Search Documents

  • TMS
    Removal of Hg(II) from Aqueous Solutions Using Spent Grain

    By Liyuan Chai

    In this study, spent grain was used as an adsorbent for the removal of Hg(II) from aqueous solutions, the process parameters such as contact time, solution pH, adsorbent dose, and initial Hg(II) conce

    Jan 1, 2009

  • AUSIMM
    Overview of ArcelorMittal mining operations and research and development

    By T Sylow, A Correa De Araujo, M Gotelip Barbosa

    ArcelorMittal is among the largest world’s producers of iron ore. With a geographically diversified portfolio of iron ore and coal assets, it is strategically positioned to serve the network of steel

    Jul 24, 2017

  • CIM
    The Application of the Stackcell Technology for Fine Coal Recovery

    By E. S. Yan, R. Graley

    "The StackCell was developed to overcome the engineering and design challenges that are commonly associated with existing flotation technology such as pneumatic, self-aspirating cells, mechanical cell

    Jan 1, 2013

  • SAIMM
    Evaluation Of Oxine-Type Ligand Coordination To Zirconium (IV) - Synopsis

    By M. Steyn

    [Zr(C9H6NO)4]?(HCON(CH3)2)?(H2O), where (C9H6NO) = 8-hydroxy quinoline (oxH), was synthesized and characterized. This tetrakis-coordinated zirconium complex crystallized in the triclinic crystal syste

    Jan 1, 2013

  • DFI
    Optimization of the Piled-Raft Foundations Considering the Soil-Pile-Raft Interaction

    By Hessam Yazdani

    In comparison to the conventional piled foundations, the piled-raft foundations provide a more economical solution to support high-rise buildings constructed on soft soils. In this type of foundations

    Jan 1, 2013

  • CIM
    Supporting Robust Strategic Underground Mine Decision-Making

    By Tarrant Elkington

    Underground mine planning practices are typically manual and time consuming and will often produce sub-optimal solutions due to the application of generic rule-of-thumb assumptions or ?tried and teste

    May 1, 2010

  • SAIMM
    Grab sampling for underground goldmine grade control ? Synopsis

    Geologists in some underground gold mines collect grab samples from broken ore piles or trucks as a method of grade control. It is often known as muck sampling. Generally, the goal of grab sampling is

    Jan 1, 2010

  • CIM
    Error Associated with the Sampling of Gold Ores

    By Raphaël Mermillod-Blondin, Claude Bazin

    "Sampling is an important step for ore body evaluation and daily plant material balances. The Gy’s equation is regularly used to assess the size of the samples to be collected and to estimate the repr

    Jan 1, 2012

  • SME
    Field Evaluation Of The Coal Dust Explosibility Meter (CDEM) (d49e1078-3f23-4b51-b4d8-ee07d3406528)

    By M. L. Harris

    In underground mines, coal dust explosions are prevented by the addition of rock dust sufficient to render the coal dust inert. The National Institute for Occupational Safety and Health (NIOSH) develo

    Jan 1, 2008

  • SME
    EPB TBM Technology

    By Werner Burger

    Earth Pressure tunnel boring machines are tackling difficult ground conditions that five years previous were not considered feasible. The technology has evolved that allows EPB TBMs to cross into area

    Jan 1, 2008

  • NIOSH
    The Smokeless Combustion Of Coal In Boiler Furnaces - With A Chapter On Central Heating Plants ? Introduction ? The Problem And Its Solution

    By D. T. Randall

    The burning of coal without smoke is a problem that concerns the Government directly because of the advantages of smokeless combustion both in public buildings and on naval vessels. In addition, smoke

    Jan 1, 1918

  • SME
    Ambitious Endeavors in Mechanized Shaft Construction: A Case History of Two Mine Shaft Projects in Australia

    By John Zeni

    In Australia during the 1990s, Zeni Drilling took on several demanding shaft boring contracts. This paper describes the safety, operational, technical and environmental advantages derived through the

    Jan 1, 2001

  • NIOSH
    OFR-183-82 Development Of Systematic Waste Disposal Plans For Metal And Nonmetal Mines

    By G. W. Center

    This manual is intended to assist federal, state, and local regulatory and planning agencies, the mining industry and consulting engineers in determining the regulatory, environmental, technical and e

    Jan 1, 1982

  • AUSIMM
    A Preliminary Geotechnical Assessment for Re-Opening the Blackwater Mine

    By J Taylor, L Richards, M McKenzie

    When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.

    Jan 1, 1996

  • SME-ICGCM
    Geostatistical Methods For Hazard Assessment And Site Characterization In Mining

    By Jennifer Riefenberg

    Ground control hazards, coal quality, ore reserve estimation, and pollution modeling seem unrelated topics from most mining perspectives. However, geostatistical methods can be used to characterize ea

    Jan 1, 1996

  • NIOSH
    Thermodynamic, Electrical, Physical, And Compositional Properties Of Seeded Coal Combustion Products

    By H. F. Feldmann

    This work was done to provide thermodynamic, electrical, physical, and compositional data on the seeded combustion plasmas of seven coals for the design of MHD generators. The systems were assumed to

    Jan 1, 1970

  • AUSIMM
    Notes on the Takasima Coal Mines, Nagasaki, Japan

    The Takasima Coal Mines comprise four islands near the entrance to Nagasaki Harbour, and are owned and worked by the Mitsu Bishi Company.There are several unusual features in the occurrence and workin

    Jan 1, 1901

  • NIOSH
    Use Of The Mining Rock Mass Rating (MRMR) Classification: Industry Experience

    By Gabriel S. Esterhuizen, Jarek Jakubec

    In 2000, Laubscher’s Mining Rock Mass Rating (MRMR) classification system was updated and published. The new system brought a few fundamental changes that were in direct response to the challenges and

    Jan 5, 2007

  • SME
    Drainage Ph, Acid Production, And Acid Neutralization For Archean Greenstone Rock

    By K. A. Lapakko, D. A. Antonson

    Fourteen samples of pyrite-bearing Archean greenstone rock (d < 6.35 mm, 0.04% < St < 1.22%) were characterized (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing.

    Jan 1, 2002

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013