Search Documents

  • DFI
    Stress And Deformation Of Pile Foundation Of Sutong Bridge

    By Yin Zongze

    The pile foundation of Sutong bridge pylons is an extra large pile foundation. The length of piles is 115m, and the diameter of the piles is 2.5-2.8m. Since the traditional design method may not deter

    Jan 1, 2006

  • AIME
    Logging and Log Interpretation - A Report on the Displacement Log

    By R. H. Winn

    A method for the selection of the most suitable corrosion inhibitor for a particular system is given. The method involves the evaluation of surface passivity by means of copper ion displacement after

  • CIM
    Rare Earths and the Potential for Rare-earth Deposits in Canada

    By J. L. Jambor, T. C. Birkett, W. D. Sinclair

    Abstract -The rare-earth elements (REE) form a significant part of the group of so-called "high­ technology" metals whose glamour has attracted both the scientific community and the mining industry. D

    Jan 1, 1992

  • TMS
    Recovery of Metals from Electronic Scrap by Hydrometallurgical Route

    By Nikhil Dhawan

    Electronic waste (e-waste) is a collective name given to discarded electronic devices such as Television, Cellular Phones and Personal Computers. Among the heterogeneous metals present in the e-waste

    Jan 1, 2009

  • IIMP
    Automatización de pautas de mantenimiento con RFID

    By Carlos White

    El presente texto describe la importancia del correcto funcionamiento de los equipos en las faenas mineras a través de las pautas de inspección y formularios impresos en papel y llenados manualmente

    Jun 1, 2016

  • IIMP
    Voladuras masivas mejorando fragmentacion y estabilidad de paredes finales

    By Martín E. Mendoza

    En 2010 se identificó un peligro potencial en la pared Norte del Tajo Chaquicocha, donde existía fallas pre-existentes, catch bench reducidos (subestándar) y bloques colgados que presuponían condicion

    Sep 12, 2011

  • SAIMM
    Wind Erosion Of Tailings Dams And Mitigation Of The Dust Nuisance

    By G. E. Blight

    Wind erosion can be a major cause of the loss and dispersion of tailings material from a tailings dam into its surrounding environment. Such dust dispersion can be a serious nuisance, as well as a hea

    Jan 1, 2007

  • CIM
    Turnagain Nickel Project: Playing a Key Role in the Development of Northwestern BC

    By Ed Beswick

    Resource Update Drilling Program ? Pre-feasibility ? Exploration Metallurgy Program ? Grindability ? Metallurgical Optimization ? Hydrometallurgical Options Preliminary Mine Development Design

    May 1, 2008

  • SME
    Jabali / Yanbu – A New Source Of Zinc In The Middle East (fe9d2734-cc3c-4ef2-b8ec-54ed953ef19a)

    By K. M. Stone, N. J. G. Masson, A. C. Woollett

    The Jabali zinc deposit, in Yemen, contains at least 9.4 Mt at a grade of 10.7% zinc, 2.2% lead and 77g/t silver. The zinc occurs as smithsonite with minor hydrozincite. The Jabali ore does not produc

    Jan 1, 2002

  • AUSIMM
    Mining Schools in Relation to the Mining Industry

    EARLY in 1911 the Public Service Board of New South Wales suggested the advisability of inaugurating a School of Mines at Broken Hill, arid made inquiries to determine how such an institution should b

    Jan 1, 1912

  • DFI
    Wave Equation Analysis And Dynamic Monitoring - A Presentation At The Deep Foundations Institute?McGill University Symposium Montreal, September 1983

    By Bengt Fellenius

    The conventional wave equation analysis without control of the representativeness of the parameters to the actual conditions does not provide accurate results. However, the representatives can be vast

    Jan 1, 1984

  • AIME
    Alan M. Bateman – An Interview by Henry Carlisle

    Carlisle: An old friend and good friend, Alan Bateman, is the Silliman Professor of Geology Emeritus at Yale and editor of the Journal of Economic Geology. Now, Alan, let's start off by telling u

    Jan 11, 1964

  • NIOSH
    RI 8762 Calamity Hollow Mine Fire Project - (In Five Parts) - 1. Development and Construction of the Burnout Control Ventilation System

    By Meherwan C. Irani

    The Bureau of Mines is developing a new technological approach to handling the problems of fires in abandoned coal mines and waste banks. This new technology involves the accelerated combustion of "wa

    Jan 1, 1983

  • SAIMM
    Modelling water uptake in highly compacted bentonite in environmental sealing barriers

    By W. Wittke, J. Gattermann

    ABSTRACT: One alternative to close a radioactive waste repository in rock salt is the construction of a “Cross Section Closure (CSC)“ sealing barrier. The proposed material for the CSC is highly compa

    Jan 1, 2003

  • NIOSH
    IC 7554 Reconnaissance of Metal Mining in the Sail Juan Region, Ouray, San Juan, and San Miguel Counties, Colo

    By Paul T. Allsman, William H. King

    This paper describes the mineral deposits and discusses mining and milling methods and related operating conditions in an important gold , silver , lead , and zinc producing area in Ouray , San Juan ,

    Mar 1, 1950

  • SME
    Putting Computational Fluid Dynamics To Work On Mining And Metals Projects

    By D. M. Lane, J. M. Berkoe

    Engineers and Owners share a common desire to build reliable, efficient plants on schedule at reasonable costs. This paper describes one tool that Bechtel finds can integrate these objectives by “pu

    Jan 1, 2000

  • AUSIMM
    Land Rehabilitation at Golden Cross, Eight Years After Mine Closure

    By D Crequer

    Land rehabilitation at Golden Cross is reviewed, 8 years after mine closure in 1997/98, from the perspectives of a Peer Reviewer (land rehabilitation) and a Regional Council Officer (Resource Consents

    Jan 1, 2006

  • AUSIMM
    Development of a Special Purpose Coupling for Jointing Polyurethane Lined, High Pressure Pipework

    The New Zealand Steel Ironsand Slurry Pipeline was successfully commissioned in February 1986. The project includes 18 km of high pressure, polyurethane lined buried pipe. McConnell Dowell Constructo

    Jan 1, 1986

  • AUSIMM
    Enhanced Drilling in Rio Tinto

    Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation is to improve the accuracy and consistency of mining processes and less

    May 1, 2010

  • IOM3
    Enhancement of dump truck operating efficiency: part 1: method of shovel and truck matching to obtain whole numbers; part 2: optimization of haul-road gradients; part 3: effect of reduced payload

    By I. R. Hanby

    A simple solution to the problem of whether to round the calculated number of trucks up or down to the nearest whole number is to adopt as criterion the minimum cost per unit volume/mass moved, assumi

    Jan 1, 1991