Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The geology and economic potential of the Athabasca Basin in Alberta

    By John Wilson

    "The unconformity beneath 75 per cent or over 6000 km2 of the Athabasca Basin in Alberta lies within economically exploitable depths. The basement beneath this unconformity consists of an extension of

    Jan 1, 1987

  • CIM
    Geometallurgical Modeling of the Dumont Deposit

    "The Dumont deposit is a large (1066 Mt probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporation acquired t

    Jan 1, 2013

  • CIM
    Improvement of Valuable Mineral Transport and Gangue Drainage in Froth Flotation

    By G. Bartolacci, G. Couture, Levasseur. B., A. Lockhart, D. Nathan

    "Pulp and froth zone characterization in a flotation circuit to improve transport of valuable minerals remains a challenge. Even though some significant breakthroughs have been made in the development

    Jan 1, 2017

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • CIM
    Information Strategy Planning on Nuclear Power Plant Project Management System

    By Son Hye Jin

    Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the

    Aug 1, 2013

  • CIM
    Pressure Acid Leaching of Non-Ferrous Smelter Slags for the Recovery of Their Base Metal Values

    By W. Curlook, V. G. Papangelakis, M. Baghalha

    A pressure acid leaching process has been developed for the extraction of metal values, nickel, copper, cobalt and zinc, from base metal smelter slags. The basic concept contemplates cooling the smelt

    Jan 1, 2004

  • CIM
    Application of a kinematically admissible velocity field to the analysis of the arching phenomena in backfills

    By F. P. Hassani, H. B. Poorooshasb

    "A kinematically admissible velocity field is applied to study the arching phenomenon in a cohesionless granular backfill placed between two rough vertical inflexible walls. The study is different fro

    Jan 1, 1989

  • CIM
    The Tectonic, Magmatic and Mineralization History of the Sudbury Structure

    By Harold L. Gibson, Don H. Rousell, Ian R. Jonasson

    "Abstract - The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of sh

    Jan 1, 1997

  • CIM
    The Tectonic, Magmatic and Mineralization History of the Sudbury Structure (4c0ad050-3f5c-4d02-9b1c-381b1fa8e9bb)

    By Harold L. Gibson, Don H. Rousell, Ian R. Jonasson

    "The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of shatter-coned

    Jan 1, 1997

  • CIM
    Flotation as Part of Grinding Classification Circuits

    By M. Tarvainen, J. Kallioinen

    "Depressed metal prices coupled with increasing production costs have presented a great challenge for operators to control and reduce the costs of production to maintain profitability. Depleting ore r

    Jan 1, 1984

  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part I Surface and Plant Operations

    By Euler De Souza

    The authors conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview potential hazards associated with backfill practice

    May 1, 2009

  • CIM
    Asarco LLC Hayden Converter Retrofit Project – An Update

    By K. Parameswaran, A. Veek, A. Fernandez, P. Safe

    ASARCO LLC (Asarco) Hayden Copper smelter, in Hayden, Arizona, has operated continuously (except for minor labor and economic curtailments) since 1912. The current plant configuration comprises INCO f

    Jan 1, 2019

  • CIM
    Rock Strength Characterization for Excavations in Brittle Failing Rock

    By B. H. Kim

    It is hypothesized that the standard approach adopted to characterize the ground and to determine the rock strength properties at depth are flawed and generally tend to underestimate the rock strength

    May 1, 2009

  • CIM
    How the Mining Industry is Responding to Pressures for Change in the Management of Mine Waste

    By Don Welch

    Pressures for change ?Land use constraints ?Project financing ?Local communities ?Environmental issues ?Sustainability requirements ?Stricter regulatory procedures ?Technical excellence ?Reduc

    May 1, 2010

  • CIM
    Water Power in British Columbia

    By Ernest Davis

    WATER power, until developed, produces nothing, but when harnessed it continues to produce, it might be said, indefinitely. Hence the importance of developing all feasible water powers. British Colu

    Jan 1, 1942

  • CIM
    Finite Element Evaluation of the Residual Stress Fields Obtained by Hole Expansion on 6061-T6 Aluminum Welds

    By K. C. Viveros, R. R. Ambriz, C. García, F. De Villèle, A. Talha, D. Jaramillo

    Cold hole expansion on base metal, weld metal and heat affected zone of 6061-T6 aluminum alloy welds was simulated by means of finite element method. Three dimensional compact test models with a previ

    Jan 1, 2014

  • CIM
    Cyclone modelling: A review of present technology

    By L. R. Plitt, A. A. Turak, B. C. Flintoff

    "Since the publication of empirical cyclone models by Lynch and Rao in 1975 and by Plitt in 1976, the technical literature on this subject has consisted primarily of reports of applications, with only

    Jan 1, 1987

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017

  • CIM
    Deep Shaft Hoisting at Laronde - The Penna Shaft Hoisting Plant

    By Bennett McLaughlin

    AGNICO-EAGLE started sinking the Penna Shaft in 1995 with a hoisting plant capable of hoisting 1,800 tonnes per day from a 2,240 metre deep shaft. Exploration success lead to the installation of a hoi

    May 1, 2001

  • CIM
    Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of Canada

    By Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie

    "A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im

    Jan 1, 2009