Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Implementation of Selective Mining Practices at Hadleigh Castle Mine, Charters Towers

    By I P. Hodkinson

    SMC Resources Limited is implementing a selective mining approach at the Hadleigh Castle mine, formerly operated by Aurora Gold Limited. The main ore zone has a length of 250 metres and dips at 40 - 4

    Jan 1, 1998

  • AUSIMM
    The Gold-Rich Dizon Porphyry Copper Mine in the Western Central Luzon Island, Philippines: Its Geology and Tectonic Setting

    The Dizon open pit mine of Benguet Corporation in western Central Luzon, Philippines has yielded some 182 000 t copper, and about 26 000 kg gold and 48 000 kg silver as by products since it starte

    Jan 1, 1987

  • AUSIMM
    Integrated Expert Control System for Grinding and Flotation

    By Jarvensivu M, Ylinen R, Jamsa-Jounela S-L

    The paper presents a new integrated system for control of concentration processes. The system is based on cluster-based modelling taking the ore quality into account and a new on-line particle size

    Jan 1, 1993

  • AUSIMM
    Geophysical Studies of Rift Structures and Dynamics

    Teleseismic travel time residuals measured on 600-1000 km seismic arrays across the Rio Grande and East African rifts provide evidence for upper mantle low velocity zones beneath each rift of velo

    Jan 1, 1987

  • AUSIMM
    An Underground Air Blast - Codelco Chile - Division Salvador

    By M Fishwick Tapia

    This paper was prepared and translated from the final report of the investigation into the Codelco Chile Salvador DivisionÆs air blast which occurred in the Inca-West area. In this section of the bloc

    Jan 1, 2000

  • AUSIMM
    A Computer Program for Analysing Rock Behaviour Based on the Bieniawski Criterion

    Development of a global failure criterion for rocks has been a desired goal in rock mechanics. Due to variations in factors affecting rock specifications and their mechanical properties, proposing a s

    Nov 25, 2010

  • AUSIMM
    Developments in Gas Handling and Associated Environment Activities at Smelting Plants of Mount Isa Mines Limited

    By Whitworth N, Anderson P

    New plant has been commissioned to treat off-gases from the Fluo-solids Reactor in the Copper Smelter. The new section of plant was built onto an operating system and commissioned with minimum disr

    Jan 1, 1978

  • AUSIMM
    Mining and Sustainability - Placer Niugini Limited

    Can mining promote sustainable development? What is sustainable development? Is sustainable development good for corporate sustainability? Does it work in practice? If so, is it good for business? Thi

    Jan 1, 1999

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    The Tajo Largo Gold Deposit, Argentina - Mineralogy and Fluid Inclusions Study

    By A S. Fogliata, L Bengochea, G Mas, J E. Lazarte

    The Culampajß auriferous district is located in the northern sector of the eastern edge of the homonymous hill, Catamarca Province, Argentina. Tajo Largo mine is situated in the southern flank of Las

    Jan 1, 2008

  • AUSIMM
    The Development of the Aircore Sampling System

    By J M. Wallis

    Heavy mineral sand exploration drilling prior to the 1970s generally utilised open hole auger and air-blast type drilling. However, mining reconciliations were poor and limitations on accuracy and pre

    Oct 5, 2011

  • AUSIMM
    Application of RISKGATE to Coal Mine Tailings Dams

    By M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe

    RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan

    Jul 16, 2014

  • AUSIMM
    Optimising Assessment and Selection with Indigenous People in Remote Communities

    By P Davidson

    For many years, in numerous settings, the need for a language-fair and culture-fair assessment test has been identified as a significant issue for employment and selection for training of remote indig

    Jan 1, 2006

  • AUSIMM
    Developments in Equipment Used for Overburden Removal and Coal Winning in the Brown Coal Industry Part 1 Excavation Equipment

    The brown coal deposits of the Latrobe Valley are ideal for open cut mining and this method has been used since the start of coal winning in 1894. Operations at the main Yall9urn open cut commenced in

    Jan 1, 1960

  • AUSIMM
    Australian Participation in the Ocean Drilling Program: an Economic Geology Perspective (Australian ODP Secretariat, Department ofEarth Sciences)

    By Rowena C. Duckworth

    The Ocean Drilling Program (ODP) is the largest international geoscience project in the world, and the state-of-the-art drill ship, the JOIDES Resolution, is permanently at sea. Each year there are s

    Jan 1, 1995

  • AUSIMM
    Hudson Bay Mining and Smelting ù æA Turnaround SuccessÆ

    By D W. Nisbet

    Today Hudson Bay Mining and SmeltingÆs 777 Project is the largest mining construction project under way in Canada. The project comprises six components: construction of the new 777 zinc-copper mine; c

    Jan 1, 2000

  • AUSIMM
    Evolution in Panel Caving Undercutting and Drawbell Excavation, El Teniente Mine

    By P Yß±ez, G Ferguson

    The El Teniente mine produces more than 340 000 tonnes of fine copper per year from an industrial complex of underground mine, concentrator and smelter. Mass caving methods are employed to deliver app

    Jan 1, 2000

  • AUSIMM
    The New System of Structural Analysis in Drillcore (5e6b1b05-501c-47dd-af5d-a853c9b25af1)

    A comprehensive analysisof rock structures in non-oriented (axially oriented) drillcore is now available (Laing, in press). The system embodies new concepts which better equip the geologist and engine

    Jan 1, 1990

  • AUSIMM
    Study on Paste Tailings Capping Ecology Reclamation on Acid Mine Waste Rock Dump

    By Z Lianbi, Z Yibin, Z Youhong, P Bin

    Without adequate soil available, it is difficult to rehabilitate a large area of acid mine waste dump with sustainable plant communities, which has a strong potential acid generation. In the present p

    Jul 10, 2012

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985