"Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo
For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish
Jan 1, 2016
-
Integridade Superficial Do Aço Aisi H13 Usinados Por Edm Na Fabricação De Matrizes De Conformação A QuenteBy Thiago Marques Ivaniski
A fabricação de componentes para conformação mecânica possui uma gama de exigências devido aos esforços cíclicos, como por exemplo, fadiga térmica. Devido à capacidade de formar geometrias complexas e
Aug 17, 2017
-
Review of Noront’s Eagle’s Nest ProjectBy Paul Semple
"In 2007, Noront Resources Inc. discovered the high grade nickel copper PGE deposit in northwestern Ontario in a region now known as the Ring of Fire. Since the initial discovery, Noront has advanced
Jan 1, 2013
-
IC 8431 Transportation Of Mineral Commodities On The Inland Waterways Of The South-Central StatesBy Frank B. Fulkerson
Barge traffic on the Nation's inland waterways over the past 15 years has been increasing at a rate much faster than intercity freight traffic by all modes, largely due to the growing consumption
Jan 1, 1969
-
The Separation and Testing of Contaminated Site Materials Using Mineral Processing TechnologyBy Michael J. Lord, Richard H. O. Wagner
"The technologies used in the mineral processing of ores are being increasingly applied to the identification and remediation of metal contaminated industrial, military and landfill sites. The objecti
Jan 1, 1999
-
Mining Methods at Mount Morgan Limited, Mount Morgan, QueenslandBy Patterson B. G
The small party of mining men who formed the original Mount Morgan Syndicate in 1882, commenced operations on the top of the mountain with what were practically nothing more than small hillside quarri
Jan 1, 1939
-
NYE Concentrator ExpansionBy D. Turk, P. Lefebvre, J. Sargent, K. Major
"Stillwater Mining Company recovers platinum and palladium from their Nye Montana operations. Mining first commenced at Nye in 1987 at a milling rate of 455 t/d (500 stpd). The plant was expanded in 1
Jan 1, 2000
-
IC 7285 Geophysical Abstracts 116 January-March 1944 - 1. Gravitational Methods7253. Arkhangelsky, A. D. Geological Results of the General Magnetometric and Gravimetric Surveys of the U.S.S.R. (in Russian). Internat. Geol. Cong., Rep. of the 17th Sess., Moscow-Leningrad, 1937, v
Jan 1, 1944
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field WorkBy Darrell L. Beddard
Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai
Jan 1, 1996
-
OFR-55-79 Oil Mining - A Technical And Economic Feasibility Study Of Oil Production By Mining MethodsBy Anthony Edey
This report describes work performed and results obtained for the technical and economic feasibility study of oil production by mining methods. The characteristics of oil fields which would make them
Jan 1, 1978
-
Electrical Resistivity: An Answer to the Challenges Raised by the Design of a 17 Km-long Tunnel in the AndesBy Farrukh M. Mazhar, Philippe P. Martin
Electrical Vertical Sounding (EVS) profiling has proven to be a valuable tool to set the alignment and guide the design of a 17 km-long, 4.7m diameter water-conveyance tunnel in the Peruvian Andes at
Jan 1, 2003
-
Guide to Drafting a Specification for High Capacity Drilled and Grouted Micropiles for Structural SupportBy Donald Bruce
The three types of specifications which are used for micropile work are: ? Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must
Jan 1, 2004
-
Guide to Drafting a Specification for Micropiles (XXII International Mineral Processing Congress)By Joint Micropiles Committee
"The three types of specifications which are used for micropile work are: • Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must
Jan 1, 2004
-
Deterministic Expert Systems : A New Planning Tool for Project DevelopmentProject developent proceeds by increasingly detailed studies addressing overall project returns through an analysis of the substance, risks and costs associated with the following elements: ò Reserv
Jan 1, 1989
-
Low-Sulfidation Epithermal Veins at the Gladstone Hill Prospect, Waihi, New ZealandBy J L. Mauk
The Gladstone Hill area hosts epithermal veins similar to those at Martha Hill, which is less than one kilometre away. There are several vein types in the Gladstone Hill area including (1) pyrite-marc
Jan 1, 2001
-
OFR-37-90 Design, Fabrication, And Testing Of A Bidirectional AugerBy O. Llewellyn Jack
From September 1978 to December 1983, ESD Corporation (formerly a Division of FMC Corporation) undertook the development and testing of a bidirectional auger under contract with the U.S. Department of
Jan 1, 1983
-
OFR-28-77 Evaluation Of Current Surface Coal Mining Overburden Handling Techniques And Reclamation PracticesBy Frank Cook
In this two-year study, an evaluation of mining and reclamation practices at 159 randomly sampled surface coal mines in the United States was conducted. It is concluded that reclamation practices in m
Jan 1, 1976
-
New Approach in Rock Bolting that Adds to Bearing Capacity and Yield of the Bolts without Increase to the Cost of the TechnologyBy Victor Nazimko
A new technique for reaming the holes has been tested. This technique is available for reaming a hole at its deep end creating an enlarged cavity that has helicoidal grooves oriented at less than 40 d
Jan 1, 2008
-
Otimização Do Planejamento Semanal Das Máquinas De Lingotamento Contínuo Da Arcelormittal TubarãoBy Marcos Fernando Campioto Junior
O objetivo deste trabalho é apresentar os resultados obtidos, após a implantação da ferramenta de otimização do planejamento e programação da produção CScheduler Weekly Planner da PSI Metals na Arcelo
Oct 30, 2017
-
OFR-3(1)-85 Caving Mine Rock Mass Classification And Support Estimation - Volume I - Final ReportBy Robert A. Cummings
A rock mass classification system has been developed for recommending drift support requirements in block caving mines. This development follows a two-year program incorporating field observations of
Jan 1, 1984