Search Documents

  • DFI
    Bore Pile Stabilization Issues in Offshore Marine Works

    By Nuno Cruz, Saúl Rodríguez

    "When executing offshore bored piles there are several specific factors and problems to consider in order to guarantee excavation stability. One of the methods employed to carry out this type of work

    Jan 1, 2017

  • SME
    A Machine Learning Model for Evaluation of Chain Pillar Stability in Deep Longwall Workings in India - Mining, Metallurgy & Exploration (2023)

    By A. Yadav, B. Behera, G. S. P. Singh

    The size of chain pillars in the Indian geo-mining conditions is primarily decided in accordance with the regulatory provisions. These provisions are of little help for deep longwall workings, exceedi

    Oct 18, 2023

  • AUSIMM
    Stope Filling with Thickened Classified Flotation Tailings

    By Yates C, Gillie E. W, Finucane K. J

    During the year 1940 a complete investigation was made of the whole of the stoping operations throughout the Great Boulder Mine and, as a result, it was decided to convert some of the existing shrinka

    Jan 1, 1945

  • SME
    Interpretation Of The Effect Of Frother Type And Concentration On Flotation Performance In An OK3 Cell

    By B. A. Comley

    Over the past few decades a great deal of effort has gone into characterizing the effects of frother type and concentration in flotation using a variety of two-phase techniques. Whilst useful and info

    Jan 1, 2007

  • NIOSH
    RI 5866 The Foam-Drive Process For Increasing The Recovery Of Oil ? Introduction And Summary

    By A. N. Fried

    With the growing importance of fluid injection in recent years, the petroleum industry has been investigating and field- testing a variety of new methods designed to modify the physical properties of

    Jan 1, 1961

  • AUSIMM
    High Speed Development Work at Emperor Mine, Vatukoula, Fiji

    With the exhaustion of orebodies close to the main haulage shaft of the Emperor mine, an increased rate of development, aimed at earlier investigation of values disclosed by exploration drill holes ha

    Jan 1, 1966

  • SME
    Barrick?s Zaldivar Mine Gets A Dome Cover Over Its Stockpile

    The Barrick Zaldivar mine is an openpit, heap-leach copper mine in Region II of northern Chile at an elevation of 3,300 m (10,826 ft), approximately 1,400 km (870 miles) north of Santiago and 175 km (

    Jan 1, 2009

  • AUSIMM
    Upgrading of Superfine Low-Grade Haematite Ores by Reverse Floatation Direct Reduction Low Intensity Magnetic Separation Process

    Upgrading of Superfine Low-Grade Haematite Ores by Reverse Floatation Direct Reduction Low Intensity Magnetic Separation Process

    Sep 13, 2010

  • AIME
  • IIMP
    Aplicaciones de las conclusiones del taller de prevención de caída de rocas-ISEM 2005 caso unidad minera Rosaura

    By . Jaime G Tapia Aguirre

    La Unidad Minera Rosaura del Grupo Glencore fue considerada la mina subterránea más segura del país durante los años 2005, 2006 y 2007. Sin embargo, cuando el Grupo Glencore adquirió la concesión de R

    Sep 12, 2011

  • IIMP
    Administración y optimización de operaciones de Heap Leaching haciendo uso de un simulador de procesos en Minera Yanacocha

    By Pedro Condori

    Usualmente, la minera Atacocha está expuesta a grandes precipitaciones pluviales durante una larga temporada húmeda. Por lo que es necesario eliminar gran parte del agua colectada por las lluvias a tr

    Sep 9, 2007

  • SAIMM
    The influence of Fe3+/Fe2+ratio on the viscosity of silicate slags

    Viscosity measurement was carried out over a narrow range of silica content around the fayalite composition. A wide range of temperature and oxygen potential was covered where the slag was completely

    Jan 1, 2004

  • SME
    The Stormwater Management and Road Tunnel (SMART), KualaLumpur, Malaysia—A Unique Use of Tunnel Space for both Traffic and Flood Water

    By Christopher J. Bambridge, Lee Seng Hoor

    The Stormwater Management and Road Tunnel (SMART) Tunnel is a world first in the use of tunnel space transmitting both road and water through the same spatial envelope. The unique aspect of the SMART

    Jan 1, 2005

  • AUSIMM
    Evolution of Selected Porphyry Copper-Gold Systems in the Southwest Pacific Region and its Relevance to Exploration

    The sequences in alteration and mineralisation from five copper-gold porphyry systems (Taysan and Didipio, Philippines; Horse-Ivaal and Wafi River, PNG; and Goonumbla, Australia) and one gold-copper s

    Jan 1, 1999

  • IOM3
    QTz curves for two skew distributions

    By A. Berckmans

    The key variables in the financial analysis of a mining project include the metal price and the quantities of ore and metal. In general, if the metal price drops, the cutoff grade is increased so as t

    Dec 1, 1996

  • IOM3
    Risk-based approach to setting of flyrock danger zones for blast sites

    By P. A. Davies

    Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 11pp., 15 refs. Hazards s

    Aug 1, 1995

  • AUSIMM
    Recovery of Copper from Chalcopyrite Concentrate by Means of Sulphur Activation, Cupric Chloride Leach, and Electrolysis

    Extraction of copper from a chalcopyrite concentrate by means of a cupric chloride leach is described. Initially the concentrate is mixed with sulphur in a 9: 1 ratio, and heated to 350-400°C. Th

    Jan 1, 1974

  • AUSIMM
    Measurement of sub-surface strata movement by multi-wire borehole instrumentation

    By Armstrong M

    The Coal Mining Engineering Branch of the New South Wales (NSW) Department of Mineral Resources, in its continuing effort to improve coal recovery from underground coal mining operations, has undertak

    Jan 1, 1986

  • ISEE
    Dutch Harbor, Alaska Unisea Quarry – Using Near Field Vibration Measurements to Improve Blasting Results Close to Structures

    By Mike Cammack, Logan Huppert, Gustavo Azpilcueta

    During the summer of 2015, Unisea Inc. sought proposals for the G1 Dock Replacement Project in Dutch Harbor, Alaska. It would be a one year project and construction was scheduled to begin in the sprin

    Jan 1, 2018

  • CIM
    Ivanhoe New Horizons

    By Jess Harding

    Oyu Tolgoi investment agreement now in full, legal effect Successful completion of a series of conditions to 2009 Investment Agreement was announced March 31, 2010. Full-scale construction now set t

    May 1, 2010