Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Multicomponent modelling of ore blending in grinding circuits – a new model and case study

    By J J. Hanhiniemi, M S. Powell

    A ‘Variable Blend and Rates’ model is developed for SAG mills which extends upon the JKSimMet® Variable Rates Model. Similarly, a ‘Variable Blend Residence Constrained Perfect Mixing’ Ball Mill model

    Aug 24, 2022

  • AUSIMM
    A Multiscale Approach to Hydrothermal Gold Systems - Unravelling Mineralisation Processes at the Plutonic Gold Mine

    By J Walshe, G Duclaux, L A. Fisher, R Hough, J S. Cleverley, M F. Gazley

    Characterisation of hydrothermal gold systems across multiple scales is increasingly important for our understanding of ore deposit genesis and for targeting new mineralisation. Published work on mult

    Sep 26, 2013

  • AUSIMM
    The successful deployment of a fatal risk system, designed for the front-line

    By C J. Pitzer

    The prevention of fatal risks is a key objective for the global resources industry, especially considering poor performance with regard to fatality rate reduction and the continued occurrence of mine

    Mar 29, 2023

  • AUSIMM
    Preparing Effective Specifications for Occupational Health and Environmental Noise Objectives in Mining Project Design and Delivery

    By C Tickell

    Achieving occupational health and environmental noise objectives is a major consideration in the planning or operational phase of resource development and industrial projects to meet the needs of the

    May 9, 2016

  • AUSIMM
    Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru

    By R Baumgartner

    The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic

    Sep 5, 2011

  • AUSIMM
    Moisture/particle interactions under oscillatory motion – model development

    By K Williams, A Lavrinec, V Gurung, D Ilic

    The moisture content of iron ore during handling can range from the dust extinction moisture at the point of arrival at the port to the transportable moisture limit at the point of loading ships for m

    Sep 18, 2023

  • AUSIMM
    Application of enterprise optimisation considering ultra high intensity blasting

    By J Pan

    This case study assesses the application of Mine-to-Mill optimisation combined with Whittle Consulting’s Prober<sup>®</sup> economic optimisation for the purpose of economic value upl

    Nov 21, 2018

  • AUSIMM
    The Approval of a Gold Mine in the Solomon Islands ù Environmental Planning Issues

    The Gold Ridge Mine is an open-cut gold mine in the Solomon Islands. The mine is owned and operated by Gold Ridge Mining Limited, a wholly owned subsidiary of Ross Mining NL. At the invitation of the

    Jan 1, 1999

  • AUSIMM
    New Ore Types from the Cauê Banded Iron Formation, Quadrilátero Ferrífero, Minas Gerais, Brazil – Responses to the Growing Demand

    By L Q. Amorim

    The mining district of the Quadrilátero Ferrífero (QF) in southeastern Brazil contributes to 70 per cent of the Brazilian iron ore production, which reached 370 Mt in 2010. Traditionally, four iron or

    Jul 11, 2011

  • AUSIMM
    Staying in the Game – the Importance of Engineering-based Decisions

    By P J. Fairfield

    This paper reflects on the author’s experience working in site-based technical and management roles over a 29 year period, and the past 12 years in internal and external consulting roles. It discusses

    Jun 22, 2016

  • AUSIMM
    HIT – a Portable Field Device for Rapid Testing at Site

    By T Kojovic

    "The index A*b, determined from the Julius Kruttschnitt Mineral Research Centre (JKMRC) drop weight tester (DWT) results, has become well-known in the mining industry as a reliable measure of ore hard

    Oct 10, 2016

  • AUSIMM
    Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho

    May 24, 2023

  • AUSIMM
    Mineralisation of the Tom's Gully Gold Deposit, Northern Territory

    By Mizuta T, Sakurai M

    The Pine Creek Inlier produced 12 440 kg of gold in the period from the first gold discovery in the 1860s to the early-1900s. During the 1930s renewed large-scale prospecting took place and gave a

    Jan 1, 1994

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    The Separation of Pentlandite from Chalcopyrite, Pyrrhotite and Gangue in Nickel Projects Throughout the World

    By L Kormos, V Lawson, G Hill, G Marrs

    "In sulfide nickel deposits throughout the world, pentlandite and pyrrhotite are commonly found together along with varying amounts of chalcopyrite and platinum group minerals (PGMs). The mafic or ult

    Sep 1, 2014

  • AUSIMM
    Receiving Environment Monitoring Programs - Making the Most out of Biological Indicators and Direct Toxicity Assessments for Monitoring of Aquatic Ecosystems

    By L Thorburn

    In 2009, the Queensland Government developed a series of amendments to environmental authorities (EAs) for mines throughout the Fitzroy Basin in response to studies that assessed the cumulative impact

    Nov 26, 2013

  • AUSIMM
    A Practical Approach to Truck Dispatch for Open Pit Mines

    By D M. Silva, J C. Alves

    According to the literature, material transportation represents 50 per cent of the operating costs for an open pit mine. In this context, this paper proposes a multistage approach for dynamic truck di

    Sep 26, 2011

  • AUSIMM
    Iron Sinter Process Control Using X-ray Diffraction

    By U König, N Norberg

    Traditionally, quality control of iron sinter has relied on time-consuming wet chemistry. However, the mineralogical composition that defines the physical properties, such as strength or reducibility,

    Jul 13, 2015

  • AUSIMM
    Sustainable Waste Rock Remediation and Revegetation - A Real-World Longitudinal Study Comparing ViroMine Technology to Standard Applications and Doing Nothing

    By D Blair, L Fergusson, G Barros

    "The purpose of this paper is to present the findings of a waste rock remediation program conducted at a gold mine in New South Wales (NSW) over a six-year period. The treatment of waste rock dumps in

    Jul 10, 2012

  • AUSIMM
    Optimum Management of Truck Tyres in a Mine

    By S Casas Castellanos

    "Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o

    Nov 15, 2016