Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Functional Performance of Ball Milling

    By K. Wood, R. McIvor, P. Blythe, M. Lavallee

    A new analytical approach for characterizing and improving the performance of ball milling is presented. Individual ball mill circuit design and operating variables can be related to overall circuit p

    Jan 1, 1990

  • CIM
    25 Years of Collector Development for Sulphide Mineral Flotation

    By B. S. Fee, R. R. Klimpel

    "Froth flotation is the most widely used and economic means of concentrating metal sulfide ores such as those containing copper, lead, zinc, nickel, molybdenum, and pyrite. Also recoverable are other

    Jan 1, 1987

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014

  • CIM
    A review of binder materials used in stabilized backfills

    By J Petrolito

    "To improve the economic and environmental performance of underground mining operations, it is common practice to return the metallurgical waste material underground as backfill. This is called hydrau

    Jan 1, 2005

  • CIM
    Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory Studies

    By Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn

    "The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven

    Jan 1, 2000

  • CIM
    Establishing the process mineralogy of gold ores

    By B. Jago

    From the perspective of metallurgical processing, gold ores can be classified into freemilling and refractory ores. Their extractive metallurgy is largely driven by mineralogical factors such as gold

    Jan 1, 2006

  • CIM
    Recycling of Rare Earth Magnet using Molten Fluoride

    By H. Zhu, Y. Sato, O. Takeda, K. Nakano

    Recycling of rare earth magnet wastes is essential to insure the stable supply of rare earth resources. For the development of a novel recycling process, the removal of rare earth oxide from an off-sp

    Jan 1, 2014

  • CIM
    Column Flotation Applied to the Production of Phosphate Rock in Araxa-MG, Brazil

    By Antônio Peres, Rogério Guimaraes, Lauro Takata, Harold Wyslouzil

    "Serrana’s concentrator, in Araxii, has capacity of producing approximately 800,000 tomes of phosphate rock per year, with a P205 grade of 36%, from ores grading between 13% and 14% P205. The annual m

    Jan 1, 1999

  • CIM
    Use of Functional Performance Models to Increase Plant Grinding Efficiency

    By O. M. Arafat, J. A. Finch

    "The Functional Performance Equation calculated from a plant grinding survey defines two distinct ball mill circuit efficiencies and how they relate to total production rate through the target grind s

    Jan 1, 2017

  • CIM
    Condition Monitoring and Basic Maintenance?. One Without the Other?

    ? Founded In 1953 ? Mining growth of 83% since 2007 ? We produced over 1 million ounces of Au in 2012 ? We Forecast of 20% Au production in 2013-2015 ? We have paid a dividend 31 years consecuti

    Aug 1, 2013

  • CIM
    Effects of the Type of Water on the Selective Flotation of Pyrochlore from Niobec

    By E. Esponosa-Gomez, J. A. Finch, A. R. Laplante

    "Water quality plays an important role in oxide flotation. The effects on selective flotation of fine (1-16 um) pyrochlore of two types of water used at the Niobec concentrator, potable and plant recy

    Jan 1, 1986

  • CIM
    Shaft collaring through deep overburden -a novel approach

    By Jack J. Ayotte, Michael R. Nadon

    "Today's demand for better and more efficient methods inspires new approaches to construction and mine development.A project at Asarco's Aquarius Mine provided a challenge that resulted in t

    Jan 1, 1987

  • CIM
    Improvements in Column Flotation Through the Use of Microcel™ Spargers at Antamina

    By David Estrella, Hector M. Lizama, Jhonny Carrión

    "Microcel™ sparging systems were installed on one column of the molybdenum cleaner circuit and one column of the copper first cleaner circuit at Antamina. The Microcel™ system is known to generate fin

    Jan 1, 2008

  • CIM
    Mining Project Management: Think Second Order!

    By Emmanuel Henry

    Few industries are more challenged by technical, political and market uncertainty than the mineral industry. Technical uncertainty in mining projects concerns the volume and quality of the resource, t

    May 1, 2003

  • CIM
    Improvement of Mass and Value Balance data from the Statistical Benchmark Model

    By Cecilia Arrue, Dominic Fragomeni, N. O. Lotter

    "A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati

    Jan 1, 2007

  • CIM
    Design Spans ? Underhand Cut and Fill Mining

    By Rimas Pakalnis

    This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r

    Apr 1, 2005

  • CIM
    Ore Thawer at Pine Point

    By R. J. Johnston

    "INTRODUCTIONPoint Mines is located about 65 miles east of Hay River on the South Shore of the Great Slave Lake. It is connected to the Northern Alberta Railway System by the Great Slave Lake Division

    Jan 1, 1972

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003

  • CIM
    Geometallurgical Modeling - The New Approach to Plant Design and Production Forecasting/Planning, and Mine/Mill Optimization

    By Dave Bulled, Chris Bennett, Glenn Kosick, Glenn Dobby

    "Mining companies around the world are embracing geometallurgical modeling at a rapid rate, as senior executives realize that inputs must be properly measured if the output is to be managed effectivel

    Jan 1, 2004

  • CIM
    Pebble Grinding At Bethlehem Copper Corporation

    By E. A. Lowe, J. W. Smith, C. W. Overton

    "The operations of Bethlehem Copper are situated in the south-central interior of British Columbia at an elevation of 4900 feet above sea level. Main road and rail transportation systems pass through

    Jan 1, 1975