Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Implementing Process Design Changes in Process Plants

    The resource sector is conservative industry and people are resistant to change. The methods and procedures used to implement changes in process plants ultimately determine the success of such changes

    Jan 1, 2009

  • AUSIMM
    Statistics in the Study of Ventilation Problems

    Multiple regression analysis applied to ventilation records of stopes on the Witwatersrand showed that it was possible to estimate the temperature increase per 100 ft for a new stope with a standard d

    Jan 1, 1962

  • AUSIMM
    The4 Change in Performance of Disc Cutters when Stalled

    By Phillips H. R

    The action of free rolling disc cutters is well understood, relationships between disc geometry and performance having been established both in the laboratory and under field conditions. However, u

    Jan 1, 1981

  • AUSIMM
    Design Of Longhole Open Stoping At New Broken Hill Consolidated Limited With Particular Reference To Sloped Wall Mining

    The progress of longhole open stoping (LHOS) at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited (ZC/NBHC) is described. The design of a novel sloped wall longhole stoping me

    Jan 1, 1983

  • AUSIMM
    Development of a Continuous Process for the Selective Removal of Arsenic from Lead Bullion

    By Wiltshire PG

    The process uses sodium hydroxide and sodium nitrate reagents as in conventional Harris refining plants, selectively removing the arsenic to the caustic phase at an operating temperature of 420-450

    Jan 1, 1984

  • AUSIMM
    An Approach to the Flotation of Western Australian Nickel Ores

    By Tilyard P. A

    Recent exploration has established depos its of nickel sulphide in several areas of Western Australia. To assist in their develop- ment Amdel has investigated the beneficiation of many samples from

    Jan 1, 1973

  • AUSIMM
    Coal Production Scheduling Optimisation of Single Seam Open-Cast Mining

    By E Kozan

    The paper presents new developments of the methodology of open pit coal production scheduling optimisation. They deal with the specific features of the exploitation of single coal seam and utilisation

    Jan 1, 2003

  • AUSIMM
    Target Generation by Integrated Modelling in the Limpopo Region, South Africa

    By M Surtees

    The Limpopo region in southern Africa is considered to be a favourable target for the discovery of base and precious metal mineral deposits. The integration of gravity, geomagnetic, LANDSAT data and g

    Jan 1, 1993

  • AUSIMM
    A Review of Automation at Kalgoorlie Nickel Smelter

    By Campain RA, Horner NJ, Limerick JM

    The review covers the different concepts of automation which are appropriate to non-ferrous smelting and the degree to which the smelter, and the furnace in particular, is amenable to total automation

    Jan 1, 1985

  • AUSIMM
    In Preparation for High Technology

    It should be noted that with the passage of time all aspects of the mineral extraction process are becoming more sophisticated and complex. In order to deal with this, the education system should be g

    Jan 1, 1991

  • AUSIMM
    Statistical Experimental Design Approach in Coal Briquetting

    By S Pfaff, R Rajic

    In the case when the number of independent variables is greater, a careful design for carrying out tests has to be made in order to obtain, with the smallest possible number of tests, as much as possi

    Jan 1, 2003

  • AUSIMM
    Extraction of Gold in Hallide Media

    By Davis A, Song J

    A review of the literature indicated that several studies have been reported on the dissolution of gold using iodide/iodine, bromide/bromine leaching systems. Although the reagent costs are much che

    Jan 1, 1992

  • AUSIMM
    Evaluation Of Different Reactivation Systems Available For Carbons Used For Gold Recovery

    By LaBrooy S. R

    Crushing for the gold industry involves fine crushing and a degree of primary milling, and this presents new problems and challenges, partiuclarly on many of the new ore-bodies now being opened up.

    Jan 1, 1987

  • AUSIMM
    Mining of the Southern 1900 Orebody at Mount Isa

    By Li T

    Mining of the southern 1900 copper Orebody presented a challenge due to the complex geology, geometry and simultaneous extraction of the nearby lead/zinc/silver orebody. An integrated and co-operati

    Jan 1, 1995

  • AUSIMM
    Horizontal Cyclone Plant Trials at Bouganville Copper Limited

    By Noreen D

    At Bougainville Copper Limited comparison testwork was conducted between "horizontal" cycloning and conventional vertical cycloning. Horizontal cycloning reduces circulating load and allows increase

    Jan 1, 1988

  • AUSIMM
    Presidential Address: The 21st Century - Mining for Mankind: The Responsibility is ours

    Welcome to this 13th Congress of The Council of Mining and Metallurgical Institutions. It is twenty one years since The Australasian Institute of Mining and Metallurgy last hosted this congress an

    Jan 1, 1986

  • AUSIMM
    Feasibility Study Estimation of In-Situ Resources and Recoverable Ore Reserves for the Boddington Gold Mine

    By El-Ansary M

    Estimation of in-situ resources and recoverable ore reserves for the Boddington Gold Mine feasibility study was done by applying an essentially "classical" ore reserve method. This relied completely

    Jan 1, 1987

  • AUSIMM
    Process Design of a Regrind Facility at the Leinster Nickel Operations to Improve Concentrator Recovery

    By K E. Barns, P J. Sharman, S A. Thomas and

    This paper presents the development of a regrind facility design at BHP BillitonÆs Leinster Nickel Operations (LNO) in Western Australia. The recovery opportunity was identified from an analysis of pl

    Jan 1, 2007

  • AUSIMM
    Geological and Geotechnical Influences on Strip Mining Using In-Pit Bench Techniques

    By McManus D

    Situations where in-pit bench stripping methods are favourable are introduced. Examples from Peak Downs Mine are used as a guide to the range of methods available.A number of geological and geotechnic

    Jan 1, 1992

  • AUSIMM
    The Role of Allochtonous Terranes in Construction and Evolution of the Pacific Continental Margins (For North USSR)

    By Ushakov S

    New geological and geophysical in vestigation including our detailed field observation in different regions of the Koryak upland testify that Nor- theastern Eurasia margin eastward of the Ochotsk-C

    Jan 1, 1987