Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Considerations for Drill and Blast Excavation of a Geologic Repository for the Disposal of High-Level Radioactive Nuclear Waste at Yucca Mountain

    By Norman Kramer, Roger Keller

    The authors would like to thank Austin Powder Company for their technical support and input, specifically Stephen Harris, Jason Ryan, and John Capers of Austin Powder, without whose support this paper

    Jan 1, 2000

  • ISEE
    Blasting at the Silver Cliff Tunnel Approaches Near Two Harbors, MN

    By John Turner, James Lamb

    The Minnesota Department of Transportation (MNDOT) has an extensive project to improve driving conditions and reduce hazards to motorists on US Highway 61 between Duluth, MN, and Canada along the nort

    Jan 1, 1994

  • ISEE
    The Effect of Rock Strength on Perimiter Blasting and the "Blastibility" of Massive Rock

    By Qingshou Chen, Paul N. Worsey

    It has been recently argued that rock strength has little effect on the final results of pre-split blasting and is of only minor importance when blasting rock in general. However, it can be shown that

    Jan 1, 1986

  • ISEE
    Blasting-Induced Damage in Coal

    By Kaby K. Kabongo

    The paper is drawn from a project intended to explore a technique of prediction, control and optimization of fracture in coal induced by blasting. It evaluates the fines generated in coal submitted to

    Jan 1, 1995

  • ISEE
    Blasting Cost Minimization at Duvha Opencast

    By S A. Steyn, I P. Douglas

    Duvha Opencast is a large South African dragline operation supplying coal to the Duvha Power Station which is operated by Eskom, the state power utility. For Duvha to remain competitive with other col

    Jan 1, 1991

  • ISEE
    Progressive Cavity Pump Safety Improvement

    By Alfred Osborne

    Progressive cavity type pumps are widely used by commercial explosive manufacturers for pumping water gel, emulsion and emulsion / ANFO blend explosives. Tests by explosives companies and investigatio

    Jan 1, 2002

  • ISEE
    Finite Element Simulation of Time-Dependent Fracture and Fragmentation Processes in Rock Blasting

    By M Oldenburg, P J. Digby, L Nilsson

    A constitutive model for the simulation of fracture and fragmentation processes in rapidly loaded rocks is studied. The model was included in a wave propagation finite element code. The results obtain

    Jan 1, 1985

  • ISEE
    Effect of Water on ANFO/Emulsion Blends in Surface Mine Blasting

    By Stuart Brashear, Lee Schettler

    "The effect of water on several ANFO/emulsion blend ratios is documented by both physicalobservations and analytical testing to demonstrate the effect even small quantities of water canhave on water r

    Jan 1, 1996

  • ISEE
    Tunneling from an Underground Limestone Mine to the Surface

    By John A. Huber

    At an underground limestone mine in the Central United States; there were plans for the installation of a limestone processing plant. The special design and layout of the plant called for the installa

    Jan 1, 1995

  • ISEE
    Three Laboratory Tests for Explosive Ruggedness

    By Michael Wieland

    Three laboratory tests were developed for rating the wave-impact ruggedness of cap-sensitive explosives that are used for blasting in underground coal mines. Destructible pipe fixtures, called simulat

    Jan 1, 1996

  • ISEE
    A New Detonating Cord for Reducing Unwanted Damage in Controlled Blasting

    By Thomas Bakley, Rob Lee, Jay Rodgers

    The present state of technology in Controlled Blasting uses standard explosives’ products to create a crack between holes along a desired line of break. The resulting pre-split, post-shear or cut line

    Jan 1, 2001

  • ISEE
    Blast Vibration Monitoring Instrumentation at Noranda Minerals

    By David Sprott

    The effect that underground blasting has on the stability of hangingwalls, pillars and other rock structures is an inherent part of Noranda's geomechanics and mine design program to improve mine safet

    Jan 1, 1988

  • ISEE
    Product Security Developments

    By John Watson

    Overview: Intro and Product Use Trends ?? Packaged Explosives ?? Bulk Explosives ?? Initiation Systems – Conventional Initiation Systems – Electronic Detonators ??Q&A

    Jan 1, 2006

  • ISEE
    Influence of delay time accuracy on the fracture process in smooth blasting

    By Yoshiharu Tanaka, Keita Morooka, Masaaki Yamamoto, Katsuhiko Kaneko

    Smooth blasting is the standard method for underground rock excavation, to reduce over break and remaining rock damage. We already utilized the high accuracy of the electronic delay detonator to inves

    Jan 1, 1998

  • ISEE
    The Evaluation of Electronic Detonators at Martha Mine, New Zealand

    By Blair Jackson, Tjaart Louw

    Martha Mine, owned by Newmont Mining, Australia appointed Macmahon Contractors (NZ) Ltd as the mining contractor to drill, blast, and crush and convey ore for processing, followed by construction of a

    Jan 1, 2003

  • ISEE
    Supression of Blast Pressure and Noise from Implosive Type Connectors (b7d7fd43-f48c-43a3-af6c-8966c9e70d51)

    By Ettore Contestabile, Cameron Thomas

    Implosive-type electrical/mechanical connectors such as XECONEX have been used extensively for joining electrical transmission lines. This implosive action of explosives has also been applied to other

    Jan 1, 1995

  • ISEE
    Delay Timing and Vibration Characteristics at Low-Frequency Mine Sites

    By D E. Siskind

    The Bureau of Mines performed a comparative study of nine sites at eight surface coal mines to determine if the presence of near-surfaced underground abandoned workings resulted in the generation of a

    Jan 1, 1990

  • ISEE
    Blast Vibration Measurements at Far Distances and Design Influences on Ground Vibrations

    By Kenneth Eltschlager, Steven V. Crum, David E. Siskind

    The Bureau of Mines was funded by the Office of Surface Mining (OSM) to determine how blast vibrations from a local surface coal mine were affecting homes in the towns of Daylight and McCutchanville,

    Jan 1, 1992

  • ISEE
    Cost Effective Loading of Large Diameter Pre-Split Holes

    By LaRay Collyer

    San Juan Mine began pre-splitting the highwall prior to cast blasting in August 1986. The first pre-split shot used six inch PVC (polyvinylcloride) pipe inside a 10 5/8 inch hole, drilled at a 74 degr

    Jan 1, 1990

  • ISEE
    Effects of Blasting Vibrations on Uncured Concrete Foundations

    By Thomas A. Simpson, Yung-Kwaun Jow, Dennis L. Gamble

    Construction of the $200 million Riverchase Galleria Mall in Hoover, Alabama was started in early 1984. The construction area consists of about 70 acres. The extensive building complex requires heavy

    Jan 1, 1985