Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Metallurgical mapping of the San Nicolas deposit

    By A. H. Winckers

    "The San Nicolás deposit is a complex fine grained polymetallic volcanogenic massive sulphide deposit located in central Mexico.Metallurgical testwork was carried out in 1999 and 2000 to develop a flo

    Jan 1, 2002

  • CIM
    Canadian Clean Power Coalition: Clean Coal Power Plant Technology

    By Paul R. Clark

    Outline ? Coal As An Energy Resource ? Canadian Clean Power Coalition ? Phase I of the CCPC Project ? CO2 capture options ? Gasification ? CO2 use ? Results ? Phase II Plans ? Next Steps Tra

    May 1, 2004

  • CIM
    Assessment of Material Diggability for Shovel Excavation in Oil Sands

    By Sibabrata Patnayak

    A major problem during shovel excavation in oil sand mining is the variability of material diggability resulting in varying mechanical energy input, cycle time, energy consumption, wear, and stress lo

    Apr 1, 2005

  • CIM
    Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)

    By S. Rivard

    "This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades

    Jan 1, 2017

  • CIM
    Ground Support Audit at Brunswick Mine ? Data Collection and Results Management

    Ground support audits are sometimes necessary in ageing underground mines. Usually, the purpose of such audits is to assess the state of the ground support in various parts of the mine, identify areas

    May 1, 2009

  • CIM
    Lithogeochemistry as a guide to identifying favourable areas for tile discovery of volcanogenic massive sulphide deposits

    By V. J. Sopuck, O. P. Lavin, Ian Nichol

    "A major challenge of contemporary exploration geochemistry is the development of procedures that can locate blind mineralization or mineralization that sub-crops below a cover of transported overburd

    Jan 1, 1980

  • CIM
    Environmental Law and Regulation Challenges for the Mining Industry

    By R. Cotton

    "1. INTRODUCTIONTo say that the environment will be a dominant issue in the 1990' s is an understatement. A world-wide ""green revolution"" is taking place not only with the general public and politic

    Jan 1, 1991

  • CIM
    The Pronto Mine

    By James A. Robertson

    "The Pronto Mine located at the east end of Lake Lauzon, Long Township, some 12 miles east of Blind River is of historic note being the discovery locality and the first producing mine of the Elliot La

    Jan 1, 1986

  • CIM
    Pilot Plant Development Studies on Mount Laurier, Canada, Graphite Deposit

    By V. Lakshmanan, Dan Mackie, J. Melnbardis

    "Crystalline Flake Graphite is a strategic mineral. Since 1954 nearly all North American consumption has been imported from offshore. The Bouthillier Project in Quebec, Canada, is Orrwell Energy's bid

    Jan 1, 1984

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    Mining for Space Why now?

    By Michel Doyon

    Canadian Context: Exploration ??Space Exploration is within the unique mandate of the Canadian Space Agency ??Global partnerships ??Maintain close relationship with our partners ??New knowledge

    May 1, 2009

  • CIM
    Low PH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit (db4a4353-e70f-4fb2-9b3d-7daf6f017863)

    "The Ernest Henry Mining (EHM) ore body is an iron oxide copper gold deposit with an average grade of 1.1 percent copper, 0.5 g/tonne gold and 22 percent magnetite. At the end of 2009, EHM converted t

    Jan 1, 2014

  • CIM
    Energy Efficient Grinding of Ores and Minerals with High Pressure Grinding Rolls

    "Polycom, a new approach to ore processing based on pressure comminution, is obviously a very attractive alternative to conventional processing methods.Since a full-scale pilot plant was commissioned

    Jan 1, 1991

  • CIM
    Corrosion Behaviour of Swellex Bolts in Underground Mining Environments

    By F. Charette

    The paper reviews recent investigations of the impact of corrosion on the performance of both plain and coated Swellex rock bolts. It addresses the problems associated with estimating and predicting c

    May 1, 2004

  • CIM
    Evaluation of New Mining Ventures: Average Cost versus Net Present Value

    By Bernhard Schwab

    A popular rule in the mining industry is that a property should only be developed if average unit production cost is less than a given proportion of the estimated long-run price of the mineral. This p

    Jan 1, 1978

  • CIM
    Mine Taxation in Canada (47079a16-4741-4ecf-9d44-1e511ce0304a)

    By C. G. Williams

    IN preparing this paper on Canadian mine taxation, there has been no attempt to detail the requirements of the various taxing bodies; but rather to consider the matter from the standpoint of its under

    Jan 1, 1935

  • CIM
    Les Mines INMET Division Troilus - Objet: Extension de la vie des godets des excavatrices DEMAG.

    Les Mines Inmet ? La Division Troilus exploite une mine d?or à ciel ouvert depuis 1996 et produit un concentré de cuivre. La Division Troilus est localisée à 175 KM au nord de la ville de Chibougama

    Feb 1, 2008

  • CIM
    Newcrest’s Industry First Application of Eriez Hydrofloattm Technology for Copper Recovery from Tailings at Cadia Valley Operations

    By L. Vollert

    In August 2018, the first full-scale HydroFloatTM cells for the recovery of coarse composited copper and gold were commissioned at Newcrest’s Cadia Valley operation in New South Wales, Australia. The

    Jan 1, 2019

  • CIM
    Selecting the Number of Increments for Daily Metallurgical Samples: Application to Goldcorp Eleonore Gold Ore Concentrator, Quebec, Canada

    By Claude Bazin, Jalna Lamontagne

    "The operators of mineral processing plants collect daily samples from strategic process streams with a view to prepare production balances to assess plant performances. The rules to minimize the risk

    Jan 1, 2017

  • CIM
    Non-isothermal reduction kinetics of EAF dust-based pellets

    By J. Lobel, M. Bourassa, J. A. Kozinski, B. Peng

    Non-isothermal kinetics studies of the reduction phenomenon of electric arc furnace (EAF) dust generated in stainless steelmaking have been carried out. The dust was mixed with carbon as a reducing ag

    Jan 1, 2001