Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Impact of air distribution profile on banks in a Zn cleaning circuit

    By R. Dahlke, J. A. Finch

    A campaign was undertaken during the greater part of 2001 at Noranda’s Brunswick mine concentrator to investigate the role of gas (air) superficial rate (Jg) distribution to the cells in the final Zn

    Jan 1, 2004

  • CIM
    Challenges in Niobium Flotation

    By S. Kelebek, C. Gibson, M. Aghamirian

    "Global niobium production is currently dominated by three operating mines, Araxá and Catalão in Brazil, and Niobec in Canada. Although over 90% of the world’s niobium is mined and processed in Brazil

    Jan 1, 2015

  • CIM
    Case Study of Thickened Tailings at Goldcorp’s Musselwhite Mine in Northern Ontario

    By Jérôme Girard, Shiu Kam, Sue Longo

    "Historically, tailings management in a northern climate has involved the deposition of tailings into the Tailings Management Area (TMA) as conventional slurry. This type of system is obviously viable

    Jan 1, 2011

  • CIM
    Recovery of Lanthanides from Apatite Phosphogypsum

    By Cz. Mora, A. Pawelczyk, D. Hreniak, P. Nowak, A. Dyonizy, S. Strek, W. Strek, K. Grabas, A. Ostrowski

    Globalization and a growing demand for limited raw material resources have forced changes in the approach to the supply chain. This is particularly true in the case of rare earths, which are regarded

    Jan 1, 2014

  • CIM
    Numerical Modelling of a Brazilian Disc Test of Layered Rocks using the Combined Finite-Discrete Element Method

    By O. K. Mahabadi

    The scope of this study is to simulate the behaviour of a layered rock sample under standard laboratory Brazilian Disc test using an innovative combined finite-discrete element method (FEM/DEM) resear

    May 1, 2009

  • CIM
    Effect of Acid Laden Mining Effluent on Characterization and Physio-Chemical Behaviour of Clayey and Sandy Soil

    By V. Murugaiyan

    The Geotechnical Engineer is faced to view problems emerging from the task of protecting the environment and also the problems related to prevention of natural hazarders. Geo-Environmental Engineering

    May 1, 2004

  • CIM
    Fine Grinding, a Refresher

    By A. G. Doll

    "Many power-based grinding models exist, and most operators are familiar with Fred Bond's ""third theory"". Bond's model is most commonly used to describe primary and secondary grinding to product siz

    Jan 1, 2017

  • CIM
    Erosion/Corrosion Effects on the Design and Maintenance of a Potash Refinery

    By J. Davis, M. G. Reading

    "INTRODUCTIONInternational Minerals and Chemical Corporation (Canada) Limited operates two potash mine/refinery complexes near Esterhazy, Saskatchewan. Annual production of approximately 4.2 million t

    Jan 1, 1983

  • CIM
    The Pinehouse Limestone Project

    By Doug Smith, Gary Taylor, Paul Ogryzlo

    "Uranium mining and processing typically requires large quantities of high-grade reactive quicklime for the neutralization and clean-up of contaminated mine water and mill process waste streams. Curre

    Jan 1, 2003

  • CIM
    Particle Composition Distribution: Measurement and Prediction in Mineral Processing

    By G. Barbery

    "Particle composition distribution is an essential feature of materials processed by physical separation methods. The amenability to segregate a feed material in a concentrate and a tailings stream de

    Jan 1, 1986

  • CIM
    Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam

    By Vincent Roy

    Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management

    Aug 1, 2013

  • CIM
    The Effect of Shotcrete on the Flotation Nickel Recoveries of Falconbridge Nickel-Copper Ore

    By Peter Wells, Laxman M. Amaratuga, Todd M. Kanhai

    "Certain mining methods (eg. Cut-and-fill) result in the contamination of run-of-mine ore with shotcrete. This shotcrete remains mixed with the ore throughout processing. Experimentation performed by

    Jan 1, 2000

  • CIM
    Brunswick Mine SAG Mill Liner Design and Wear

    By Chris Larsen, Ian Orford, Marilene Renaud, Mike Cooper, Lud Strah

    "An AG/SAG mill was commissioned at the Brunswick Mine concentrator in October 1998. This paper discusses the original liner design for the bi-directional AG/SAG mill, observed liner wear, subsequent

    Jan 1, 2003

  • CIM
    Chapter 12. Determination and Payment

    By Karl J. C. Harries

    "12.1. NO DEPRECIATION/GAAPAll calculations and computations relating to the Royalty shall be carried out in accordance with generally accepted accounting principles consistently applied to the extent

    Jan 1, 2003

  • CIM
    An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, Manitoba

    By Matthew Violot

    Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened

    Nov 1, 2011

  • CIM
    Assessment of Material Diggability for Shovel Excavation in Oil Sands

    By Sibabrata Patnayak

    A major problem during shovel excavation in oil sand mining is the variability of material diggability resulting in varying mechanical energy input, cycle time, energy consumption, wear, and stress lo

    Apr 1, 2005

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014

  • CIM
    Recycling of Rare Earth Magnet using Molten Fluoride

    By H. Zhu, Y. Sato, O. Takeda, K. Nakano

    Recycling of rare earth magnet wastes is essential to insure the stable supply of rare earth resources. For the development of a novel recycling process, the removal of rare earth oxide from an off-sp

    Jan 1, 2014

  • CIM
    What are the Opportunities and Challenges for Women in Fly-in-fly-out (FIFO) Mining in Canada? An Exploratory Study

    By Costa

    The fly-in-fly-out (FIFO) mining model has significant implications for the industry as it plays an important role in fulfilling the economic, social and workforce needs of the contemporary mining ind

    May 1, 2006

  • CIM
    Use of Functional Performance Models to Increase Plant Grinding Efficiency

    By O. M. Arafat, J. A. Finch

    "The Functional Performance Equation calculated from a plant grinding survey defines two distinct ball mill circuit efficiencies and how they relate to total production rate through the target grind s

    Jan 1, 2017