    Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based Inclinometers

    By Peter Chou

    A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st

    Jan 1, 2009

  • DFI
    Design Of The Marine Foundation For The Skyway Project Of The San Francisco Oakland Bay Bridge

    By Gerry Houlahan

    The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde

    Jan 1, 2005

  • DFI
    Soil Improvement Using Soil Mixing – An Alternative Way for the Indian Market

    By Franz-Werner Gerressen

    "The use of soil improvement to utilize areas, which are not suitable for foundation purpose, has a long tradition. Due to the increasing demand of foundation works in areas of unsuitable soils, the i

    Jan 1, 2017

  • DFI
    Experiences From The Italian High Speed Rail Network AV Construction

    By Vincent Jue

    In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.

    Jan 1, 2010

  • DFI
    Micropile And Soil Nail Load Transfer Rates In The Puget Sound Region Of Washington State

    By Carole L. B. Mitchell

    The increased use of micropiles and soil nailing presents a growing database of verification and sacrificial load test data. In Washington State, the use of micropiles is becoming common, and soil na

    Jan 1, 2006

  • DFI
    Theoretical And Experimental Investigation On Underwater Ground Anchors

    By Leonello Sciacca

    Deepening of harbours has become a priority, necessary to the ongoing operation of the wharves in the face of deeper draft merchant vessels and cruise ships. It is now standard practice in many areas

    Jan 1, 2011

  • DFI
    Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil Conditions

    By Seffen Leppla, Rolf Katzenbach, Matthias Seip

    "Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig

    Jan 1, 2014

  • DFI
    Diaphragm Walls, Recent Developments to Improve Reliability

    By A. Frits van Tol, Rodriaan Spruit, Jan H. van Dalen

    "Abstract In recent years, there have been major problems with deep excavations in urban areas supported by diaphragm walls. In some cases, like the fatal Nicoll Highway collapse in Singapore the qual

    Jan 1, 2014

  • DFI
    Recent Developments In Secant Bored Pile Wall Construction

    By D. E. Sherwood

    Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in

    Jan 1, 1989

  • DFI
    Installation Parameters, Pile Performance and Importance of Testing

    By Maurice Bottiau

    "Abstract When addressing the performance of deep foundations, many parameters play a role, from adequate soil investigation to performance monitoring and testing. The correct understanding of pile co

    Jan 1, 2014

  • DFI
    Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone Ground

    By Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu

    During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston

    Jan 1, 2018

  • DFI
    Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON Project

    By Elizabeth M. Smith

    The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss

    Jan 1, 2009

  • DFI
    Determination of Initial Stiffness of Drilled Shafts for the Analysis of Settlements under Service Loads

    By Carlos A. Prato, Federico Pinto

    "ABSTRACTThe design of drilled shafts often incorporates large factors of safety, for which settlements under service loads are highly influenced by the initial elastic stiffness. In the case of group

    Jan 1, 2014

  • DFI
    An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction

    By F. Pagliacci

    Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste

    Jan 1, 2000

  • DFI
    Effective Dewatering Is More Than A Pump In The Hole - A Presentation At The Deep Foundations Institute Annual Meeting St. Louis, Missouri, November 1980

    By William J. Rothschild

    Ground water at construction sites can be controlled by properly placed wellpoint dewatering systems. Care must be taken in planning cofferdams to have adequate space for and access to pumps, headers

    Jan 1, 1984

  • DFI
    Bearing Capacity Of Piles Determined By Field Tests ? Synopsis

    By D. M. Milovic

    On the basis of relatively large number of field load tests of piles, the determination of the ultimate bearing capacity have been studied. Using the load settlement curves and the results of the cone

    Jan 1, 2010

  • DFI
    What Has Been Learned About Drilled Shafts From The Osterberg Load Test - Summary

    By Jorj O. Osterberg

    The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc

    Jan 1, 1999

  • DFI
    Use of CSM to Support a Heritage Building

    By Chris G. Leach

    "Abstract A seven storey Northbridge area of Perth, Western Australia presented residential apartment complex located in the an opportunity for a novel application of Cutter Soil Mix technology (CSM).

    Jan 1, 2014

  • DFI
    A New Method Of Analysis Of Pile Displacement In Soil With Respect To Time

    By M. England

    A method for the analysis and prediction of single pile displacement behaviour is described. It is the displacement in time, under constant load, based on the use of hyperbolic functions to characteri

    Jan 1, 1993

  • DFI
    Three Case Histories Comparing Impact And Vibratory Driven Pile Resistances In Marl

    By Gregory J. Canivan

    Three test pile programs were conducted in Charleston, South Carolina to evaluate differences in bearing resistance due to installation methods. The tested piles were installed with impact hammers and

    Jan 1, 2002