Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Relationship between the Width of Strip Pillar Yield Zone and Recovery Ratio

    By Wenbing Guo

    The stability of strip pillar is the key to successful strip pillar mining. In analyzing the stability of the strip pillar, the width of yield zone must be determined. The determination of the width

    Jan 1, 2006

  • SME-ICGCM
    Some Thoughts on Calibrating LaModel

    By Keith Heasley

    In many practical situation where the LaModel program in used to analyze the mechanical response and failure of the mining environment, there are very few actual field measurement from the site availa

    Jan 1, 2008

  • SME-ICGCM
    The Contributions of the Alpha Foundation to Ground Control Research and Development

    By Tom Barczak, Julian Restrepo, Zach Agioutantis

    "The Alpha Foundation for the Improvement of Mine Safety and Health, Inc. (Foundation) was established as part of a Non-Prosecution Agreement (Agreement) entered in December 2011 by the United States

    Jan 1, 2016

  • SME-ICGCM
    Study on Appropriate Support System and Control Criteria for Main Roadway under Weak Geological Conditions in Indonesia

    By Takashi Sasaoka, Hiroshi Takamoto, Akihiro Hamanaka, Pongpanya Phnthoudeth, Hideki Shimada, Jiro Oya

    "Indonesia is the second largest coal exporter to Japan, accounting for about 30 Mt annually. They produced over 400 Mt in 2015, over 99% of which is from open-cut mines. However, the conditions of su

    Jan 1, 2017

  • SME-ICGCM
    The Origin and History of U.S. Mine Resin

    By Carl Tom Blevins

    Resin was first introduced to U. S. mines in 1971 and first produced in 1973. The original polyester roof bolt resin was very expensive and limited to a single cartridge size and a single slow gel ti

    Jan 1, 2006

  • SME-ICGCM
    Multiple Seam Mining Interactions ? A Case Study

    By Khaled Morsy

    The studied mine extracts the Sewickley seam using room-and-pillar method. The overburden at study site ranges from 400 to 800 ft. Eight years earlier, the Pittsburgh seam was mined 80 ft underneath t

    Jan 1, 2006

  • SME-ICGCM
    Horizontal Stresses and Their Impact on Roof Stability at the Nelms No. 2 Mine

    By J. B. Lizak

    This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.

    Jan 1, 1984

  • SME-ICGCM
    Sublevel Caving Mining Method for Extra-Thick Coal Seams

    By H. Nan

    Using the case of Qianqiu Mine, Yima Coal Mining Administration, theoretical analysis, laboratory physical simulation, and underground observation were performed to study the major parameters for full

    Jan 1, 2006

  • SME-ICGCM
    Transitional Geology and Its Effects on Development and Longwall Mining in Pittsburgh Seam

    By Jun Lu, Mark Van Dyke, Daniel W. H. Su, Greg Hasenfus

    "This paper presents the geologic and ground control challenges that were encountered by CONSOL Energy’s mining operations in southwestern Pennsylvania. A sandstone-to-limestone geology transition was

    Jan 1, 2015

  • SME-ICGCM
    Monitoring Of The Interaction Effects Over A Longwall Panel In The Sydney Coalfield, Nova Scotia

    By Peter Cain

    The Phalen Colliery in the Sydney Coalfield is extracting the 2.6 m thick Phalen Seam by the panel and pillar longwall retreat method. Abandoned workings occur in the Harbour Seam 140 m above and over

    Jan 1, 1993

  • SME-ICGCM
    Extending the Limits of Strata Bolting by the Use of Flexible Strand Rockbolts

    By Dennis R. Barratt

    Rockbolting is now used extensively as a method of primary support in UK coalmines. Over the past fifteen years an optimum bolting system has evolved, based on a high grade steel bolt and a very stro

    Jan 1, 1997

  • SME-ICGCM
    Evaluation Of Polyurethane Injection For Beltway Roof Stabilization In A West Virginia Coal Mine (4376a6c8-d15e-4751-9754-663f60fbf3a4)

    By Gregory Molinda

    Extremely difficult ground conditions were encountered in the main belt entry in a room and pillar mine in West Virginia. Several generations of supplemental support, including cable bolts, cribbing,

    Jan 1, 2004

  • SME-ICGCM
    A Practical Application of Photogrammetry to Performing Rib Characterization Measurements in an Underground Coal Mine Using a DSLR Camera

    By Brent A. Slaker, Khaled M. Mohamed

    "Understanding coal mine rib behavior is important for inferring pillar loading conditions as well as ensuring the safety of miners who are regularly exposed to ribs. Due to the variability in the geo

    Jan 1, 2016

  • SME-ICGCM
    Coal Mine Geology in the U.S. Coal Fields: A State-of-the-Art-Review

    By Frank E. Chase

    During the past quarter century, coal mine geologists have evolved from providing a qualitative description of drill core and coal reserves into quantitative geotechnical specialists who bridge the ga

    Jan 1, 2006

  • SME-ICGCM
    The Science of Empirical Design in Mining Rock Mechanics

    By Christopher Mark

    "Many problems in rock mechanics are limited by our imperfect knowledge of the material properties and failure mechanics of rock masses. Mining problems are somewhat unique, however, in that plenty of

    Jan 1, 2015

  • SME-ICGCM
    Roadway Roof Support Design in Critical Areas at Anglo American Metallurgical Coal's Underground Operations

    By Ismet Canbulat

    "In order to ensure the stability of roadways, Anglo American Metallurgical Coal (AAMC) has developed a roof support design methodology that integrates analytical, numerical and empirical modelling. T

    Jan 1, 2010

  • SME-ICGCM
    Optimal Extraction of Coal from Developed Pillars Locked-Up under Different Surface/Sub-surface Structures

    By Arka Jyoti Das, Prabhat Kumar Mandal

    "Coal mining in India has a strategic importance for the energy security of the country. Presently, the majority of coal production is coming from open-cast mining. Due to the fast depletion of reserv

    Jan 1, 2016

  • SME-ICGCM
    Presented at the 25th International Conference on Ground Control in Mining

    By David Dye

    Good morning, everyone, and thanks Syd for that fine introduction. I am honored to be here to help you celebrate 25 years of advancement and success in the important field of ground control. I wou

    Jan 1, 2007

  • SME-ICGCM
    A Retrospective on LaModel (Or Dr. Heasley?s Wild Ride)

    By Keith Heasley

    This paper is a retrospective on the development, application, and enhancement of the LaModel program from a personal perspective. The narrative starts with an explanation of the objectives behind the

    Jan 1, 2011

  • SME-ICGCM
    3-D Discontinuum Numerical Modeling of Rock Mass Stability Investigations Due to Ore Extraction and Backfilling, and Subsidence Estimation for an Underground Mine

    By Srisharan Shreedharan, Gang Huang, Hongqing Song, Sijing Cai, Pinnaduwa H. S. W. Kulatilake

    "Subsidence prediction due to ore extraction and backfilling during open stoping operations for an underground iron mine in China is reported in this paper. Geologic complexities including faults and

    Jan 1, 2016