Search Documents

  • ISEE
    "Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"

    By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo

    For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish

    Jan 1, 2016

  • ABM
    Integridade Superficial Do Aço Aisi H13 Usinados Por Edm Na Fabricação De Matrizes De Conformação A Quente

    By Thiago Marques Ivaniski

    A fabricação de componentes para conformação mecânica possui uma gama de exigências devido aos esforços cíclicos, como por exemplo, fadiga térmica. Devido à capacidade de formar geometrias complexas e

    Aug 17, 2017

  • CIM
    Review of Noront’s Eagle’s Nest Project

    By Paul Semple

    "In 2007, Noront Resources Inc. discovered the high grade nickel copper PGE deposit in northwestern Ontario in a region now known as the Ring of Fire. Since the initial discovery, Noront has advanced

    Jan 1, 2013

  • NIOSH
    IC 8431 Transportation Of Mineral Commodities On The Inland Waterways Of The South-Central States

    By Frank B. Fulkerson

    Barge traffic on the Nation's inland waterways over the past 15 years has been increasing at a rate much faster than intercity freight traffic by all modes, largely due to the growing consumption

    Jan 1, 1969

  • CIM
    The Separation and Testing of Contaminated Site Materials Using Mineral Processing Technology

    By Michael J. Lord, Richard H. O. Wagner

    "The technologies used in the mineral processing of ores are being increasingly applied to the identification and remediation of metal contaminated industrial, military and landfill sites. The objecti

    Jan 1, 1999

  • AUSIMM
    Mining Methods at Mount Morgan Limited, Mount Morgan, Queensland

    By Patterson B. G

    The small party of mining men who formed the original Mount Morgan Syndicate in 1882, commenced operations on the top of the mountain with what were practically nothing more than small hillside quarri

    Jan 1, 1939

  • CIM
    NYE Concentrator Expansion

    By D. Turk, P. Lefebvre, J. Sargent, K. Major

    "Stillwater Mining Company recovers platinum and palladium from their Nye Montana operations. Mining first commenced at Nye in 1987 at a milling rate of 455 t/d (500 stpd). The plant was expanded in 1

    Jan 1, 2000

  • NIOSH
    IC 7285 Geophysical Abstracts 116 January-March 1944 - 1. Gravitational Methods

    7253. Arkhangelsky, A. D. Geological Results of the General Magnetometric and Gravimetric Surveys of the U.S.S.R. (in Russian). Internat. Geol. Cong., Rep. of the 17th Sess., Moscow-Leningrad, 1937, v

    Jan 1, 1944

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • NIOSH
    OFR-55-79 Oil Mining - A Technical And Economic Feasibility Study Of Oil Production By Mining Methods

    By Anthony Edey

    This report describes work performed and results obtained for the technical and economic feasibility study of oil production by mining methods. The characteristics of oil fields which would make them

    Jan 1, 1978

  • SME
    Electrical Resistivity: An Answer to the Challenges Raised by the Design of a 17 Km-long Tunnel in the Andes

    By Farrukh M. Mazhar, Philippe P. Martin

    Electrical Vertical Sounding (EVS) profiling has proven to be a valuable tool to set the alignment and guide the design of a 17 km-long, 4.7m diameter water-conveyance tunnel in the Peruvian Andes at

    Jan 1, 2003

  • DFI
    Guide to Drafting a Specification for High Capacity Drilled and Grouted Micropiles for Structural Support

    By Donald Bruce

    The three types of specifications which are used for micropile work are: ? Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must

    Jan 1, 2004

  • DFI
    Guide to Drafting a Specification for Micropiles (XXII International Mineral Processing Congress)

    By Joint Micropiles Committee

    "The three types of specifications which are used for micropile work are: • Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must

    Jan 1, 2004

  • AUSIMM
    Deterministic Expert Systems : A New Planning Tool for Project Development

    Project developent proceeds by increasingly detailed studies addressing overall project returns through an analysis of the substance, risks and costs associated with the following elements: ò Reserv

    Jan 1, 1989

  • AUSIMM
    Low-Sulfidation Epithermal Veins at the Gladstone Hill Prospect, Waihi, New Zealand

    By J L. Mauk

    The Gladstone Hill area hosts epithermal veins similar to those at Martha Hill, which is less than one kilometre away. There are several vein types in the Gladstone Hill area including (1) pyrite-marc

    Jan 1, 2001

  • NIOSH
    OFR-37-90 Design, Fabrication, And Testing Of A Bidirectional Auger

    By O. Llewellyn Jack

    From September 1978 to December 1983, ESD Corporation (formerly a Division of FMC Corporation) undertook the development and testing of a bidirectional auger under contract with the U.S. Department of

    Jan 1, 1983

  • NIOSH
    OFR-28-77 Evaluation Of Current Surface Coal Mining Overburden Handling Techniques And Reclamation Practices

    By Frank Cook

    In this two-year study, an evaluation of mining and reclamation practices at 159 randomly sampled surface coal mines in the United States was conducted. It is concluded that reclamation practices in m

    Jan 1, 1976

  • SME-ICGCM
    New Approach in Rock Bolting that Adds to Bearing Capacity and Yield of the Bolts without Increase to the Cost of the Technology

    By Victor Nazimko

    A new technique for reaming the holes has been tested. This technique is available for reaming a hole at its deep end creating an enlarged cavity that has helicoidal grooves oriented at less than 40 d

    Jan 1, 2008

  • ABM
    Otimização Do Planejamento Semanal Das Máquinas De Lingotamento Contínuo Da Arcelormittal Tubarão

    By Marcos Fernando Campioto Junior

    O objetivo deste trabalho é apresentar os resultados obtidos, após a implantação da ferramenta de otimização do planejamento e programação da produção CScheduler Weekly Planner da PSI Metals na Arcelo

    Oct 30, 2017

  • NIOSH
    OFR-3(1)-85 Caving Mine Rock Mass Classification And Support Estimation - Volume I - Final Report

    By Robert A. Cummings

    A rock mass classification system has been developed for recommending drift support requirements in block caving mines. This development follows a two-year program incorporating field observations of

    Jan 1, 1984