Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Engineering and Construction Of Plant and Wharf Facilities

    By F. S. Thurner

    "This paper describes the engineering and construction activities of the ""design-build"" project awarded to the joint venture of Foundation-Comstock-Janin for the construction of the plant and wharf

    Jan 1, 1976

  • CIM
    An up and Downscaling Scheme for Multi-Scale Poroelastic Simulation in Laterally Drained, Layered Formations

    By J. Ita, F. Malekzadeh

    "Multi-scale simulation in coupled fluid flow- geomechanical systems is a computationally efficient method for numerically solving large poroelastic systems. When using multi-scale methods, care must

    Jan 1, 2015

  • CIM
    Crack in Corrosion (CIC) Failure in APL-5l X 52 Thin-Walled Linepipe

    By D. Cronin, A. Plumtree, A. Hosseini

    "Crack in corrosion (CIC) linepipe defects are hybrid defects not directly addressed by existing assessment methods. To investigate the collapse pressure of these defects, CIC defects were formed in 5

    Jan 1, 2012

  • CIM
    Advances in Continuous Monitoring of Water-Cooled Tapblocks for Pyrometallurgical Furnaces

    By D. Krippner, C. Nexhip, D. George-Kennedy, P. Gebski, R. Kaur, W. L. Ying

    ABSTRACT Water-Cooled Tapblocks Are Essential Components Of Modern Smelting Furnaces. Uninterrupted Operation Of A Tapblock Is Critical For The Optimal Operation Of A Furnace. This Critical Function,

    Jan 1, 2013

  • CIM
    A Novel Method for Dewatering of Iron Ore Tailings Based on Separation of Fine and Coarse Fractions

    By M. Saghaeian, R. Hejazi, Fakoor Sanat Tehran Company, H. Abedini, M. Zare

    "Dewatering of final tailings is one the biggest issues in iron ore processing plants. Because of the fine and hydrophilic particles in the iron ore tailings, dewatering of such material is difficult

    Jan 1, 2016

  • CIM
    Geological Setting and Characteristics of the Red Chris Porphyry Copper-gold Deposit, Northwestern British Columbia (ca399b4d-6ba4-48c8-871a-229dc866c010)

    By C. H. Ash

    "The Red Chris Cu-Au deposit (522.7 Mt at 0.35% Cu and 0.27 g/t Au), northwestern British Columbia, is one of several pre-accretionary porphyry systems in the Cordillera of westernCanada. It is hosted

    Jan 1, 1997

  • CIM
    A Variable Parameter-Based Creep Damage Model for Rock Salt Considering the Effect of Loading Frequency

    By Ning Zhang, Yan Chen, Qikang Yi, Linjian Ma, Guoan Wang

    Laboratory tests were performed to explore the effects of frequency on the deformation property of rock salt subjected to cyclic loading under confining stress condition. A two-stage (transient and st

    Jan 1, 2015

  • CIM
    Safety Protocols for Campbell Mine Autoclave Shutdowns

    By M. Timmins

    Campbell Mine operates a 100 tpd gold autoclave that treats sulphide concentrates at 305 psi and 200 °C. Autoclave feed consists of fresh pretreated concentrate, an acidic oxide slurry recycle as well

    Jan 1, 2004

  • CIM
    Quantitative Estimation of Minerals in Iron Ores Using Chemical Assays and Thermo-Gravimetry Analysis Data

    By Dharmendr Kumar, Pradip, Sivakumar Subramanian, Beena Rai, Venugopal Tammishetti

    The separation efficiency in a mineral processing plant is generally assessed and reported in terms of elemental assays constituting the minerals of interest. However, different minerals comprising of

    Jan 1, 2016

  • CIM
    Network Communication Note to Assist Backhoe Operators and Dump Truck Drivers for Earthwork

    By Katsutoshi Saibara

    Network communication note is a cloud system for an earthwork project. It enables backhoe operators and dump truck drivers to monitor their own works in progress currently and performed up to the pres

    Aug 1, 2013

  • CIM
    A Visual Sensing Approach to Estimate Material Hauling Cycles in Heavy Construction and Surface Mining Jobsites

    By E. Rezazadeh Azar

    Dump trucks are the main mean for hauling earth material within and outside of the construction and open-pit mining jobsites. The real-time monitoring of the material transportation trips is beneficia

    Aug 1, 2013

  • CIM
    Real Time Safety Risk Analysis of Construction Projects Using BIM and RTLS

    By S. Setayeshgar

    The identification of potential accidents on construction sites has been a major concern in the construction industry and it needs a proactive safety plan to reduce the risk of accidents. There are no

    Aug 1, 2013

  • CIM
    Study on the Uniaxial Compressive Strength of Rail Transit Passing Through area in Chongqing

    By Yong-neng Feng, Xiao-ping Chen, Wei Guo

    "While the uniaxial compressive strength of rock has been extensively investigated, the relation between the saturation and natural compressive strength is relatively unexplored. This paper studies on

    Jan 1, 2015

  • CIM
    Thermal Plasma Torches for Metallurgical Applications

    By L. Rao, P. Carabin

    "Advances in thermal plasma torches have resulted in this technology becoming a commercially viable solution for chemical and metallurgical processes. The main advantages of plasma are its ability to

    Jan 1, 2012

  • CIM
    The Coefficient F is the Quantitative Characteristic of the Activating or Inhibiting Properties of Inorganic Oxidizing Agent of the Type Meox Z (Chromate, Vanadate, Tungstate, Molybdate, Pertechentates, Nitrite and Peroxide Compounds)

    By M. Reda

    Inorganic oxidizing agents of the type MeOx-z such as Chromate, Vanadate, Tungstate, and Molybdate... etc. are widely used as corrosion inhibitor. In non acidic solution these oxidizing agent are redu

    Jan 1, 2010

  • CIM
    The Adsorption of Dehydroabietylamine Acetate on Mineral Oxides

    By G. W. Smith

    "The adsorption of dehydroabietylamine acetate on quartz, hematite, rutile and baddeleyite has been deter-mined for concentrations ranging from 0.3 to 5,600 µ. moles/I and for pH values ranging from 2

    Jan 1, 1971

  • CIM
    Uranium deposits and prospects of the Baker Lake Basin and subbasins Central District of Keewatin, Northwest Territories

    By A. R. Miller, R. A. Stanton, M. J. Male, G. R. Cluff

    "The Dubawnt Group consists of continental sedimentary and volcanic rocks which fill structural depressions - Baker Lake Basin, Yathkyed Lake and Angikuni Lake subbasins- whose evolution was controlle

    Jan 1, 1986

  • CIM
    Process Mineralogy of Copper and Lead Concentrates: Uncertainties and Metallurgical Decisions

    By Mostafa Benzaazoua, Emilie Ré, Raphaël Mermillod-Blondin, Hassan Bouzahzah, Jean-François Wilhelmy, University of Québec in Abitibi-Témiscamingue

    "We analyzed two copper and lead flotation concentrates from the LaRonde mill using MLA technology (Mineral Liberation Analyzer) to identify the contaminants and to quantify their size and liberation.

    Jan 1, 2016

  • CIM
    Copper Oxide Flotation Using the Combined Collectors of Benzohydroxamic Acid and Butyl Xanthate

    By Jun Xiao, Xiaodong Li, Chunming He, Daixiong Chen

    "Benzohydroxamic acid with double dentate can react with copper to form cyclic hydroxyl oxime acid copper chelate, indicating a good selectivity for copper oxide minerals flotation, especially for mal

    Jan 1, 2016

  • CIM
    Methods of Haulage in Coal Mines

    By W. M. G. Heeley

    In the province of Alberta the coal measures dip at so many different angles, between the horizontal and the vertical, that many different systems of haulage are in use. I will, however, only touch br

    Jan 1, 1925