Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Stability Of Interpanel-Pillar And Deformation Of Gateroad Due To Longwall Mining
Retreat longwall method with re-use of gateroad has been traditionally employed in Japan, mainly because of the advantage of higher recovery. But the Miike Colliery has newly introduced the interpanel
Jan 1, 1990
-
Load Transfer Mechanics In Fully-Grouted Roof Bolts
By Maynard O. Serbousek
The mechanics of load transfer of fully-grouted roof bolts in coal mines has been investigated in laboratory and analytical studies. The purpose of this research is to increase the understanding and b
Jan 1, 1984
-
Inorganic Cement Grouted Bolt System
By M. O. Serbousek
In 1975 the Bureau of Mines Spokane Research Center began a series of laboratory and field tests to investigate the feasibility of developing a substitute for the organic chemicals used in resin roof-
Jan 1, 1981
-
An Underground Trial Of Cable Slings For Remedial Support Of Longwall Gateroads
By William D. Gallant
This paper describes a joint cooperative project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to conduct a trial of split set cable slings for re
Jan 1, 1990
-
Application Of Bolt Design Criteria At Galatia Mine
By Tom Denton
The bolt design criteria, since it was first published by Dr. John Stankus (Stankus, 1997), has been recognized as an important tool in ground control design. This concept is based on the Optimum Beam
Jan 1, 2000
-
Influences of Longwall Subsidence on a Guyed Steel Tower - A Case Study
By Yi Luo
The potential influences of mining subsidence on structural stability, integrity and functionality of guyed tower structures have not been systematically studied before. This paper presents a ease stu
Jan 1, 2003
-
A Novel Ground Control Program at Plateau Mining Company
By Hamid Maleki
A novel ground control program has been developed at Plateau Mining Company through five years of geotechnical investigations. The study was initiated to determine the causes for roof stability proble
Jan 1, 1987
-
An Analytical Approach For The Estimation Of Pillar Strength
A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co
Jan 1, 1990
-
The Elimination of Rock-fall Fatalities in Ontario Hardrock Mines
By Douglas Morrison
Hardrock mines in Ontario generally operate at between 3,000 and 7,500 ft below surface and generally experience significant rockburst activity below 5,000 ft. Since the introduction of bulk mining te
Jan 1, 2003
-
Investigation And Analyses Of Sudden Outbursts Of Gas During Driving Of Mine Roadways (7ec61323-5f2c-44cc-b7ed-dc20f9515d9b)
By Uros Bajzelj
When driving mine roadways in the vicinity of tectonic disturbances and fault zones, sudden outbursts of gas, along with ejections of fine coal, occur. Substantial dynamic changes occur around the roa
Jan 1, 1992
-
Laboratory and In Situ Results of a Slip Nut Yielding Rock Bolt System
By John D. VandeKraats
Yielding rock bolt systems have been developed to provide ground support while accommodating shifting, creeping, or swelling ground movements. The Dywidag Systems, Inc. (DSI) Slip Nut System is one su
Jan 1, 1998
-
Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine
By Steve P. Signer
Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p
Jan 1, 2001
-
Evaluation of Instrumented Cable and Rebar Bolts as Ground Support at a Trona Mine (958ba3b7-4ed1-4b81-9815-5e4d6ebd9ea2)
By Lewis A. Martin
Instrumented cable bolts developed at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health were used in conjunction with existing ground control systems to moni
Jan 1, 2001
-
Roof Bolting for Long-Term Entries in Underground Coal Mines
By Peter Zhang
As simpler and easier reserves are exploited to depletion, underground coal mining continues in more complex geologic settings and conditions. Roof bolting for long-term entry stability is always a ch
Jan 1, 2011
-
Investigation of Subsidence Over AML: A Case Study
By P. M. Lin
The problem of abandoned mine land (AML) subsidence is getting more severe because abandoned mine lands which used to be located in the remote areas have been gradually developed into suburbs or even
Jan 1, 1987
-
How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)
By A. Wahab Khair
This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance
Jan 1, 1992
-
Effect of the Approaching Longwall Faces on Barrier and Entry Stability
By Klaus-Dieter Beck
RAG American Coal Holding, Inc. affiliates operate two longwall mines in the Pittsburg seam in Pennsylvania, the Cumberland mine and the Emerald mine. A unique situation in longwall operation occurred
Jan 1, 2004
-
Evaluation of the Point Load Strength for Soft Rock Classification
By B. (Mamas) Das
A project to evaluate the suitability of point Load strength tests for testing and classifying coal measure rocks for coal mining application was initiated by Canada Centre for Mineral and Energy Tech
Jan 1, 1984
-
Design And Operation Of Powered And Entry Supports
By Thomas L. Hutchinson
The mechanical design of a roof support is basically a matter of a statics and dynamics problem, assuming of course, that the imposed loads and mining conditions are known. Here in the Appalachian coa
Jan 1, 1981
-
Statistical Regional Calibration Of Subsidence Prediction Models
By D. N. Cleaver
Like other influence function methods, the SWIFT subsidence prediction program, developed within the Mineral Resources Engineering Department at the University of Nottingham, requires calibration to r
Jan 1, 1995