Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Evolution of Intelligent Coal Pillar Design: 1981-2006 (550072c4-5cb4-4845-a20b-da35141e93d6)

    By Christopher Mark

    The first International Conference on Ground Control in Mining opened with the topic of pillar design. Two classic papers were presented, one by Bieniwski and the other by Wilson. Unfortunately, the

    Jan 1, 2006

  • SME-ICGCM
    Front abutment effects on supplemental support in predriven longwall equipment recovery rooms

    By Jeffrey M. Listak

    This report describes a study, conducted jointly by BethEnergy Mines Inc. and the Bureau of Mines, to assess the effects of longwall front abutment loading on various supplemental support materials u

    Jan 1, 1989

  • SME-ICGCM
    Donut Cribbing--A Hew Heavy-Duty Roof Support Concept

    By Nicholas Chlumecky

    One of the oldest mine supports in use today is timber cribbing. In many mining operations material, installation and maintenance costs for timber cribbings are substantial. Their performance characte

    Jan 1, 1986

  • SME-ICGCM
    Geomechanic Monitoring And Distributed Information Systems

    By G. I. Gritsko

    In this paper we consider the elements of a distributed information geomechanic monitoring system which is used in computerized mine planning and mining operations control. The automated system is a t

    Jan 1, 1996

  • SME-ICGCM
    Roof Bolter Rocker Pad Deflector Systems (6ff5d1f9-2211-4169-8a90-2ad9493ee24a)

    By Arnold Hammons

    Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby

    Jan 1, 2009

  • SME-ICGCM
    Dynamic rock anchors

    By James J. Scott

    Dynamic rock anchors are interior fixtures developed by the author which promise to be a revolutionary development in the field of ground control. The fixtures are designed to be placed in the ground

    Jan 1, 1989

  • SME-ICGCM
    Cable Support Systems For Longwall Gate Road Stability

    By Stephen C. Tadolini

    The U.S. Bureau of Mines, in cooperation with the Cyprus- Plateau Mining Company, has conducted research to provide an alternative to traditional secondary support systems in a two-entry, yield pillar

    Jan 1, 1995

  • SME-ICGCM
    Geotechnical Assessment Of Skin Reinforcement In Underground Mines (f05de68f-e8c8-43ca-aab9-9a65452cc10f)

    By Jan A. Nemcik

    Steel mesh has been used successfully for many years to control friable roof conditions and prevent loose roof and rib material from caving into the roadway. Despite its extensive use, the installati

    Jan 1, 2009

  • SME-ICGCM
    Pillar Design Issues For Underground Stone Mines (5c6602ba-4b85-4ec3-ad15-c1c321c1afcd)

    By A. T. Iannacchione

    Underground stone mining represents an emerging sector for the U.S. mining industry. As this expansion takes mines under deeper cover and as more efficient mining methods are utilized, adequate stone

    Jan 1, 1999

  • SME-ICGCM
    Numerical Modelling of the Range of Rock Fracture Zone Around Gateroads on the Basis of Underground Measurement Results (edbcb7c0-6a88-4056-904b-d121adf0097c)

    By Andrzej Walentek

    This paper presents the results of numerical modeling of the fractured zone around longwall gateroads. The numerical computations have been based on the results of underground measurements of the frac

    Jan 1, 2009

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • SME-ICGCM
    An Innovated Self-Screwed Tube Bolting System(STBS) To Reinforce Stability Of Mine Entries (b3995592-5744-4f95-89d6-4030a00b69b4)

    By Xingtian Hui

    Due to variation in the geological natures of underground coal mines, especially when the entry?s roof/floor are soft and weak, it is vital to select an appropriate roof bolting system to ensure entry

    Jan 1, 2009

  • SME-ICGCM
    Understanding the hydraulic pressure cell

    By Keith A. Heasley

    Numerous different instruments and techniques have been developed for the purpose of measuring rock stress and stress changes around excavations. The interpretation of the output from many of these in

    Jan 1, 1989

  • SME-ICGCM
    Applications Of Probabilistic Analysis In Mine Ground Control

    By Gang Chen

    Conventional methods designate a factor of safety, a deterministic number, to indicate the stability of a mine excavation. However, this deterministic description of excavation stability is frequently

    Jan 1, 1996

  • SME-ICGCM
    Ground Control Design Challenges At The El Boleo Copper Project (fe854eab-fde5-445c-8a43-3f4fce2f58ca)

    By David Conover

    The El Boleo Copper Project is currently in the final design stages for development of a 3-MM-tonne/yr underground copper mine located in Baja California, Mexico. The nearly horizontal mineralized zo

    Jan 1, 2009

  • SME-ICGCM
    Regional Two-Seam Stress Analyses At The Deer Creek Mine (58f624e3-fdec-4f72-b0ef-8ec1e65d9bd2)

    By Hamid Maleki

    A geotechnical monitoring program has been implemented at Energy West Mining Company for enhancing site-specific evaluation of longwall stress conditions. This program consists of underground measure

    Jan 1, 2009

  • SME-ICGCM
    Displacement Discontinuity Method For Three-Dimensional Stress Analysis Of Tabular Excavations In Non-Homogeneous Rock (ff6cd480-c238-4f06-bf11-52c054cbd2e8)

    By Leigh J. Wardle

    This paper describes a numerical method for calculating the three¬-dimensional stresses and displacements induced by tabular excavations in a rock mass consisting of parallel layers of distinct mater

    Jan 1, 1984

  • SME-ICGCM
    Subsidence Control Over Abandoned Mines

    By Victor V. Nazimko

    Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for

    Jan 1, 1996

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • SME-ICGCM
    Rapid Assessment Of Gateroad Roof Stability By Simple Monitoring Techniques

    By Peter Cain

    In response to the appearance of excessive convergence of bolted gateroads in the front abutment zone of retreating coal faces at Phalen Colliery, staff from the CANMET Cape Breton Coal Research Labor

    Jan 1, 1996