Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    An Alternative for More Productive Rib Bolting in Underground Mining Applications

    By Joe E. Bryan, John P. McDonnell

    "Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib

    Jan 1, 2015

  • SME-ICGCM
    An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the Overburden

    By Guy Reed, Russell Frith, Kent Mctyer

    "Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l

    Jan 1, 2016

  • SME-ICGCM
    Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining

    By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes

    "Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results

    Jan 1, 2010

  • SME-ICGCM
    Mechanism and Prevention Measure of Rib Spalling in 6.5 Meter High Caving Face in Thick Coal Seam with Undulated Floor

    By Weidong Pan, Yinchao Yang, Baodong Zuo

    Fully mechanized mining technology, with a large cutting height in thick coal seam, has been developed to be large-scale, mechanized, and intelligent. Furthermore, it is also superior to other mining

    Jan 1, 2017

  • SME-ICGCM
    Development and Implementation of the “Spin to Stall” Resin Bolting System at Anglo Americans Australian Underground Coal Operations

    By Ismet Canbulat, John Naylor, Jason Emery, Peter Craig, Andy Sykes

    "Longwall mining is by far the most common method of underground coal extraction in Australia. The industry trends and expectations are placing increasing emphasis on the reliability and productivity

    Jan 1, 2015

  • SME-ICGCM
    Time Dependent Mining Induced Subsidence Measured by Differential Interferometric Synthetic Aperture Radar

    By Jessica M. Wempen

    Differential Interferometric Synthetic Aperture Radar (DInSAR), a satellite-based remote sensing technique, has been demonstrated as a potentially practical method for measuring mining induced surface

    Jan 1, 2014

  • SME-ICGCM
    How to Mitigate Coal Mine Bumps Through Understanding of the Violent Failure of Coal Specimens

    By Gamal Rashed

    This research is divided into two parts: the first part of this research focuses on understanding coal mine bump mechanisms, and the second part focuses on mitigating the violent failure associated wi

    Jan 1, 2013

  • SME-ICGCM
    Key Technologies of Integration of Coal Mining–Gangue Washing–Gob Backfilling

    By Wei Yin, Yu Wu, Xiexing Miao

    "For engineering problems of “three under” coal (coal trapped under buildings, waters-bodies and railways) exploitation, environment protection and gangue separation from raw coal underground exist in

    Jan 1, 2015

  • SME-ICGCM
    A Review of the Geomechanics Aspects of a Double Fatality Coal Burst at Austar Colliery in NSW, Australia in April 2014

    By Bruce Hebblewhite, Jim Galvin

    "A coal burst occurred on 15 April, 2014 at the Austar Coal Mine, located west of Newcastle, NSW, Australia. The burst resulted in fatal injuries to two men working as part of the mining crew at the d

    Jan 1, 2016

  • SME-ICGCM
    In Situ Stress For Underground Excavation Design In A Naturally Fractured Rock Mass

    By Andrew J. Hyett

    The ISRM commission on testing methods has recently presented Suggested Methods for rock stress determination (Kim & Franklin, 1987). This proposes that even if the magnitude of in situ stress is not

    Jan 1, 1989

  • SME-ICGCM
    Ground and Standing Support Interaction in Tailgates of Western U.S. Longwall Mines Used in the Development of a Design Methodology Based on the Ground Reaction Curve

    By Dennis Dolinar

    "Tailgate entries in U.S. longwalls can be subjected to high loads and deformations. Therefore, tailgate entries are generally supported with varying types and amounts of standing support. However, ev

    Jan 1, 2010

  • SME-ICGCM
    Floor Heave Control Outby the Seal Line in No. 11 West Kentucky Seam

    By Joel Bradley, Kot Unrug, Kyle Perry, Mark Klimek

    "A West Kentucky mine operation in No. 11 seam, encountered floor heave, due to the localized increase of the thickness in the fireclay mine floor. Floor heave has overridden seals installed in two mi

    Jan 1, 2015

  • SME-ICGCM
    "Void Fill Techniques for Stabilizing Roof Conditions during LongwallShield Recovery"

    By Rusty Mchenry, Craig Dickerson, Robin L. Oldham

    "It has been proven that longwall faces can be moved safely and efficiently. However, abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recentl

    Jan 1, 2015

  • SME-ICGCM
    Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case Study

    By Li Yang, Andre Cezar Zingano, Alberto Fronza

    "Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f

    Jan 1, 2017

  • SME-ICGCM
    Analysis of Alternatives for Using Cable Bolts as Primary Support at Two Low–seam Coal Mines

    By Gabriel S. Esterhuizen

    "Cable bolts are sometimes used in low-seam coal mines to provide support in difficult ground conditions. This paper describes cable bolting solutions at two low-seam coal mines in similar ground cond

    Jan 1, 2015

  • SME-ICGCM
    Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery Optimization

    By David P. Conover, Jake Bain, Christopher M. Ross

    "Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining

    Jan 1, 2017

  • SME-ICGCM
    Worldwide Implementation Of Continuous Miner System - Integrating Ground Control With Technology

    By Thomas W. McClain

    This paper describes the importance of considering ground control measures when importing U.S. continuous mining technology in foreign countries. Important ground control factors are discussed. Eac

    Jan 1, 2001

  • SME-ICGCM
    Longwall Mining Of Thin Seams

    By Ernest A. Curth

    An estimated 49 billion tons or 29 percent, of the coal reserve base to a depth of 1,000 feet in the eastern United States fall in the 28- to 42-inch range. Often left out as a consequence of selectiv

    Jan 1, 1981

  • SME-ICGCM
    Pumpable Roof Supports: Developing Design Criteria by Measurement of the Ground Reaction Curve (8ba91e71-c09d-4bd5-afc0-848b526c152b)

    By Thomas Barczak

    Pumpable roof supports provide an alternative longwall tailgate roof support and have grown in usage during the past few years. Heintzmann Corporation has been installing pumpable roof supports at the

    Jan 1, 2003

  • SME-ICGCM
    Strata Disturbance Prediction For Mining Beneath Surface Water And Waste Impoundments

    By Madan M. Singh

    Mining under bodies of water such as oceans, lakes, rivers, streams, ponds, and other impoundments, is not a new technique. However, in the United States it has been fairly restricted to date. In orde

    Jan 1, 1981