Search Documents

  • AUSIMM
    Processing Copper-Gold Ore at Ok Tedi

    By Kanau JL, Kilgour I

    This paper describes the metallurgical processes at the 80 000tpd Ok Tedi Mining Limited concentrator, which treats copper- gold ore by single-stage crushing, SAG and ball milling and flotation to

    Jan 1, 1991

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • AUSIMM
    Carbon Management in a High Gold Price Environment

    By J K. Claflin, S R. La Brooy

    A case study from a current Ausenco project is presented to demonstrate the importance of maintaining high carbon activity to illustrate the driving force for plant improvements such as a carbon regen

    Jul 15, 2013

  • DFI
    5 Pile Testing - Pile Testing

    By George Goble

    I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is

    Jan 1, 1994

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • AUSIMM
    Precipitation of Lead and Silver from Brine Solutions by Metallic Iron

    The preeipitation of dissolved lead from a strong brine by metallic iron is a chemically controlled, first order reaction. The precipitation rate is sensitive to changes in chloride concentration and

    Jan 1, 1961

  • AUSIMM
    Structural Controls in the Tarnagulla Goldfield, Central Victoria: Implications for Metamorphically Derived Auriferous Fluids

    By V Morand, W R. H Ramsay

    Structural, mineralogical, and textural data from the Tarnagulla Goldfield demonstrate that the area has undergone three significant phases of deformation. The first phase of deformation (D1) predates

    Jan 1, 1995

  • NIOSH
    RI 3016 The Lower Limits of Inflammability of Natural Gas-Air Mixtures in a Large Gallery

    By J. E. Crawshaw

    "The few previous observations of the effect of turbulence on limits of inflammability have been made on a small scale in turbulence produced either by a fan or by movement of the mixture.By a suitabl

    Jul 1, 1930

  • CIM
    Flotation of Base Metals from Grinding Mill Discharges

    By A. J. Williams

    "Conventional base metal milling practice normally consists of crushing, grinding and cyclone classification followed by flotation. It is the authors' belief that the commencement of flotation after c

    Jan 1, 1984

  • DFI
    Case History: Foundations For The New Mississippi River Bridge, St. Louis

    By Paul J. Axtell

    This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c

    Jan 1, 2011

  • SME
    George W. Luxbacher: An Interview With The 2008 SME President

    Talk some about your background. Mining, particularly coal, runs in the family. I come from a mining family, one generation re-moved. Both of my grandfathers worked in the coal mines. My mother?s

    Jan 1, 2008

  • AUSIMM
    Hidden Valley gold project development summary, 1987-1991

    This paper summarises the development t,) date for the Hidden Valley Gold (HVG) Project. It starts with the original exploration work, covers the detailed feasibility study activities and conclude

    Jan 1, 1991

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • AUSIMM
    Efficient Utilisation of Reductant in Composite Ore-Char Pellets

    By Gupta R. C

    Direct reduction of iron ore by solid reducing agents have been studied extensively and summarised by several authors (Otsuka and Kunii, 1969; Abraham and Ghosh, 1979; Frauhan, 1977; Rao, 1971; Kaw

    Jan 1, 1999

  • CIM
    St. Andrew Goldfields

    By P. Massi

    "Wholly owned by the Coniagas Mining Company, the oldest continuously listed mining company on the Toronto Stock Exchange, St. Andrew Goldfields is located on Hwy. 101 approximately 30 miles east of d

    Jan 1, 1992

  • AUSIMM
    Slag-Metal Equilibria in Tin Smelting

    The distribution of tin and iron between slag and metal phases at about 1150°C was studied in pot scale experiments. The distribution coefficient k = (Sn/Fe) In metal X (Fe/Sn) in slag was found

    Jan 1, 1966

  • NIOSH
    OFR-147-81 Technological Investigation To Develop Design Criteria For The Optimum Size Of Oil And Gas Well Blocks ? Phase III

    By Kenneth Wardell

    Criteria have been fully developed for determining the optimum size of oil and gas well blocks. The criteria lead to the formation of well barrier pillars which are, of themselves, inherently stable a

    Jan 1, 1980

  • SME-ICGCM
    Clay Veins: Their Physical Characteristics. Prediction, and Support

    By Frank E. Chase

    Clay veins, also referred to as clay elastic dikes, have been responsible for numerous underground injuries and fatalities. These hazardous structures are also responsible for increased production cos

    Jan 1, 1984

  • DFI
    Increase In Shear Modulus By Soil Mix And Jet Grout Methods

    By Paul J. Axtell

    The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc

    Jan 1, 2008

  • AUSIMM
    Computer Usage for Grade Control and Short Term Planning

    Computer applications are ideally suited to the day to day operations of grade control and short term planning on a mine site. By refining this part of the operation there is scope to increase prof

    Jan 1, 1989