Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big TwistBy James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003
-
Creative Shoring Solutions For A Tight Urban SiteBy David G. Winter
The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s
Jan 1, 2009
-
Soil Plug in Open Ended Pipe Piles Embedded in SandBy Mohammed Y. Fattah, Wissam H. S. Al-Sudani
"During installation of pile, a soil column is formed inside the pile. For small depths, the height of the soil column typically equals to the penetration depth (full coring state). As the penetration
Jan 1, 2014
-
Vibratory Driver/Extractors Do More Than Drive Sheet Piles - SummaryBy John L. White
Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to
Jan 1, 1997
-
Temporary Secant Wall For A Subway Rehabilitation Project In An Urban EnvironmentBy Vincent Tirolo
Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre
Jan 1, 2003
-
Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation RemediationBy Michael Arnold, Bob Faulhaber, Joe Nichols
"Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam
Jan 1, 2017
-
Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - IntroductionBy Michael W. Neill, O&apos
The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec
Jan 1, 1989
-
Construction And Design Of Drilled Shafts In Hard Pinnacle LimestonesBy Dan A. Brown
The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos
Jan 1, 1991
-
Update Of Aashto Standard Specifications For Highway Bridges: Division II--Construction - Preliminary Draft Final Report Vol. II - Specifications And Commentary - Driven Foundation Piles - 4.1 DescriptionThis work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles
Jan 1, 1989
-
Rigid Inclusions For Soil Improvement In A 76 Building ComplexBy Walter I. Paniagua
A housing complex of 76 buildings is being constructed in the city of Morelia, in western central Mexico; the buildings are 5 levels high, with a shallow concrete slab foundation. Soil conditions incl
Jan 1, 2008
-
Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, PennsylvaniaBy Brian H. Greene
The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo
Jan 1, 2006
-
Performance of Footings in Rock Based on ServiceabilityBy C. M. Haberfield
"1 INTRODUCTION Around the world, there is a demand for larger structures, tall buildings and large bridges. While good footing design is important for all structures, it is even more important in the
Jan 1, 1900
-
Dynamic Pile Testing In Soils Exhibiting Set-Up - IntroductionBy Juan M. Antorena
A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio
Jan 1, 1995
-
Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case HistoryBy Christopher J. Pacitto
This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe
Jan 1, 2002
-
Increase In Shear Modulus By Soil Mix And Jet Grout MethodsBy Paul J. Axtell
The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc
Jan 1, 2008
-
Diaphragm Wall Construction In Hong KongBy Arturo Ressi di Cervia
The utilization of diaphragm wall construction in Hong Kong began in 1974 with the construction of the New World Center, the first diaphragm wall job built in the British Colony. That landmark job
Jan 1, 1993
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999
-
Evaluation Of Achievable Column Diameter In Jet GroutingBy Chu E. Ho
Key variables that govern the jet cutting process are examined based on fundamental theories of jet hydrodynamics and soil mechanics. Under normal conditions of jet grouting operations, lift speed and
Jan 1, 2006
-
Foundations For The M25 Motorway Near To Heathrow AirportBy John F. Spence
Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne
Jan 1, 2007