Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mogador Sulphide Deposit (Vendome Mines Limited)

    By P. R. Geoffoy, T. Koulomzine

    "The discovery of the Mogador deposit concealed by 100 feet of overburden was the result of combined application of geological reasoning, ground geophysical surveys, studies of glacial float and exten

    Jan 1, 1960

  • CIM
    A Biconcave Shape Bond Model for Rock Deformation

    By Chia-Chi Chiu, Meng-Chia Weng, Tsan-Hwei Huang

    "This paper proposes a biconcave shape bond model for the distinct element method (DEM) to simulate cementation between two circular particles in geomaterials. Rather than an original parallel bond mo

    Jan 1, 2015

  • CIM
    SEM-XMAP: Scanning Electron Microscopy and X-Ray Dot-Mapping Applied to Cemented Paste Backfill

    By Serge Ouellet

    Identification and quantification of cementitious phases in cemented paste backfill (CPB) is difficult due to the fineness of tailings and the low binder content used in the mixture. Techniques such a

    May 1, 2007

  • CIM
    The Intec Zinc Process

    By J. Moyes

    The Intec Process is a generic process for the production of pure base metals and precious metals from sulphides concentrates derived from copper, nickel, zinc and lead ores. The development program f

    May 1, 2002

  • CIM
    High Strength Aerated Cement Bulkheads for Target Gold Mine, South Africa

    By D. J. R. Ras

    A sub-level open stoping method is being used to mine the massive deposits at TARGET Gold Mine which uses cemented tailings to backfill the stopes. This requires the construction of bulkheads to conta

    May 1, 2007

  • CIM
    A Review of ISL Mining at the Highland Uranium Project

    By Laurence McGonagle

    "The Highland Uranium Project (HUP) is located approximately sixty miles northeast of Casper, Wyoming and is owned and operated by Power Resources, Inc. (PRI). With an annual production of680 tonnes (

    Jan 1, 1998

  • CIM
    Toward the 24 hour large SAG Mill Reline

    By John Russell

    "Faster, safer, grinding mill relining offers the obvious attractions of reduced mill relining times with the knock-on incentive to reduce all other maintenance down-time, opening the possibility for

    Jan 1, 2008

  • CIM
    Froth Flotation: The Kinetic Approach

    By R. R. Klimpel

    "SYNOPSISA discussion of the importance of flotation rate in the analysis of mineral flotation is presented. In particular, the highly interactive nature of the flotation ""system"" is emphasized wher

    Jan 1, 1984

  • CIM
    Enhancements in the interpretation of geochemical data using multivariate methods and digital topography

    By E. C. Grunsky, B. W. Smee

    "The development of low-cost, rapid multielement analytical techniques has generated large geochemical databases in many exploration programs. When a sampling program consists of several thousand samp

    Jan 1, 2003

  • CIM
    The Adams Mine Iron Ore to Pellets

    By G. B. Bell

    "INTRODUCTION On February 1, 1962, after five years of exploration and research, Jones & Laughlin Steel Corporation announced that they would develop the Adams Mine. Plant construction began immediate

    Jan 1, 1973

  • CIM
    The Ecstall Story: The Electrolytic Zinc Plant

    By Edwin G. Sharp, Frank S. Gaunce, George M. Freeman, Denis J. Kemp, Eric Dulson, Paul Salmon, Ernest R. Hamilton, Carl E. Parden

    "THE ECSTALL ZINC PLANT was built for the treatment of the Kidd Creek zinc sulphide concentrates. Construction proceeded throughout 1970-71, with operations beginning in April 1972. The two concentrat

    Jan 1, 1974

  • CIM
    Application of Cave-Scale Rock Degradation Models in the Imaging of the Seismogenic Zone

    By J. R. Andrews, R. P. Young, J. M. Reyes-Montes

    "Microseismic monitoring provides insight into the location and extent of rock-mass fracturing induced by cave mining, enabling interpretation of the cave profile and validation of predictive numerica

    Jan 1, 2016

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming (3f914add-ff63-4567-994a-ce69fb049d25)

    By G. McIsaac

    "This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore

    Jan 1, 2005

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming

    By G. McIsaac

    This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z

    Sep 1, 2005

  • CIM
    Man-Less Underground Mining ? Hurdles on the way to Make Dreams Come True

    By Jacek Paraszczak

    For mining companies facing strong international competition and unfavorable commodities? prices, automation of underground operations has got a potential to increase productivity and help cut cost. H

    May 1, 2001

  • CIM
    Ingénierie de la maintenance, de la conception à l?exploitation

    By Turcotte. Yves-Laurent

    Notre conférencier, Monsieur Yves L. Turcotte, Vice-président et Directeur général chez Promaintech Novaxa est diplômé en génie industriel de l?Université du Québec à Trois-Rivières et détient une maî

    Feb 1, 2008

  • CIM
    Development of Autoclave Technology

    By M. J. Collins

    "Autoclaves were first used in the metallurgical industry in 1893 to recover alumina from bauxite. In the 1940s and 1950s, several high temperature and pressure processes were invented in the laborato

    Jan 1, 2018

  • CIM
    Column Flotation in an Oilsand Application

    By Kim Wiwchar, Elizabeth Mbaja, Lynne Dang, Jim Furey, Anita Marks

    "Suncor Energy Inc., located north of Fort McMurray, Alberta, commenced pilot scale operation using a CPT 4’ diameter flotation column in March 2003. This larger scale trial follows two previously suc

    Jan 1, 2004

  • CIM
    SAG Mill Testing - An Overview of the Test Procedures Available to Characterize Ore Grindability

    By F. O. Verret

    Several grindability tests were developed over the years to design grinding circuits or optimize existing operations. Each test has its own strengths and weaknesses and it is imperative to select the

    Jan 1, 2012

  • CIM
    Co-Dependencies in Copper: Production, Price and Innovation Trends 1900–2018

    By Andrew Bamber

    Between the early 20th Century and the present, the production of mined copper ore has increased from tens of millions of tonnes per annum to several billion tonnes per annum, an unprecedented increas

    Jan 1, 2019