Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Numerical Modeling of Mining-Induced Stress and Microseismic Response using FLAC3D

    By Shahé Shnorhokian

    A study was conducted on the seismic activities and associated rockburst events that took place at an underground Canadian metal mine over a period of five years. In the first stage, a back analysis o

    May 1, 2011

  • CIM
    Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation

    By Niklas Frank

    Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau

    May 1, 2003

  • CIM
    Automating Delay Reporting to Deliver Effective Maintenance

    By Shaun Booth

    Automating Delay Reporting to Deliver Effective Maintenance Corporate Background: Technology Company: Matrikon Inc. Global software and service provider of Information Technology and Control Solut

    May 1, 2003

  • CIM
    Experience with a Lamella Thickener at the Beaverlodge Operation of Eldorado Nuclear Limited

    By R. Bruce Ferguson

    "IntroductionThe Beaverlodge Operation of Eldorado Nuclear Limited is a uranium property located near the north shore of Lake Athabasca about 7 miles from Uranium City, Saskatchewan.The mill is a 2000

    Jan 1, 1975

  • CIM
    Flotation of Different Particle Sizes as a Function of Bubble Surface Area Flux

    By K. Honkivaara, S. Junnikkala, J. Aho, K. Föhr, P. Lampinen

    "Bubble area flux has been claimed to be a major tool to dimension flotation equipment. The paper describes laboratory scale (batch and 301 continuous cell using plant feed) and small-scale (1 ,8m3) i

    Jan 1, 2000

  • CIM
    Bench-scale simulation of flotation plant performance

    By Stratton-Crawley R., G. E. Agar

    "A study has been done of the scale-up of laboratory bench-scale flotation to continuous plant circuit performance. It was found that the impellor speed and the air flow rate influenced the results an

    Jan 1, 1982

  • CIM
    The Recovery of Rare Earths, Uranium and Pyrite from Pele Mountain’s Proposed Eco Ridge Mine Project

    By Roger Payne, John R. Goode, Feng Gao, James Brown

    The Eco Ridge deposit is located in the Elliot Lake mining camp in Northern Ontario, Canada. Between 1955 and 1996, the area produced more than 138,000 t (300 million pounds) of U3O8 and very signific

    Jan 1, 2014

  • CIM
    Environmental and Financial Savings for Belt Conveyors by Using Paramid as Reinforcing Material.

    By Heidi Beers

    Teijin Limited ? Global technology-driven group operating in six main fields Advanced fibers and composites business group Healthcare business group Trading and retail business group IT business

    Aug 1, 2013

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013

  • CIM
    Pressure Filtration at Falconbridge Limited Strathcona Concentrator

    By J. F. Jackson, R. W. Mau

    "The first commercial installation in the mineral industry of the ""Verti-Press"" pressure filter was made by Falconbridge Limited at the Strathcona Concentrator to filter copper concentrate. The filt

    Jan 1, 1990

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis

    A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th

    Jan 1, 2004

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis, B. Sambirsky, J. Werner

    A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh

    Jan 1, 2004

  • CIM
    Calibration of On-Stream X-Ray Analyzers

    By Jim Lauder, Russ Calow, Ken Maley, Michael Ounpuu, Stuart T. Caverly

    "Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Concession Street, Lakefield, Ont

    Jan 1, 1996

  • CIM
    Setting the Record Straight

    By Don Thompson

    It isn?t a lie if you don?t tell the whole truth The pictures National Geographic didn?t print Other photos National Geographic didn?t print?

    May 1, 2009

  • CIM
    The Ecstall Story: The Ecstall Concentrator

    By Michael P. Amsden

    "THE ECSTALL CONCENTRATOR is situated adjacent to Highway 101 and the Ontario Northland Railroad, 15 miles east of Timmins, Ontario. Ore is delivered to the concentrator by rail from the mine, which i

    Jan 1, 1974

  • CIM
    The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone Ground

    By Pierre Rocque

    The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce

    Oct 1, 2001

  • CIM
    Navigating Change for Success

    By Julie Dénommé

    Today few in business would argue with the idea that we are living in a world that is Volatile, Uncertain, Complex, and Ambiguous. Coined VUCA by the US Army War College, these four words define the ?

    Oct 1, 2010

  • CIM
    Comparision of Two Sizes of FSFs in the Glogów Copper Smelter

    By L. Garycki, P. Poks, R. Urbaniak, T. Gabka

    In 2016 at Głogów Copper Smelter KGHM Polska Miedź S.A., after shutting down the shaft furnaces new FSF was launched. Currently, it is the only smelter with two direct to blister flash smelting furnac

    Jan 1, 2019

  • CIM
    Geology and Chemistry of the Low Ti Magnetite-bearing Heff Cu-Au Skarn and its Associated Plutonic Rocks, Heffley Lake, South-Central British Columbia

    By I. C. L. Webster, G. E. Ray

    "The magnetite-rich Heff Cu-Au skarn lies in the Quesnel Terrane of south-central British Columbia, approximately 26 km northeast of Kamloops. The skarn formed close to the northern margin of the Heff

    Jan 1, 2007

  • CIM
    Outotec’s Fully Automated Smelter 2020 – The Vision, the Status and the Future

    By Joey Hoang, Robert Johansson, Tapani Keronen, Mikael Jåfs, Jani Jansson, Mikko Korpi

    At the Copper 2016 conference in Kobe, Japan, Outotec introduced a vision for the year 2020, wherein smelting would make use of four digital cornerstones: intelligent instruments, advanced process con

    Jan 1, 2019