Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Highly Metamorphosed Ferromanganese Sediments in the Vicinity of the Broken Hill Orebody.

    Ferromanganese metasediments in the immediate vicinity of the Mid-Proterozoic Broken Hill Pb-Zn-Ag lodes, have undergone high grade (upper amphibolite facies) metamorphism,to form Mn-pyroxenoid (rhodo

    Jan 1, 1990

  • AUSIMM
    Urban Tunnelling Challenges - Mechanised Tunnelling to Improve Life Quality in Cities

    By U Rehm

    The biggest hard rock double-shield tunnel boring machine (TBM) in the world, with a diameter of 12.4 m, is currently excavating the North-South Bypass, which includes a crossing under the Brisbane Ri

    Jan 1, 2008

  • AUSIMM
    The Loy Yang Overburden System

    The Loy Yang Overburden System initially consists of a 60 000 tonne/day Bucket Wheel Excavator (BWE) (No. 14), a 2 m wide Conveyor System and a Travelling Stacker (No. TS4). The paper discusses deta

    Jan 1, 1982

  • AUSIMM
    Modelling of Shaft Displacement Due to Nearby Mining - Dome Gold Mine, Canada

    By Mandzic E. H

    The Dome Mine of Timmins Mining company is located in South Porcupine, N.W. Ontario. The orebody being mined partially lies in the No. 3 shaft pillar. Stability analysis has been carried out to est

    Jan 1, 1986

  • AUSIMM
    HMS Cyclone Development at Argyle Diamonds

    The heavy media cyclones at Argyle Diamonds are subjected to extremely abrasive service conditions and have been the subject of a development program from the time the first ore was treated in the

    Jan 1, 1996

  • AUSIMM
    The Economic and Operational Implications of Blast Vibration Limits

    By Chitombo GP

    The proposed guidelines on vibration limits that have been circulated by the Australian Environmental Council, demonstrate the need for an extensive data collection and evaluation program to avoid

    Jan 1, 1987

  • AUSIMM
    Land Rights and Exploration - A Case History

    In 1969, Queensland Mines Limited obtained two large Prospecting Authorities in Arnhem Land, Northern Territory, Australia. The Nabarlek uranium deposit containing some 12 000 t of U308 was discove

    Jan 1, 1986

  • AUSIMM
    Solid Solution of Tetrahedrite in Chalcopyrite and Bornite

    Records of ex-solution intergrowths with tetrahedrite as a component are rare. Intergrowths of this nature of tetrahedrite with galena have been described by Guild (1917) and Schneiderhohn (1922), and

    Jan 1, 1946

  • AUSIMM
    Improvement of Coal Tailings Disposal Via Understanding of Clay Chemistry

    By Bogar D. V

    Often dewatering of coal tailings is inhibited by the presence of clays, making it difficult to obtain a high concentration, handleable coal tailings. The net result can be a low concentration, choc

    Jan 1, 1995

  • AUSIMM
    An Interpretation of Tracer Results from an Operating Blast Furnace by a Dispersion Model

    By Polthier K

    A short discussion of the salient aspects of a dispersed flow model in relation to the gas flow in blast furnaces is given. The use of the theory in assessing vessel performance is mentioned. Tracer

    Jan 1, 1975

  • AUSIMM
    The Influence of Medium Rheology on the Separation of Minerals in Dense Medium Drums and Cyclones

    By Baguley PJ, Napier-Munn TJ

    This paper presents preliminary resu]ts from field studies which were conducted to establish, among other things. the influence of medium viscosity on the partitioning behaviour of dense medium cy

    Jan 1, 1987

  • AUSIMM
    Planning for Optimal Post-Mining Land Use (bdec56ac-e3cb-4751-a0ca-697e767dce0d)

    By Thatcher R

    In areas where land suitable for development is a scarce resource, an upgraded post-mining land use can result in economic benefits to both the mining company and to the community.A study undertaken a

    Jan 1, 1990

  • AUSIMM
    Staff Development and Training at Geita Gold Mine, Tanzania

    By C Kusi-Manu, E Nyamusika

    Geita Gold Mining Limited (GGML) is owned and jointly managed by Ashanti Goldfields Company (Ghana) and Anglogold (South Africa). The mine is currently one of the largest gold producing open pit opera

    Jan 1, 2003

  • AUSIMM
    Reliability Analysis of Semi-Continuous Coal Haulage System

    By Daxian Z, Youdi Z, Shucai Y

    The Huolinhe surface mine is a very large-scale surface coal mine, located in the north-east area of China with a production rate of 1.2 Mtpa. Its coal haulage system has a large capacity, long tran

    Jan 1, 1995

  • AUSIMM
    Agglomerate Flotation - A Method for Fine Particle Recovery

    By Hayward P. G

    Complex ores, characterised by intimate intergrowths between minerals, have previously been treated by flotation with limited success. The most common problem has been that the liberation size is of

    Jan 1, 1991

  • AUSIMM
    Coal Mine Modernisation and Production Reliability in China

    By Jiang G

    The Chinese Central Government attaches great importance to the development of its coal industry. Besides carrying out the policy of simultaneous development of large, medium and small coalmines,the m

    Jan 1, 1991

  • AUSIMM
    The Weipa Kaolin Project

    Comalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operation at Weipa. The plant will produce 100,000 tonne

    Jan 1, 1986

  • AUSIMM
    Assessment of the Explosibility of Gas Mixtures and Monitoring of Sample-Time Trends

    Previous methods for the assessment of the explosive potential of gas mixtures have required the plotting of apeexplosibility diagram. These became cumbersome if a large -number of assessments of

    Jan 1, 1981

  • AUSIMM
    Vaporization During the Combustion of a Complex Copper Concentrate

    A laminar-flow furnace technique was used to study the combustion of 37-53 µm size fraction of Woodlawn copper concentrate containing 7.4 per cent zinc, 5.0 per cent lead and 22.5 per cent copper

    Jan 1, 1985

  • AUSIMM
    Damage to Open Pit Slopes

    There is considerable economic incentive to increase the angle of open pit walls so as to reduce the total volume of waste to be moved to gain access to an orebody. However, a number of slope failures

    Jan 1, 1992