Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Partners for Mutual Benefits ? Training by Inclusiveness

    Training by Inclusiveness ?Background ?Video ?Results ?Partners ?How SEM works ?Future of SEM Background: Inclusivity partners ?Northwest Community College ?Smithers Exploration Group ?With

    May 1, 2010

  • CIM
    Developing and Equipping No. 4 Winze, San Antonio Mine

    By W. S. Hegler

    Introduction The San Antonio mine is on the north shore of Rice lake, thirty miles east of lake Winnipeg and 120 miles northeast of the city of Winnipeg. Since production was started in 1932, about

    Jan 1, 1949

  • CIM
    Improved Model to Assess Stress Condition on Buried Pipelines Affected by Mine Subsidence

    By B. Qiu

    The large surface ground movements induced by underground mining could threaten the safety of the pipelines laid across the subsidence-prone area. Existing analytical methods for the stress analysis o

    Aug 1, 2013

  • CIM
    Simulation of Dilation Behavior of Brittle Rocks using a Grain-Based Model

    By R. Noorani, M. Cai

    "Excavation of deep underground openings in highly stressed grounds can generate new fractures near the openings. As a result, rock mass bulking may occur, leading to large wall deformation. A better

    Jan 1, 2015

  • CIM
    Production Methods in the Turner Valley Field

    By S. G. Coultis

    Turner Valley is in the foothills of the Rocky mountains, at an altitude of 4,000 feet, and is 42 miles south west of Calgary. The present producing area is 8 miles long by 1 1/2 miles wide, while dri

    Jan 1, 1929

  • CIM
    OPSCAP Victor Project's Transition to Operations

    By Brian Rausch

    Agenda ?? Refresher: Victor Project Execution ?? Operations Capability roadmap: ? Operations staffing starter group: design participation ? Operations staffing build up for production start-up ?

    May 1, 2009

  • CIM
    Development of a Process for the Production of Lightweight Aggregate and Pozzolan From Lakeview Generating Station Fly Ash

    By J. F. Boux

    "The study of the total utilization of fly ash has involved all of the known technology in the processing of this waste material into useful products. In addition, a complete knowledge of all the poss

    Jan 1, 1970

  • CIM
    Observed Detonation Pressures of Blasting Agents

    By Alan Bauer, Melvin A. Cook

    Measured detonation pressures of "prills and oil" (94/6 ammonium nitrate/fuel oil) and three of the new "slurry" blasting agents are presented and compared with computed, ideal detonation pressures an

    Jan 1, 1961

  • CIM
    The emission control system on the Volvo BM 861 U underground truck

    By J. P. Mogan, E. D. Dainty, K. Katsuyama

    "The Volvo BM 861 U articulated truck is one of the few underground diesel units manufactured by an organization which shares the same corporate roof as the engine manufacturer. As a consequence, the

    Jan 1, 1981

  • CIM
    Application of Advanced Directional Drilling and Artificial Permeability Creation for In-Situ Recovery of Minerals

    By K. R. Brown, P. L. Krawchuk

    In-situ recovery (ISR) is under increased investigation as a viable methodology for the extraction of minerals in ore bodies that may be uneconomic to mine by traditional methods or for resources situ

    Jan 1, 2019

  • CIM
    The Future is Open - On-Equipment Computing at Teck

    By Peter Cunningham

    Teck Facts and Figures ? Employ more than 14,000 around the world, includes: ? Over 8,600 in Canada (close to 7,800 in British Columbia) ? Close to 2,000 in Chile ? Over 2,700 in Peru ? Approxima

    Aug 1, 2013

  • CIM
    Designing New Feed and Discharge End Liners for Dry Ag Mills at the Gol-E-Gohar Iron Ore Concentration Plant

    By S. Banisi, A. Haji-Zadeh, A. R. Hasankhoei, M. Maleki-Moghaddam

    At the concentration plant of the Gol-E-Gohar Iron Ore Company (Iran) three 9m × 2.05m AG (Autogenous) mills (fixed speed) are used in parallel in a dry operation. The test works conducted in a scale

    Jan 1, 2016

  • CIM
    Isotopic and Fluid Inclusion Constraints on the Origin of Vein Au Mineralization at Bousquet Township, Quebec

    By Lawrence D. Hoy, Armand Savoie, Pierre Trudel, Ghislaln Tourigny, Robert Crépeau, Lao Kheang

    "Recent fluid inclusion and stable isotopic studies in the Bousquet mining district have identified spatial and temporal trends in mineralization temperatures and isotopic compositions of vein forming

    Jan 1, 1990

  • CIM
    Hardening Drill Steel with the Radiation-Type Thermocouple

    By Charles G. Kemsley

    IN January, 1939, Dome Mines, Limited, purchased a few bars of an alloy drill-steel for the purpose of testing its fatigue resisting qualities as compared with those of a straight carbon-steel then in

    Jan 1, 1941

  • CIM
    The compression-percolation test for mine tailings backfill

    By R. J. Mitchell

    "A lest apparatus has been developed for obtaining the relations among confining stress, porosity and percolation rate for hydraulic sand backfills. The apparatus can also be used to evaluate internal

    Jan 1, 1981

  • CIM
    The geology of the Ansil deposit, Rouyn-Noranda, Quebec

    By Gérald Riverin, Bernard Salmon, Marlo Gagnon, Réemi Asselin, Alain Cazavant, Michel LaBrie

    "The Ansil deposit is located in the Noranda mining camp in the southern part of the Abitibi greenstone belt. /twas discovered in 1981 and production began in 1989 with proven reserves of 1.58 Mt grad

    Jan 1, 1990

  • CIM
    Canam Deposit

    By W. R. Bacon

    "The Canam property is in southern British Columbia, 24 miles southeast of Hope. It is reached by 5 miles of road from Mile 26 on the Hope-Princeton Highway.Between the years 1930, when the property w

    Jan 1, 1949

  • CIM
    Iron Hydrolysis in the Direct Nickel Process

    By F. McCarthy, R. McDonald, G. Woodbridge, G. Brock, D. Robinson

    "The Direct Nickel process is a hydrometallurgical technology being developed to treat nickel laterite ores by leaching at atmospheric pressure. The leaching process uses nitric acid in a relatively l

    Jan 1, 2016

  • CIM
    Mining narrow veins by vertical crater retreat at the Radiore No.2 Mine

    By Al Goodier

    "This paper discusses the experience of Noranda Mines Limited, Matagami Division, with the vertical crater retreat (VCR) method in the mining of narrow-vein stopes. Although limited to only one stope,

    Jan 1, 1982

  • CIM
    The Red Dog Mine

    By W. R. Hargrave

    "Mining OperationsOre will be mined by open pit techniques. Because of the high grade of the deposit and the low strip ratio, mining rates are small relative to most other open pit operations.The ore

    Jan 1, 1989