcement using stone columns is one of the well-developed ground improvement techniques for soft clay deposits. The load carrying capacity can be further improved by encasing it with geosyn
Jan 1, 2017
-
The Application Of Interlocked Steel Pipe Pile And Steel Sheet Pile For An Industrial Port ? SynopsisBy M. Tominaga
An industrial port complex was constructed on the west coast of Leyte Island The work was started in December 1981 and completed in May 1984. This port complex includes a 665 m long wharf and can acco
Jan 1, 2010
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field WorkBy Darrell L. Beddard
Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai
Jan 1, 1996
-
Dynamic Analysis Of Follower Driven Piles For The Venice Flood Gate ProjectBy Frank Rausche
Without doubt, driven piles are the most economical deep foundation element for a nearshore environment, providing for high bearing capacities and stiffness, quick installation times, assured quality
Jan 1, 2006
-
Centrifuge Modeling of Temperature Effects on the Pullout Capacity of Energy Piles in ClayBy John S. McCartney, Ismaail Ghaaowd
This study presents the results from centrifuge modeling experiments performed to understand the effects of temperature changes on the pullout capacity of scale-model energy piles embedded in normally
Jan 1, 2018
-
Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :By Virendra Singh
The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic
Jan 1, 1996
-
Evaluation Of The Originally Published, Meyerhof Empirical Correlations Of Shaft Friction And End Bearing Capacity For Driven Piles Using Dynamic Test DataBy Karl A. Higgins
In 1976, Prof. G. G. Meyerhof published a famous article in the Journal of Geotechnical Engineering titled ?Bearing Capacity and Settlement of Pile Foundations?. This article presents the authors opi
Jan 1, 2011
-
Helical Pile Foundation Anchors As A Practical AlternativeBy Dilip Khatri
Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ
Jan 1, 2003
-
Route 49 (Penns Neck Bridge) Over Salem RiverBy James E. Maccariella
Replacement of an existing movable bridge with a new low level fixed bridge would not accommodate potential future navigation traffic. In order to replace the existing bridge in a cost effective m
Jan 1, 2005
-
High Risk Control For Piling And Deep Foundations - A Systematic ApproachBy Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
Vibration-Free Driven Tubular-PilesBy S. Doombos
To convert the railway-bridge across the Oude Maas between Dordrecht and Zwijndrecht into a vertical lifting bridge, a drastic adaptation of the existing piers is necessary. Extra piles have to be pla
Jan 1, 1989
-
Soil Nail Stabilisation For A 14.5m Deep Excavation At Uncontrolled Fill GroundBy Shaw-Shong Liew
This paper presents the processes of investigation, analysis, design, construction and monitoring of soil nail stabilisation work to facilitate a 14.5 m deep excavation at an uncontrolled fill ground.
Jan 1, 2006
-
Reanalysis Of Piles Under Static And Dynamic Lateral LoadsThe process of pile driving disturbs the soil around the pile. The nature and magnitude of disturbance depends upon 1) the pile size, and 2) the nature of soil. Therefore, the prediction of a single p
Jan 1, 1989
-
Ethical and Risk Aspects of Deep Foundation SubcontractsBy Alexander Filotti, Richard Kalson
"In the last decade, the construction industry has witnessed significant changes in the project delivery systems and contractual relationships between the general contractors (GC) and Deep Foundation
Jan 1, 2016
-
A Case Study of Wet Soil Mixing for Bearing Capacity Improvement in TurkeyBy Arash Maghsoudloo, Asli Can
"Abstract This paper presents a ground improvement implementation case under a raft foundation of a local hospital. The selected ground improvement method is Wet Soil Mixing (WSM) technique. Soil mixi
Jan 1, 2014
-
Automated Instrumentation For ACIP And Drilled Displacement Piles - 1. IntroductionBy John Lemke
Current practice for monitoring static pile load tests commonly consists of measuring load and displacement at the top of a pile. This is typically accomplished by monitoring dial gauge movements, lin
Jan 1, 2002
-
Recent Advances In Quiet & Vibration-Less Steel Pile Installation & ExtractionBy Ray. K. Filip
The concept of installing a steel sheet pile retaining wall into the ground by "pressing" has resulted in the development of various equipment solutions over the last thirty years e.g. Taylor Woodrow
Jan 1, 2006
-
Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in ChicagoBy Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin
This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca
Jan 1, 2018
-
Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load TestsBy Fawad S. Niazi
Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf
Jan 1, 2011
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft ConstructionBy C. Vipulanandan
It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas