Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stochastic Optimization in Mine Design and Production Scheduling: Methods, applications and value

    By Roussos Dimitrakopoulos

    Overview ?Uncertainty matters: The economic side ?Models of geological uncertainly ?Shifting the paradigm: Stochastic mine planning ?Using uncertainty to improve project performance ?Conclusion

    Oct 1, 2010

  • CIM
    A New Era in Pressure Hydrometallurgy

    By Fathi Habashi

    A new era in pressure hydrometallurgy is marked when the roasting - leaching - electrowinning process in the zinc industry was replaced by direct pressure leaching of zinc concentrate. Since then, the

    Jan 1, 2014

  • CIM
    The Key Tuffite, Matagami mining district: Origin of the tuff components and mass changes (568c7be9-97ae-4fc3-a50f-c9dd9f0ac7aa)

    By W. H. MacLean, S. Liaghat

    The Key Tuffite is a thick (0.3 m to 6 m) and laterally extensive (-10 km) cherty, sulfide-bearing tuff unit in Archean greenstones in the Matagami mining district in northwestern Quebec. It lies at t

    Jan 1, 1992

  • CIM
    Industrial relations

    By Riggin P. R.

    "IntroductionIndustrial Relations combines two very important relationships - employee relations and union relations.Employee relations always come into play when people are hired to perform tasks. Be

    Jan 1, 1989

  • CIM
    Study into the Feasibility of Basic Modernization of a Copper Smelter using the Roasting-Smelting Flow Diagram for Treatment of Sulphide Feed Materials

    By A. V. Tarasov

    There are still a number of copper smelters in the world using the roasting and smelting process flow diagram for treating sulphide raw materials. The technical, economic and environmental performance

    Jan 1, 2007

  • CIM
    Design of SO2/O2 Cyanide Destruction Circuits: The Critical Factors and Challenges

    By N. Katsikaros, N. S. ‘ Yap, B. Adaszynski

    "Cyanide is a well proven, effective lixiviant that has been utilised for centuries in gold extraction processes. Despite being used in close to 90% of gold processing plants, cyanide leaching is stil

    Jan 1, 2016

  • CIM
    Applied Environmental Forensic Science: Brazilian Illegal Mining Cases

    By Rodrigo Craig Cerello

    The Brazilian economy has always presented a strong correlation with the mineral activity. Since colonization days, due to the territorial expansion caused by the explorers search for gold, mining in

    Aug 1, 2013

  • CIM
    Gas Dispersion Management In A Copper I Molybdenum Separation Circuit

    The effect of superficial gas rate distribution (Jg profile) on down-the-bank metallurgical response was tested in the rougher-scavenger bank (eight 10-m3 tank cells, 4 roughers and 4 scavengers) at H

    Jan 1, 2007

  • CIM
    Zeron 100 for Downstream Processing in Acid Leach Mining

    By Roger Francis

    There is increasing use of acid leach extraction methods at elevated temperatures and pressures by the mining industry. In many locations there are limited supplies of fresh water, and waters with hig

    Jan 1, 2010

  • CIM
    The Implications of Planning and Scheduling by CPM

    By Jack G. Hazan

    The Critical Path Method is the modern scientific answer for solving the planning and scheduling problems inherent in today's complex projects. With this method, nothing is left to chance. All re

    Jan 1, 1965

  • CIM
    Inhibiting acid mine drainage throughout the mine life cycle

    By David A. Orava, Richard C. Swider

    "The technical knowledge and practical experience accumulated by industry and others in abating acid mine drainage (AMD) is being proactively applied at every phase of the mine life cycle. This paper

    Jan 1, 1996

  • CIM
    The Effect of Microstructure on Hot Compression Deformation Behavior of an Al-3.8cu-1.8Li Alloy

    By Liang Zhen, Jian-Tang Jiang, Guo-Ai Li, Xiao-Ya Wang

    "Deformation behavior of 2A97 aluminum alloy containing coarse secondary phases was studied using uniaxial hot compression (HC, 340–490°C, 0.4001–1 s-1). The flow stress could be described by a Zener-

    Jan 1, 2018

  • CIM
    Airflows through Openings of Smelter Buildings Exposed To Crosswinds

    By E. Dernedde

    Cell rooms of aluminium smelters have large openings in the sidewalls and in the roof. These openings provide a high ventilation rate, which removes heat and contaminants emitted by the reduction cell

    Jan 1, 2007

  • CIM
    Monitoring Surface Roughness of Copper Electrodeposits Using Scaling Analysis

    By J. Keough

    During industrial electrowinning of copper, uneven growth can impact current efficiency, cause short-circuits in the cell and negatively impact the final quality of the metal product. Copper electrode

    Jan 1, 2019

  • CIM
    Polymer Cable Carriers: A Reliable Cable Management & Protection Solution for the Mining Industry

    Carrying Energy ?Energy ?Power, data, signal, hydraulics, pneumatics? ?Needs to be conveyed from a stationary point to a system in motion ?Cable Carriers (steel and plastic), Festoon Systems,

    Nov 1, 2011

  • CIM
    Phase Equilibria Studies to Support the Technology Development for the Recycling of Lithium Ion Batteries

    By E. Haccuria

    Due to the growing share of electrical cars, the use of lithium ion batteries significantly increased. Recycling of these batteries is essential to safely dispose hazardous materials as well as to rec

    Jan 1, 2014

  • CIM
    Gold Mineralization in Archean Banded Iron Formation, Third Portage Lake Area, Northwest Territories, Canada (407bbb63-2364-4223-b699-c887fb23f7b7)

    By R. S. James, S. P. Goff, A. E. Armitage

    "Oxide-facies banded iron formation in the Third Portage Lake area is hosted by ultramafic and calc-alkaline volcanic rocks and related sedimentary rocks of the Archean (2.8 Ga) Woodburn Lake Group, 8

    Jan 1, 1996

  • CIM
    Towards a Practical Stope Reconciliation Process in Large-Scale Bulk Underground Stoping Operations, Olympic Dam, South Australia

    "This paper deals with the reconciliation of open stope performance at Olympic Dam, South Australia, with a focus on stope stability, recovery, and operational aspects of stope reconciliation in relat

    Jan 1, 2015

  • CIM
    Using the discrete-element method to investigate ball milling power draw, load behaviour, and impact energy profile

    By M. B. Kime

    "Discrete-element method (DEM) modelling is a powerful tool for studying particulate systems within the mineral processing industry. DEM simulations were conducted to investigate the power draw, load

    Jan 1, 2017

  • CIM
    Deep hardrock mining — the future

    By D. M. Morrison

    "The most important factor in Canadian mining is not the operating cost of current projects but the availability of capital for future projects. The future of mining at depth will be producing ore fro

    Jan 1, 1996