Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Monitoring Used as an Alarm System in TunnelingBy M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli
This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th
Jan 1, 2007
-
Thermoanalytical Study On The Oxidation Of Sulfide Minerals At High TemperaturesBy S. E. Pérez-Fontes
An experimental study on the oxidation of chalcopyrite (CuFeS2), pyrite (FeS2), covellite (CuS) and chalcocite (Cu2S) particles was conducted by means of differential scanning calorimetry (DSC) and th
Jan 1, 2007
-
Flambeau And Ridgeway Mines – Lessons LearnedBy F. D. Fox
The Flambeau and Ridgeway Mines, both owned and operated by wholly owned subsidiaries of Kennecott Minerals Company, were located very close to populated areas having initial concerns about health, sa
Jan 1, 2003
-
Toward a Mine-Wide, Real-Time, and Autonomous Geotechnical Change Detection, Monitoring, and Prediction Framework for Underground MinesAdverse ground behavior events, such as convergence and falls of ground, are some of the most significant challenges and hazards in underground mines. Our goal is to work toward mine-wide, digital, an
Jul 28, 2020
-
Barrick’s Gold Production to Increase by 40 PercentBarrick Gold plans to have four new gold mines in production by 2006. Together, the mines would increase the company’s output by 40 percent. The projects include Veladero in Argentina, Alto Chica
Jan 1, 2004
-
Reconnecting The Rogue River To The Channel Migration Zone: An In-Channel Bank Stabilization ProjectBy E. F. Schnitzer, D. R. Haight, G. T. Krogman
The 1997 New Year’s Day Rogue River flood near Medford, Oregon, USA, entered historic channels, eroded a 150-foot-wide buffer, and captured an inactive gravel pond located within the channel migration
Jan 1, 2006
-
On-Line Diagnostic Of Gold Leaching Parameters In A Laboratory Scale Simulation Of A Heap Leach SystemBy M. G. Irish, E. E. Vidal, M. J. Jahraus, P. R. Taylor
An experimental system has been designed to monitor on-line variations of leaching parameters in a closed circuit of cyanide leaching solutions and gold bearing ores. Experiments performed to deter-mi
Jan 1, 2004
-
Plant Design, Practice Conference Attracts Processing SpecialistsBy William R. Yernberg
The Mineral Processing Plant Design, Practice and Control Conference was held from Oct. 20through 24, 2002, at the Fairmont Hotel, Vancouver, British Columbia, Canada. The conference was attended by
Jan 1, 2003
-
Looking for Mr. Good ContractBy Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb
Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac
Jan 1, 2005
-
The risks, challenges and benefits of using social media in the mining industryBy Z. Mullard
The introduction of social media platforms has ushered in a new era of interaction and information exchange, which impact business-to-society relationships. Mining companies are closely watching these
Jan 1, 2011
-
New York Subway Stations And Crossover Caverns—Update On Initial Support DesignBy Charles Stone, Hannes Lagger, Dru Desai
The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car
Jan 1, 2007
-
Feasibility Study on the Modification and Improvement of Flotation Circuits at Enrichment Plant 2 of the Sarcheshmeh Copper Complex Mining, Metallurgy and Exploration (5b85b197-36d7-44cc-879d-d3b823248b9d)By Bijan Taheri, Behrouz Maghsodi, Monireh Heshami, Reza Kohan
A common problem recently encountered with the increase in the rate of input feed at Enrichment Plant 2 of the Sarcheshmeh Copper Complex is the loss of value to the tails, translating to lower recove
-
Medium-Temperature Pressure Leaching Of Copper Concentrates - Part II: Development Of Direct Electrowinning And An Acid-Autogenous ProcessBy J. O. Marsden
Part I in this series of papers considered the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical testing and initial process development f
Jan 1, 2007
-
The Technology And Economic Incentives For Recovering Coal From Tailings ImpoundmentsBy A. S. Murphy, E. V. Manlapig, C. Green, J. W. Parkinson
Historically in Australia and the United States many coal mines deposited raw wash plant fines into large slurry impoundments. At the time the technology and market economics did not exist to make it
Jan 1, 2001
-
Advanced underwater acoustics for unchained operations in deep sea mining - S2C-network solution for underwater communication, geo-referenced navigation / positioning and monitoring purposesBy K. G. Kebkal, R. Bannasch
"Because the operation of tethered underwater vehicles in the deep ocean or under drifting ice areas is very complicated or impossible, the application of autonomous underwater vehicles (AUV) is prefe
Sep 1, 2014
-
Subsidence Monitoring - Case History (0d38711c-ff49-495c-b908-b20ac8ac067d)By Dr. Peter J. Conroy
The current study is part of the U.S. Department of Energy's (DOE) on-going subsidence research program. The long-term objective of the DOE program is to develop analytical methods of subsidence
Jan 1, 1982
-
Design And Development Of A Mobile Mining MachineBy G. L. Dollinger, J. P. Kindsvater, J. A. Gibson
DESIGN AND DEVELOPMENT OF A MOBILE MINING MACHINE INTRODUCTION Until recently, developing tunnels in hard rock has been accomplished either by the drill and blast method or by using large tunnel bo
Jan 1, 1985
-
Design Risk Mitigations for Contract CQ028 of the East Side Access ProjectBy Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Eskay Creek Mine and Mill – A Continuing SuccessBy Garry Biles
The Eskay Creek Mine is a high-grade gold and silver underground mine in northwestern British Columbia. The mine started operations in late1994. For the first three years, ore was crushed to -50 mm(-
Jan 1, 2000
-
San Vicente Pipeline Tunnel?Reach 4W, 3, And 2: Case HistoryBy Michael Jatczak
The San Vicente Tunnel Project is an 11-mile water tunnel constructed for the San Diego County Water Authority. One of the many challenges of the project included tunneling a 22,000-foot single-headin