Experiences and New Developments in Offshore Foundation (610f0063-3ba0-451b-bb8c-dc3962343edb)By Leonhard Weixler, Jean Wehbe, Gordian Ulrich, Franz-Werner Gerressen
"As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced
Jan 1, 2017
-
Cutoff Wall Selection for Levee ImprovementBy Louay Owaidat
The United States Army Corps of Engineers (USACE) Sacramento District awarded a $64 million construction contract in February 2020 to the Maloney Odin Joint Venture for 3 mi (4.8 km) of levee improvem
Oct 1, 2022
-
Case History: Innovative Load Test Program Optimizes Pile Capacity In Challenging Ground ConditionsBy Emad Farouz
This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Plan
-
Liner Piles Used As Support To Kentledge For Initial Compression Load TestBy Venugopal B, M Kumaran, Thomas John, Vetriselvan A
The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t
Nov 1, 2022
-
Session 29 "Grouting for Tunnels 1"By Lynn Crayne
We used Glyoxal as the hardener, at a final concentration of 10% by volume and therefore 20% by volume in the A-Component. They worked pretty well what we did was we shaved the joints on each of the
Feb 10, 2003
-
Foundation Construction Challenges At 100 11th Avenue In Manhattan - Secant Pile WallBy Andrew Cushing
This paper presents the design and construction of the foundation for a major high-rise real estate development on the west side of Manhattan. Arup was retained by Underpinning and Foundation Skanska
Jan 1, 2008
-
Partnering for Cutoff Wall Project SuccessBy Osvaldo Valdez, Matteo Bertoni, Aem Ragy
The East St. Louis Deep Cutoff Wall project is located in the area of East St. Louis, Illinois, across the Mississippi River from the city of St. Louis, Missouri, along the left descending bank of the
Sep 1, 2023
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement ProjectBy Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang
During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati
Jan 1, 2019
-
Deep Soil Mixing Trials at Porto Alegre Airport, BrazilBy A. Ortigão, M. Felix, E. Falk, T. Koehler
"Ground improvement techniques such as vibro-replacement or deep soil mixing are fairly young products in the Brazilian geotechnical market. Soft soils in this country are deep, very soft, have low se
Jan 1, 2015
-
3D FEM Modelling of a Ground Improvement SolutionBy Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim
A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo
Sep 8, 2021
-
Trouble In Paradise: Micropiles As A Solution To Challenging Geotech And Steep, Rugged Terrain On The Island Of OahuBy Steve Davidow, Scott Tunison
As the demand for electric power grows and generation facilities are constructed in more remote areas, the industry faces an increasing number of foundation construction challenges. The importance of
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley MineBy Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
Electronic Instrumentation in Support of Installation of Special Foundation Projects as Part of the Digital Future - Ensuring Safe Production and Improving Quality ControlBy Franz-Werner Gerressen
New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical su
Jan 1, 2019
-
State of the Art Ground Improvement Technique for a Residential Complex: Case StudyBy Madan Kumar Annam, Hari Krishna Y, I. V. Anirudhan
"For completion of projects in time with positive results, improvements of productivity and effective project management procedures have become extremely important. This paper discusses a milestone pr
Jan 1, 2015
-
Proposed Micropile Section for the 2006 IBCBy Lawrence F. Johnsen, Marc J. Gallagher
"Micropiles are small diameter, bored, grouted-in-place piles incorporating steel casing and/or reinforcements. The omission of micropiles from most United States building codes has resulted in the ap
Jan 1, 2005
-
Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground MetroBy Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
Replacing Top Layer Of Soft Clay With Compacted Engineering Fill To Improve The Lateral Capacity Of PilesBy Venugopal Bonani, Kumaran M., Thomas John
Liquid storage tanks are usually located in nearshore or coastal regions with soil profiles containing thick layers of compressible soils. These storage tanks are usually of large diameter up to 90m a
Sep 1, 2022
-
Session 20 "Grouting for Water Retaining Embankments"By Timothy Flaherty
We observed the boiling in the water very close to the water adjacent to where we were drilling. That only happened at the very beginning before it was switched to water flushing. Yes, it was performe
Feb 10, 2003